Discharge of cargo typically starts within 1-2 hours after a vessel is made fast, depending on port regulations.
Port regulations often dictate a maximum time limit, usually 1-2 hours after the vessel is made fast.
For example, in some ports, the discharge can begin immediately if all paperwork is in order.
Delays may occur due to customs inspections or other regulatory checks.
It's crucial to coordinate with the term...
Cargo pigging ensures efficient cleaning and maintenance of pipelines, minimizing contamination during product transfers.
Conduct a pre-pigging inspection to assess pipeline integrity and identify potential issues.
Coordinate with the operations team to schedule pigging activities during low-traffic periods to minimize disruption.
Select the appropriate type of pig (e.g., foam, scraper) based on the cargo type and pi...
Import and export procedures involve regulations, documentation, and logistics for international trade.
Understand trade regulations: Familiarize yourself with local and international trade laws.
Documentation: Prepare necessary documents like invoices, packing lists, and certificates of origin.
Customs clearance: Ensure compliance with customs regulations for both importing and exporting goods.
Logistics management: ...
Adani Ports and Special Economic Zone (APSEZ) was started in 1998.
Adani Ports and Special Economic Zone (APSEZ) was started in 1998 by the Adani Group.
It is the largest port developer and operator in India.
APSEZ operates ports in locations such as Mundra, Hazira, Dahej, Dhamra, and more.
The largest port in Adani is the Mundra Port.
Mundra Port is the largest port in Adani Group's portfolio
Located in Gujarat, India
Handles a wide range of cargo including containers, crude oil, coal, and more
The CEO of Adani Ports is Karan Adani, who is the son of the founder Gautam Adani.
CEO of Adani Ports is Karan Adani
Son of founder Gautam Adani
Karan Adani took over as CEO in 2020
Alignment of yard conveyor is crucial for smooth operation and efficiency.
Ensure all components of the conveyor are properly aligned
Use laser alignment tools to check and adjust alignment
Regularly inspect and maintain conveyor to prevent misalignment
Adjust tension and tracking of belts to ensure proper alignment
Consult manufacturer's guidelines for specific alignment procedures
There are various safety devices used in yard conveyors to prevent accidents and ensure safe operation.
Emergency stop buttons
Safety interlock switches
Safety barriers/guards
Warning signs and signals
Safety sensors for detecting obstacles or personnel in the conveyor path
Containers are standardized shipping units used for transporting goods by sea, land, or air.
Containers come in various sizes, such as 20ft and 40ft.
They are typically made of steel and have standardized dimensions to ensure compatibility with transportation infrastructure.
Containers are used for transporting a wide range of goods, from electronics to food products.
Containerization revolutionized the shipping indus...
I solve errors by identifying the root cause, implementing corrective actions, and preventing future occurrences.
Identify the root cause of the error by analyzing the documentation and communication with relevant parties.
Implement corrective actions such as updating the documentation, rectifying the mistake, and informing stakeholders.
Prevent future occurrences by establishing quality control measures, conducting ...
I appeared for an interview in Jan 2025.
I am motivated to work for this company because of its innovative approach to technology and its commitment to employee growth and development.
The company's reputation for cutting-edge technology and innovation excites me
I am impressed by the company's focus on employee growth and development opportunities
I believe in the company's mission and values, and want to contribute to its success
I appeared for an interview in Apr 2025, where I was asked the following questions.
I am a dedicated Senior Engineer with a passion for innovative solutions and a strong background in project management and team leadership.
Over 10 years of experience in software development, specializing in full-stack web applications.
Led a team of engineers to successfully deliver a complex project ahead of schedule, improving client satisfaction by 30%.
Proficient in multiple programming languages, including Python, ...
As a Senior Engineer, I lead projects, mentor teams, and ensure technical excellence in design and implementation.
Lead cross-functional teams to deliver complex engineering projects on time and within budget.
Mentor junior engineers, providing guidance on best practices and technical skills.
Design and implement scalable systems, such as a microservices architecture for a high-traffic application.
Conduct code reviews to ...
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
My aim is to apply my skills and knowledge to contribute to the success and growth of the company.
To utilize my technical expertise in mechanical engineering to solve complex problems and improve processes within the company.
To collaborate with the team to implement innovative solutions and drive efficiency in operations.
To continuously learn and develop new skills that will benefit the company in the long run.
To work ...
Operation delays in our department are typically caused by equipment malfunctions, lack of resources, and miscommunication.
Equipment malfunctions can lead to downtime and delays in completing tasks.
Lack of resources such as manpower or materials can slow down operations.
Miscommunication between team members or departments can result in confusion and delays in decision-making.
Proper maintenance schedules and regular equ...
There are various safety devices used in yard conveyors to prevent accidents and ensure safe operation.
Emergency stop buttons
Safety interlock switches
Safety barriers/guards
Warning signs and signals
Safety sensors for detecting obstacles or personnel in the conveyor path
PTW stands for Permit to Work. It is a formal written system used to control certain types of work that are identified as potentially hazardous.
