Progress between job planning and target is monitored closely to ensure project stays on schedule.
Regularly track progress against the project schedule
Identify any delays or obstacles and address them promptly
Adjust the plan as needed to stay on track
Communicate with stakeholders about any changes or updates
Use project management software to help monitor progress
PPEs are Personal Protective Equipment used to protect workers from hazards in the workplace.
PPEs include items such as helmets, gloves, goggles, and safety shoes.
They are necessary to prevent injuries and illnesses in the workplace.
Employers are responsible for providing appropriate PPEs to their employees.
Workers should be trained on how to properly use and maintain their PPEs.
Regular inspections of PPEs should ...
The covered area of the project is approximately 10,000 square feet.
The covered area includes the indoor space of the project.
It does not include any outdoor space or open areas.
The exact covered area may vary depending on the project.
In this particular project, the covered area is approximately 10,000 square feet.
I will assign tasks based on the strengths of each worker and use machines for heavy lifting and repetitive tasks.
Assess the skills and abilities of each worker
Assign tasks based on their strengths
Use machines for heavy lifting and repetitive tasks
Train workers to use machines safely and efficiently
Regularly maintain and repair machines to ensure they are functioning properly
Necessary steps during excavation work 5 meter deep by Excavator
Ensure proper shoring and bracing to prevent cave-ins
Regularly inspect the excavation site for any signs of instability
Provide adequate lighting and ventilation in the excavation area
Ensure proper communication between the excavator operator and ground personnel
Have a rescue plan in place in case of emergencies
Cracking in welding can occur due to various reasons such as improper welding technique, high stress, and material defects.
Improper welding technique such as using too much heat or not using enough filler material
High stress on the welded joint due to external forces or thermal expansion/contraction
Material defects such as impurities or inclusions in the base metal
Inadequate preheating or post-weld heat treatment
I...
Documentation is the process of recording information in a systematic way to ensure accuracy and traceability.
Documentation involves creating written or electronic records of processes, procedures, and activities.
It helps in maintaining a clear record of what has been done, by whom, and when.
Documentation ensures consistency, compliance with regulations, and facilitates knowledge transfer.
Examples include project ...
Safety aspect is essential. PPE stands for Personal Protective Equipment. Precautions include proper ventilation and use of gas detectors.
Safety is a top priority in any construction project.
PPE includes hard hats, safety glasses, gloves, and respirators.
Working in a remote and gaseous 2 meter deep area requires proper ventilation and use of gas detectors.
Workers should also be trained on emergency procedures in c...
Water cement ratio in concrete is the ratio of the weight of water to the weight of cement used in the mixture.
Water cement ratio is an important factor in determining the strength and durability of concrete.
A lower water cement ratio generally results in higher strength concrete.
If the cube strength differs by 12%, it indicates a significant variation in the concrete mix.
To address this, the water cement ratio ca...
There are different types of engines such as diesel, petrol, two-stroke, and four-stroke engines.
Diesel engines use compression ignition while petrol engines use spark ignition.
Two-stroke engines have a simpler design and are commonly used in small vehicles like motorcycles and scooters.
Four-stroke engines are more efficient and are commonly used in cars and larger vehicles.
Each type of engine has its own advantag...
I appeared for an interview in Aug 2024.
Data sharding is the process of splitting a database into smaller, more manageable parts called shards.
Data sharding helps distribute data across multiple servers to improve performance and scalability.
Each shard contains a subset of the data, allowing for parallel processing and faster query times.
Common sharding techniques include range-based sharding, hash-based sharding, and key-based sharding.
Examples of data shar...
Clustering is a technique used in data analysis to group similar data points together based on certain criteria.
Clustering is an unsupervised machine learning technique.
It is used to discover hidden patterns or groupings in data.
Common clustering algorithms include K-means, hierarchical clustering, and DBSCAN.
Example: clustering customers based on their purchasing behavior to identify different market segments.
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
Progress between job planning and target is monitored closely to ensure project stays on schedule.
Regularly track progress against the project schedule
Identify any delays or obstacles and address them promptly
Adjust the plan as needed to stay on track
Communicate with stakeholders about any changes or updates
Use project management software to help monitor progress
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2023. There were 2 interview rounds.
Documentation is the process of recording information in a systematic way to ensure accuracy and traceability.
Documentation involves creating written or electronic records of processes, procedures, and activities.
It helps in maintaining a clear record of what has been done, by whom, and when.
Documentation ensures consistency, compliance with regulations, and facilitates knowledge transfer.
Examples include project plans...
Attitudes and knowledge of software are crucial for a Department Head.
Strong knowledge of various software programs and applications is essential for effective management.
Positive attitudes towards learning new software and adapting to technological advancements are beneficial.
Experience in implementing software solutions to improve department efficiency and productivity is valuable.
I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.
Designing an offshore project involves planning, executing, and managing operations in a marine environment.
Identify project objectives and scope
Conduct feasibility studies and risk assessments
Select suitable location and design layout
Procure necessary equipment and materials
Implement safety measures and environmental protection protocols
Establish communication and logistics plan
Monitor progress and adjust plans as nee...
I applied via Walk-in and was interviewed before May 2022. There were 3 interview rounds.
PPEs are Personal Protective Equipment used to protect workers from hazards in the workplace.
PPEs include items such as helmets, gloves, goggles, and safety shoes.
They are necessary to prevent injuries and illnesses in the workplace.
Employers are responsible for providing appropriate PPEs to their employees.
Workers should be trained on how to properly use and maintain their PPEs.
Regular inspections of PPEs should be co...
Welding, cutting, and grinding work are common tasks in industrial settings that require proper safety measures to prevent accidents and injuries.
Ensure proper ventilation to prevent exposure to harmful fumes and gases
Use appropriate personal protective equipment (PPE) such as gloves, goggles, and masks
Inspect tools and equipment regularly for any defects or malfunctions
Follow proper procedures and guidelines for each ...
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for a better career prospect
I have relocated in the past for job opportunities
I am flexible and willing to move for the right role
I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.
Engine overhauling and maintenance are crucial for the smooth functioning of machinery.
Engine overhauling involves disassembling, cleaning, inspecting, repairing, and reassembling the engine.
Regular maintenance includes oil changes, filter replacements, and checking fluid levels.
Proper maintenance and overhauling can extend the life of machinery and prevent breakdowns.
It is important to follow manufacturer guidelines a...
There are different types of engines such as diesel, petrol, two-stroke, and four-stroke engines.
Diesel engines use compression ignition while petrol engines use spark ignition.
Two-stroke engines have a simpler design and are commonly used in small vehicles like motorcycles and scooters.
Four-stroke engines are more efficient and are commonly used in cars and larger vehicles.
Each type of engine has its own advantages an...
Some of the top questions asked at the Punj Lloyd interview -
The duration of Punj Lloyd interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 16 interview experiences
Difficulty level
Duration
based on 800 reviews
Rating in categories
Deputy Manager
39
salaries
| ₹6 L/yr - ₹13 L/yr |
Manager
34
salaries
| ₹8 L/yr - ₹18.8 L/yr |
Engineer
31
salaries
| ₹2 L/yr - ₹6.2 L/yr |
Senior Engineer
28
salaries
| ₹4.2 L/yr - ₹10 L/yr |
QA QC Engineer
25
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Megha Engineering & Infrastructures