I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.
Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.
Hazard communication standards require employers to provide information about hazardous chemicals used on site.
Scaffolding safety regulations cover proper construction, use, and maintenan...
AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.
AISC 360 - Specification for Structural Steel Buildings
AISC 341 - Seismic Provisions for Structural Steel Buildings
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
Peb buildings are structures made from pre-engineered building systems, offering flexibility and efficiency in construction.
Peb stands for Pre-Engineered Building, which is designed and manufactured off-site.
They are often used for industrial, commercial, and institutional purposes.
Examples include warehouses, factories, and sports complexes.
Peb structures are known for their quick assembly and cost-effectiveness.
They ...
Top trending discussions
posted on 12 Oct 2021
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
Mechanical engineers play a crucial role in building a sky-scraper by designing and implementing the mechanical systems.
Designing and implementing HVAC systems to regulate temperature and air quality
Designing and implementing plumbing systems for water supply and drainage
Designing and implementing elevator and escalator systems for vertical transportation
Designing and implementing fire protection systems to ensure safe...
I excel in communication and adaptability, but I sometimes struggle with delegating tasks effectively.
Strength: Strong communication skills - I ensure all team members are aligned by holding regular check-ins.
Strength: Adaptability - I successfully managed a project that shifted scope mid-way, adjusting timelines and resources.
Weakness: Difficulty in delegation - I tend to take on too much myself, which I am working to...
Experienced Project Manager with a strong background in leading cross-functional teams and delivering successful projects on time and within budget.
Over 8 years of experience in project management across various industries, including IT and construction.
Successfully led a team of 15 in a software development project that increased client satisfaction by 30%.
Skilled in Agile and Waterfall methodologies, having implement...
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
based on 2 interview experiences
Difficulty level
Duration
based on 6 reviews
Rating in categories
Associate Checker
47
salaries
| ₹2.5 L/yr - ₹7.1 L/yr |
Tekla Modeller
35
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Associate Detail Engineer
31
salaries
| ₹2.6 L/yr - ₹7.5 L/yr |
Detailer Associate
30
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Associate Modeler
22
salaries
| ₹3 L/yr - ₹10.5 L/yr |
McNally Bharat Engineering
Bahwan Engineering
Eversendai
Descon Engineering