Filter interviews by
Cube acceptance criteria refers to the set of standards or requirements that a cube must meet in order to be accepted or approved.
Cube dimensions must meet specified tolerances
Surface finish must meet specified standards
Cube must pass specified strength or durability tests
Cube must meet any other specified criteria for acceptance
Different types of pile include friction piles, end-bearing piles, and composite piles.
Friction piles rely on skin friction along the length of the pile for support.
End-bearing piles transfer the load to a strong layer of soil or rock at the bottom.
Composite piles combine different materials like concrete and steel for added strength.
Other types include sheet piles, helical piles, and screw piles.
M30 stands for a metric thread size commonly used in engineering and manufacturing.
M30 refers to a metric thread size with a diameter of 30mm
It is commonly used in engineering and manufacturing for fastening components
Examples of M30 fasteners include bolts, screws, and nuts
The code for UPV test is ASTM C597.
ASTM C597 is the standard code for Ultrasonic Pulse Velocity (UPV) test.
UPV test is commonly used in construction to assess the quality of concrete.
The test involves sending ultrasonic pulses through the concrete and measuring the time taken for the pulses to travel through the material.
Workability of concrete refers to its ease of mixing, placing, and compacting without segregation or bleeding.
Workability is influenced by water content, aggregate size and shape, and admixtures.
Concrete with high workability is easier to place and compact, while low workability may require more effort.
Examples of tests to measure workability include slump test, flow table test, and Vebé test.
Admixtures are chemicals added to concrete to enhance its properties or performance.
Admixtures can improve workability, durability, strength, and set time of concrete.
Examples of admixtures include water reducers, accelerators, retarders, and air-entraining agents.
Procedures for billing involve preparing invoices, verifying accuracy, sending to clients, and following up on payments.
Prepare detailed invoices based on project scope and work completed
Verify accuracy of billing information, including rates, quantities, and discounts
Send invoices to clients through email or mail
Follow up on payments and resolve any billing discrepancies
Maintain records of all billing transaction...
IS codes for billing & concrete in construction industry
IS 456:2000 - Code of practice for plain and reinforced concrete
IS 3370:1965 - Code of practice for concrete construction
IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement
IS 4985:2000 - PVC pipes for potable water supplies
The slump cone test measures the consistency and workability of fresh concrete.
The slump cone test is a standard test used in the construction industry.
It measures the consistency and workability of fresh concrete.
A slump cone is a mold in the shape of a truncated cone.
The test involves filling the cone with fresh concrete, compacting it, and then removing the cone to measure the slump or settlement of the concret...
A motor is an electrical device that converts electrical energy into mechanical energy, while a starter is a device that starts the motor.
A motor consists of a rotor and a stator, which work together to produce rotational motion.
Motors are used in a wide range of applications, from powering industrial machinery to driving electric vehicles.
A starter is typically used to provide the initial burst of power needed to...
I have worked on various equipment including pumps, compressors, heat exchangers, and turbines.
Pumps
Compressors
Heat exchangers
Turbines
I have experience working with various metals including steel, aluminum, and titanium.
Experience with welding, machining, and fabrication of steel components
Knowledge of aluminum casting processes and properties
Worked with titanium in aerospace applications
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
Procedures for billing involve preparing invoices, verifying accuracy, sending to clients, and following up on payments.
Prepare detailed invoices based on project scope and work completed
Verify accuracy of billing information, including rates, quantities, and discounts
Send invoices to clients through email or mail
Follow up on payments and resolve any billing discrepancies
Maintain records of all billing transactions for...
IS codes for billing & concrete in construction industry
IS 456:2000 - Code of practice for plain and reinforced concrete
IS 3370:1965 - Code of practice for concrete construction
IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement
IS 4985:2000 - PVC pipes for potable water supplies
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Board wiring fan regulator
3 phase conection in motor
I appeared for an interview before Jun 2024, where I was asked the following questions.
Effective manpower distribution ensures optimal productivity and safety in formwork operations.
Assess project requirements: Evaluate the scope and timeline to determine the number of workers needed.
Skill matching: Assign tasks based on individual skills, e.g., experienced carpenters for complex formwork.
Shift planning: Organize shifts to maintain continuous workflow, ensuring adequate rest for workers.
Monitoring and ad...
Calculating quantity for formwork involves assessing dimensions, materials, and structural requirements for accurate estimates.
Determine the dimensions of the structure (length, width, height).
Calculate the area of formwork needed using the formula: Area = Length x Height.
Consider the type of formwork (e.g., plywood, steel) and its thickness.
Account for waste and overlaps in materials, typically adding 10-15%.
Example: ...
I appeared for an interview in Apr 2024.
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
I appeared for an interview before Feb 2024.
Cube acceptance criteria refers to the set of standards or requirements that a cube must meet in order to be accepted or approved.
Cube dimensions must meet specified tolerances
Surface finish must meet specified standards
Cube must pass specified strength or durability tests
Cube must meet any other specified criteria for acceptance
Different types of pile include friction piles, end-bearing piles, and composite piles.
Friction piles rely on skin friction along the length of the pile for support.
End-bearing piles transfer the load to a strong layer of soil or rock at the bottom.
Composite piles combine different materials like concrete and steel for added strength.
Other types include sheet piles, helical piles, and screw piles.
Workability of concrete refers to its ease of mixing, placing, and compacting without segregation or bleeding.
Workability is influenced by water content, aggregate size and shape, and admixtures.
Concrete with high workability is easier to place and compact, while low workability may require more effort.
Examples of tests to measure workability include slump test, flow table test, and Vebé test.
Admixtures are chemicals added to concrete to enhance its properties or performance.
Admixtures can improve workability, durability, strength, and set time of concrete.
Examples of admixtures include water reducers, accelerators, retarders, and air-entraining agents.
The code for UPV test is ASTM C597.
ASTM C597 is the standard code for Ultrasonic Pulse Velocity (UPV) test.
UPV test is commonly used in construction to assess the quality of concrete.
The test involves sending ultrasonic pulses through the concrete and measuring the time taken for the pulses to travel through the material.
M30 stands for a metric thread size commonly used in engineering and manufacturing.
M30 refers to a metric thread size with a diameter of 30mm
It is commonly used in engineering and manufacturing for fastening components
Examples of M30 fasteners include bolts, screws, and nuts
Top trending discussions
The duration of Corrival Corporate Services interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 20 interview experiences
Difficulty level
Duration
based on 155 reviews
Rating in categories
Engineer
11
salaries
| ₹3 L/yr - ₹5 L/yr |
Construction Engineer
10
salaries
| ₹2.5 L/yr - ₹6.1 L/yr |
Civil Engineer
9
salaries
| ₹3.3 L/yr - ₹5.2 L/yr |
Senior HR Executive
8
salaries
| ₹3 L/yr - ₹5 L/yr |
Electrician
8
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Vision India Services
Gi Group
Creative Hands HR Consultancy
Ven Consulting