i
Afcons
Infrastructure
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
AC motor starters control the starting current and torque, protecting the motor from damage during startup.
Direct-On-Line (DOL) Starter: Simple and cost-effective, used for small motors.
Star-Delta Starter: Reduces starting current, suitable for larger motors.
Auto Transformer Starter: Provides variable voltage for smooth starting.
Soft Starter: Gradually increases voltage, reducing mechanical stress.
Variable Frequen...
Power supplies are classified based on voltage levels: low, medium, high, and extra-high voltage for various applications.
Low Voltage: Typically up to 1 kV, used in residential and commercial applications (e.g., 230V AC supply).
Medium Voltage: Ranges from 1 kV to 35 kV, used in industrial settings and for distribution networks.
High Voltage: Ranges from 35 kV to 230 kV, used for long-distance transmission of electr...
Safety rules at construction sites ensure worker protection and compliance with regulations to prevent accidents and injuries.
Conduct regular safety training sessions for all workers to ensure they understand safety protocols.
Use personal protective equipment (PPE) such as helmets, gloves, and safety goggles at all times.
Implement a strict fall protection plan when working at heights, including guardrails and harn...
Addressing site-related issues requires systematic problem-solving and effective communication with the team.
Identify the specific issue: For example, if there are delays in material delivery, assess the supply chain.
Communicate with the team: Hold a meeting to discuss the problem and gather input from all stakeholders.
Develop a solution: If equipment is malfunctioning, consider renting or borrowing similar equipm...
An erection schedule outlines the sequence and timing of lifting operations to ensure safety and efficiency during construction.
Assess site conditions: Evaluate ground stability and weather forecasts to determine lifting feasibility.
Sequence of lifts: Plan the order of lifting operations to avoid conflicts and ensure structural integrity.
Equipment availability: Ensure cranes and other lifting equipment are schedul...
GRN stands for Goods Receipt Note, a document confirming the receipt of goods in inventory.
GRN is used to document the receipt of goods from suppliers.
It serves as proof of delivery and is essential for inventory management.
Example: A company receives a shipment of raw materials and generates a GRN to confirm the quantity and condition.
GRNs help in matching invoices with received goods to ensure accuracy in paymen...
SES stands for Service Entry Sheet, used in SAP MM to confirm services rendered and facilitate invoice processing.
SES is a document used to record services provided by a vendor.
It is essential for service procurement processes in SAP MM.
SES allows for the verification of services before payment is made.
Example: If a contractor completes a maintenance job, an SES is created to confirm the work done.
SES can be linke...
Creating a Purchase Order in SAP MM involves several steps to ensure accurate procurement and inventory management.
Access the SAP GUI and navigate to the transaction code ME21N to create a Purchase Order.
Select the document type (e.g., Standard PO, Consignment PO) based on your procurement needs.
Enter the vendor's information in the 'Vendor' field to specify who you are purchasing from.
Fill in the material details...
Rate analysis involves estimating the cost of construction activities by evaluating material, labor, and overhead expenses.
Identify the work item: Determine the specific construction activity for which the rate analysis is being conducted.
Break down components: List all materials, labor, and overhead costs associated with the work item.
Gather market rates: Research current market prices for materials and labor to ...
I prefer locations that offer a balance of professional growth and personal comfort, ideally near urban centers with project opportunities.
Proximity to major construction projects, e.g., urban areas with ongoing infrastructure development.
Access to professional networks and resources, such as industry conferences in metropolitan cities.
Availability of amenities and lifestyle options, like parks and cultural activi...
I appeared for an interview in Jan 2025.
SPI, CPI, cost variance, and schedule variance are key performance indicators used in project management to measure project performance.
SPI (Schedule Performance Index) measures the efficiency of schedule performance. SPI = EV / PV. A value greater than 1 indicates ahead of schedule, less than 1 behind schedule.
CPI (Cost Performance Index) measures the efficiency of cost performance. CPI = EV / AC. A value greater than...
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
Currently working on implementing a new data analytics platform to improve reporting efficiency.
Identifying key requirements for the new platform
Developing a project plan with timelines and milestones
Collaborating with IT team to ensure smooth implementation
Testing and refining the platform before full deployment
Experienced MIS Manager with a background in data analysis and system optimization.
