Faster and better experience!
Filter interviews by
I applied via Referral and was interviewed before Mar 2023. There were 2 interview rounds.
Tests performed for Transformer testing at site include turns ratio test, insulation resistance test, winding resistance test, and polarity test.
Turns ratio test to check the turns ratio between primary and secondary windings
Insulation resistance test to check the insulation condition of windings
Winding resistance test to measure the resistance of the windings
Polarity test to ensure correct connection of windings
Top trending discussions
posted on 11 Apr 2020
Execution and profit can be managed by setting clear goals, monitoring progress, optimizing processes, and making data-driven decisions.
Set clear and measurable goals for the company
Monitor progress regularly and make adjustments as needed
Optimize processes to increase efficiency and reduce costs
Make data-driven decisions based on financial and operational data
Invest in employee training and development to improve perf...
I will implement strict safety protocols and provide proper training to ensure both man and machine are controlled at site.
Implement safety protocols to ensure compliance
Provide proper training to all personnel
Regularly inspect and maintain equipment
Enforce strict adherence to safety guidelines
Monitor and evaluate performance regularly
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.
posted on 24 Jul 2023
I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
Implemented a new CRM system to streamline customer interactions and increase sales.
Led cross-functional team to define project scope and requirements
Managed project timeline and budget to ensure on-time delivery
Provided training and support to staff for successful implementation
posted on 15 Apr 2025
I appeared for an interview in Mar 2025, where I was asked the following questions.
Constructing a water treatment plant involves planning, design, construction, and operation to ensure safe drinking water.
1. Planning: Assess water sources and community needs, e.g., conducting feasibility studies.
2. Design: Create detailed engineering plans, including layout and technology selection, e.g., choosing between filtration and chemical treatment.
3. Permitting: Obtain necessary environmental and construction...
I identified and resolved site issues by implementing structured processes, enhancing communication, and fostering a collaborative environment.
Conducted a thorough assessment of site operations to identify bottlenecks, such as delays in supply chain management.
Implemented a weekly cross-departmental meeting to improve communication and address issues proactively, resulting in a 20% increase in project efficiency.
Introd...
posted on 25 Jan 2025
I appeared for an interview in Dec 2024.
The interview was thorough and challenging, with a focus on leadership experience and problem-solving skills.
Discussed previous leadership roles and how I handled challenging situations
Gave examples of successful projects I managed and the outcomes
Talked about my problem-solving approach and strategies
Asked about my vision for the team and how I would drive success
I had a positive experience with the work culture in my previous job.
Encouraged collaboration and teamwork
Open communication between employees and management
Emphasis on work-life balance
Recognition and appreciation for hard work
Supportive and inclusive environment
I have over 10 years of experience in senior management roles, leading teams and driving strategic initiatives.
Led cross-functional teams to successfully launch new products
Implemented cost-saving measures resulting in a 15% increase in profitability
Developed and executed strategic plans to drive business growth
Managed key client relationships and negotiated contracts
Yes, I am open to relocating for the right opportunity.
I am open to relocating for the right opportunity
I have relocated for previous roles and am comfortable with the process
I am excited about the possibility of experiencing a new location and culture
I appeared for an interview before Apr 2024, where I was asked the following questions.
A diaphragm wall is a reinforced concrete wall used in deep excavations, requiring safe procedures for construction and stability.
Conduct thorough site investigations to assess soil conditions and groundwater levels.
Use appropriate equipment, such as hydraulic grabs or clamshells, for excavation.
Implement a dewatering plan to manage groundwater during construction.
Ensure proper reinforcement placement to enhance wall s...
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
Assistant Engineer
15
salaries
| ₹3 L/yr - ₹5.6 L/yr |
Management Trainee
13
salaries
| ₹6 L/yr - ₹9.7 L/yr |
Billing Engineer
9
salaries
| ₹3 L/yr - ₹7.4 L/yr |
DPT.Manager
8
salaries
| ₹8.6 L/yr - ₹15 L/yr |
Senior Planning Engineer
7
salaries
| ₹6 L/yr - ₹10.3 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures