Filter interviews by
Free length of pile can be calculated by subtracting the embedment depth from the total length of the pile.
Calculate the total length of the pile
Determine the embedment depth of the pile
Subtract the embedment depth from the total length to get the free length
Torsion in pier cap and girder design is considered by analyzing the distribution of torsional forces and designing the elements to resist them.
Consider the distribution of torsional forces along the length of the pier cap and girder.
Design the pier cap and girder to resist torsional forces by providing adequate reinforcement.
Use software tools like STAAD.Pro or SAP2000 to analyze the torsional effects and optimize the...
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Knowledge of building
I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
Kcc Buildcon interview questions for popular designations
NH stands for National Highway and is a major road network connecting different states in a country. Expressways are high-speed roads with controlled access and limited entry/exit points.
NHs are typically longer and connect major cities or states, while expressways are designed for high-speed travel between specific destinations.
NHs often have multiple lanes and allow for slower vehicles, while expressways usually have...
Get interview-ready with Top Kcc Buildcon Interview Questions
CBR value stands for California Bearing Ratio, a measure of the strength of a material or soil.
CBR value is used in civil engineering to evaluate the strength of road subgrades and base courses.
It is expressed as a percentage of the standard load required to penetrate a soil sample with a plunger of standard area.
Higher CBR values indicate stronger materials, while lower values indicate weaker materials.
For example, a ...
I applied via Company Website and was interviewed in May 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2022. There were 3 interview rounds.
Lease is a transfer of interest in land for a fixed term, while licence is a permission to use land for a specific purpose.
Lease involves transfer of interest in land, while licence does not
Lease is for a fixed term, while licence can be for a shorter duration
Lease gives exclusive possession to the tenant, while licence does not
Lease can be assigned or sublet, while licence cannot
Examples of lease include renting a hou...
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
Well steining in well foundation is designed by considering the soil conditions, water table level, and load requirements.
Evaluate soil conditions to determine the type and depth of well steining needed
Consider the water table level to prevent water seepage into the well
Design the well steining to withstand the expected loads and forces
Use materials such as concrete, steel, or timber for constructing the well steining
E...
Top trending discussions
Interview experience
based on 328 reviews
Rating in categories
Assistant Manager
45
salaries
| ₹4.6 L/yr - ₹8.4 L/yr |
Highway Engineer
34
salaries
| ₹2.4 L/yr - ₹5.6 L/yr |
Accountant
27
salaries
| ₹2.6 L/yr - ₹7.8 L/yr |
Senior Engineer
25
salaries
| ₹4.5 L/yr - ₹7.9 L/yr |
Site Engineer
23
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd