Filter interviews by
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
I appeared for an interview before May 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in Aug 2022. There were 3 interview rounds.
I'm pleasure to make this interview by using aptitude test .duration 10min , Topic -on civil site work or surveying work
I'm happy to do this interview by using Assignment.
I applied via Walk-in
The current capacity of a 100KVA transformer at LV side depends on the voltage rating and the transformer's impedance.
The current capacity can be calculated using the formula: Current (A) = Power (VA) / (Voltage (V) * √3)
For example, if the voltage rating of the transformer is 415V, the current capacity would be approximately 144A.
The transformer's impedance also affects the current capacity. Higher impedance can limit...
I appeared for an interview before Jul 2016.
The deflection of a simply supported beam refers to the amount of bending or displacement that occurs when a load is applied.
The deflection of a simply supported beam depends on factors such as the length of the beam, the type of load applied, and the material properties of the beam.
It can be calculated using various methods such as the Euler-Bernoulli beam theory or finite element analysis.
The deflection of a simply s...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
A man day is a unit of measure representing the amount of work one person can complete in a single day.
Typically used in project management to estimate labor costs and timelines.
One man day usually equals 8 hours of work.
For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.
Helps in resource allocation and planning for projects.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I faced a critical project deadline with unexpected technical challenges, requiring quick problem-solving and team collaboration.
Led a team during a major software deployment that faced unexpected bugs just days before launch.
Implemented a rapid response strategy, organizing daily stand-ups to address issues in real-time.
Collaborated with cross-functional teams to identify root causes and develop effective solutions.
Su...
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
based on 6 interview experiences
Difficulty level
Duration
based on 99 reviews
Rating in categories
Assistant Manager
33
salaries
| ₹5 L/yr - ₹9.6 L/yr |
Manager
19
salaries
| ₹5.4 L/yr - ₹13 L/yr |
Site Engineer
15
salaries
| ₹2.5 L/yr - ₹4.5 L/yr |
Additional General Manager
14
salaries
| ₹21.2 L/yr - ₹30 L/yr |
Civil Engineer
14
salaries
| ₹1.8 L/yr - ₹4.9 L/yr |
L&T Construction
Simplex Infrastructures
L&T Energy Hydrocarbon
AECOM