PTW is used to ensure that work is carried out safely and in accordance with established procedures.
It involves a formal written authorization before starting work in potentially hazardous areas.
PTW is commonly used in industries such as construction, oil and gas, and manufactu...
Alignment of yard conveyor is crucial for smooth operation and efficiency.
Ensure all components of the conveyor are properly aligned
Use laser alignment tools to check and adjust alignment
Regularly inspect and maintain conveyor to prevent misalignment
Adjust tension and tracking of belts to ensure proper alignment
Consult manufacturer's guidelines for specific alignment procedures
I appeared for an interview in Mar 2025, where I was asked the following questions.
I applied via AmbitionBox and was interviewed in Oct 2024. There was 1 interview round.
Adani Ports and Special Economic Zone (APSEZ) was started in 1998.
Adani Ports and Special Economic Zone (APSEZ) was started in 1998 by the Adani Group.
It is the largest port developer and operator in India.
APSEZ operates ports in locations such as Mundra, Hazira, Dahej, Dhamra, and more.
The largest port in Adani is the Mundra Port.
Mundra Port is the largest port in Adani Group's portfolio
Located in Gujarat, India
Handles a wide range of cargo including containers, crude oil, coal, and more
The CEO of Adani Ports is Karan Adani, who is the son of the founder Gautam Adani.
CEO of Adani Ports is Karan Adani
Son of founder Gautam Adani
Karan Adani took over as CEO in 2020
Cargo pigging ensures efficient cleaning and maintenance of pipelines, minimizing contamination during product transfers.
Conduct a pre-pigging inspection to assess pipeline integrity and identify potential issues.
Coordinate with the operations team to schedule pigging activities during low-traffic periods to minimize disruption.
Select the appropriate type of pig (e.g., foam, scraper) based on the cargo type and pipelin...
Discharge of cargo typically starts within 1-2 hours after a vessel is made fast, depending on port regulations.
Port regulations often dictate a maximum time limit, usually 1-2 hours after the vessel is made fast.
For example, in some ports, the discharge can begin immediately if all paperwork is in order.
Delays may occur due to customs inspections or other regulatory checks.
It's crucial to coordinate with the terminal ...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
I currently hold the position of Senior Assistant, where I support management and coordinate various administrative tasks.
Manage schedules and appointments for senior executives.
Coordinate meetings and prepare necessary documentation.
Assist in project management by tracking deadlines and deliverables.
Handle communication between departments to ensure smooth operations.
Provide support in preparing reports and presentati...
Types of cargo handling include bulk cargo, break bulk cargo, container cargo, and liquid cargo.
Bulk cargo - loose cargo such as grains, coal, and ore
Break bulk cargo - individually packaged items like machinery or vehicles
Container cargo - goods packed in standardized containers for easy transportation
Liquid cargo - liquids like oil, chemicals, or beverages transported in tanks or drums
Draft restrictions for next port arrival are important for safe navigation and compliance with port regulations.
Draft restrictions refer to the maximum depth a vessel can safely navigate in a particular port or waterway.
These restrictions are determined by factors such as water depth, tides, currents, and vessel size.
Vessels must adhere to draft restrictions to avoid running aground or causing damage to port infrastruc...
I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.
Drainage design for industrial projects and railways involves planning and implementing systems to manage water flow and prevent flooding.
Consider the topography and soil conditions of the site to determine the most suitable drainage system.
Design and construct drainage channels, culverts, and ditches to divert water away from critical areas.
Implement measures to control erosion and sedimentation, such as using erosion...
Bridge design as per seismic code involves incorporating specific structural features to ensure the bridge can withstand seismic activity.
Seismic codes provide guidelines for designing bridges to withstand earthquakes and other seismic events.
Design considerations include selecting appropriate materials, reinforcing the structure, and incorporating flexible joints.
Bridges may be designed with base isolation systems or ...
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
Easy question asking
Containers are standardized shipping units used for transporting goods by sea, land, or air.
Containers come in various sizes, such as 20ft and 40ft.
They are typically made of steel and have standardized dimensions to ensure compatibility with transportation infrastructure.
Containers are used for transporting a wide range of goods, from electronics to food products.
Containerization revolutionized the shipping industry b...
Top trending discussions
Some of the top questions asked at the Adani Ports and SEZ interview -
The duration of Adani Ports and SEZ interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 51 interview experiences
Difficulty level
Duration
based on 983 reviews
Rating in categories
Assistant Manager
313
salaries
| ₹4.8 L/yr - ₹15.5 L/yr |
Deputy Manager
201
salaries
| ₹8.5 L/yr - ₹20 L/yr |
Senior Engineer
137
salaries
| ₹4.1 L/yr - ₹12 L/yr |
Associate Manager
70
salaries
| ₹11.6 L/yr - ₹24.2 L/yr |
Electrical Engineer
64
salaries
| ₹2 L/yr - ₹6.9 L/yr |
CMA CGM
Hapag-Lloyd
Mediterranean Shipping Company
Wartsila