Over 5 years of experience in managing MIS systems
Skilled in data analysis and reporting tools such as SQL, Excel, and Tableau
Implemented process improvements resulting in 20% increase in efficiency
Led a team of analysts to successfully implement a new CRM system
I changed organizations quickly to pursue new opportunities for growth and development.
Opportunity for career advancement
Desire for new challenges
Better work-life balance
Company restructuring or downsizing
Relocation to a new city
Yes, I am willing to work in a remote location as long as the necessary resources are provided.
I am comfortable with remote work and have experience managing teams remotely.
I have a dedicated home office setup with reliable internet connection.
I am open to occasional travel for meetings or training sessions.
I am familiar with using collaboration tools like Slack, Zoom, and Trello for remote work.
I understand the import...
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I appeared for an interview in May 2025, where I was asked the following questions.
I prioritize tasks, utilize project management tools, and collaborate with team members to ensure timely and efficient completion of work.
Set clear goals and deadlines for each project phase, such as completing initial designs within two weeks.
Use project management software like MS Project or Trello to track progress and manage resources effectively.
Conduct regular team meetings to discuss challenges and share updates...
I plan to complete my work through structured planning, effective communication, and continuous monitoring of project progress.
Develop a detailed project plan outlining tasks, timelines, and resources needed.
Utilize project management software to track progress and adjust schedules as necessary.
Conduct regular team meetings to ensure everyone is aligned and address any challenges.
Implement quality control measures at e...
As a Civil Structural Engineer, I oversee design, analysis, and project management to ensure safe and efficient structures.
Conduct structural analysis to determine load-bearing capacities and material strengths.
Design structures such as bridges and buildings, ensuring compliance with safety codes.
Collaborate with architects and other engineers to integrate structural elements into overall designs.
Prepare detailed const...
Planning is the process of setting goals, determining actions to achieve those goals, and allocating resources to accomplish the goals.
Setting goals and objectives
Identifying actions and tasks needed to achieve the goals
Allocating resources such as time, money, and manpower
Creating schedules and timelines
Monitoring progress and making adjustments as needed
During my internship, I assisted in creating project schedules, tracking progress, and analyzing delays.
Assisted in creating project schedules using software like Primavera P6
Tracked progress by updating Gantt charts and critical path analysis
Analyzed delays by identifying causes and proposing mitigation strategies
I appeared for an interview in Aug 2024.
Tyre size refers to the dimensions of a tire, including width, aspect ratio, and diameter.
Tyre size is typically expressed as a series of numbers and letters on the sidewall of the tire.
The first number represents the width of the tire in millimeters.
The second number is the aspect ratio, which is the height of the tire's cross-section as a percentage of the width.
The final number is the diameter of the wheel that the ...
Pan mixer is a stationary mixer with a single shaft while twin shaft mixer has two horizontal shafts rotating in opposite directions.
Pan mixer has a single shaft while twin shaft mixer has two horizontal shafts
Twin shaft mixer provides better mixing efficiency and homogeneity compared to pan mixer
Pan mixer is suitable for smaller batches while twin shaft mixer is used for larger production volumes
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Maintain regular communication and interaction with all staff members.
Regularly check in with staff to ensure they have the resources and support they need
Hold regular team meetings to discuss project progress and address any concerns
Encourage open communication and feedback from all team members
Provide opportunities for team building and collaboration
Lead by example by being accessible and approachable to all staff me...
Top trending discussions
The duration of Afcons Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 226 interview experiences
Difficulty level
Duration
based on 2.6k reviews
Rating in categories
Mumbai,
Mumbai Suburban
+14-9 Yrs
Not Disclosed
Senior Engineer
394
salaries
| ₹5 L/yr - ₹18 L/yr |
Planning Engineer
194
salaries
| ₹4.5 L/yr - ₹12 L/yr |
Executive Engineer
183
salaries
| ₹3.5 L/yr - ₹12 L/yr |
Civil Engineer
176
salaries
| ₹2 L/yr - ₹9.8 L/yr |
Assistant Manager
161
salaries
| ₹7.9 L/yr - ₹16.1 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company