I appeared for an interview in Sep 2024.
I have worked on various factory simulation projects focusing on optimizing production processes and resource allocation.
Developed a discrete event simulation model for a manufacturing line to identify bottlenecks and improve throughput.
Utilized AnyLogic software to simulate a supply chain process, analyzing the impact of different inventory strategies.
Collaborated with a team to create a virtual factory layout using s...
I have utilized various engineering tools for design, analysis, and project management in my previous roles.
CAD Software: Proficient in AutoCAD and SolidWorks for creating detailed engineering drawings.
Simulation Tools: Used ANSYS for structural and thermal analysis to validate designs.
Project Management: Familiar with tools like Microsoft Project and Trello for tracking project timelines and tasks.
Version Control: Exp...
I possess strong analytical, problem-solving, and communication skills, essential for an Associate Engineer role.
Analytical Skills: I excel at breaking down complex problems into manageable parts, as demonstrated in my capstone project where I optimized a system's efficiency by 20%.
Problem-Solving: I have a proven track record of troubleshooting technical issues, such as resolving a critical software bug under tight de...
I remain calm, prioritize tasks, and communicate effectively to navigate high-pressure situations successfully.
Stay calm: I take deep breaths and focus on the task at hand to avoid panic.
Prioritize tasks: I assess the situation and identify the most critical tasks to address first. For example, during a project deadline, I list tasks by urgency.
Effective communication: I keep my team informed about progress and challen...
I applied via Campus Placement
I applied via Campus Placement and was interviewed in Nov 2021. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Mar 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.
Notice period is the amount of time an employee must give before leaving a job.
Notice period is typically stated in the employment contract.
It can vary from company to company and can range from 1 month to 3 months.
During the notice period, the employee is expected to work as usual and hand over responsibilities.
Some companies may allow employees to buy out their notice period by paying a fee.
Notice period is important...
Disclosing current salary and willingness to relocate are common questions in job interviews.
It is important to be honest about your current salary to avoid any discrepancies later on.
Express your willingness to relocate if necessary, but also discuss any potential concerns or conditions.
Consider the benefits of relocating to the base location, such as career growth opportunities or cost of living.
Provide examples of s...
I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
Aptitude Questions ,General Math Reasoning General English , Conceptual Questions based on software Engineering
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
Outages for line/switchyard are managed by the load dispatch centre through coordination and communication.
Outages are scheduled in advance to minimize impact on the grid and consumers.
Load dispatch centre coordinates with the concerned authorities to plan and execute the outage.
Alternative arrangements are made to ensure continuity of power supply during the outage.
Regular updates are provided to stakeholders regardin...
Double bus system is important for ensuring redundancy and reliability in power distribution.
Enhances reliability by providing backup in case of failure in one bus
Allows for maintenance work to be carried out on one bus while the other remains operational
Reduces the risk of power outages and downtime
Commonly used in critical infrastructure such as hospitals, data centers, and industrial facilities
I led a team to resolve a critical performance bottleneck in our application, enhancing user experience and system reliability.
Identified a major performance issue in our application that caused slow response times during peak usage.
Conducted a thorough analysis using profiling tools to pinpoint the root cause, which was inefficient database queries.
Collaborated with the database team to optimize queries and implement ...
based on 1 interview experience
Difficulty level
Duration
based on 22 reviews
Rating in categories
Analyst
465
salaries
| ₹5 L/yr - ₹18.9 L/yr |
Associate Analyst
432
salaries
| ₹3.5 L/yr - ₹11.6 L/yr |
Engineer
314
salaries
| ₹7.5 L/yr - ₹20 L/yr |
Senior Analyst
308
salaries
| ₹8.6 L/yr - ₹28 L/yr |
Senior Engineer
268
salaries
| ₹11.5 L/yr - ₹30 L/yr |
Suzlon Group
Adani Power
Adani Group
Torrent Power