One bag of gypsum board typically covers about 30 square meters, depending on thickness and application.
Coverage can vary based on the thickness of the gypsum board.
For example, a standard 12.5mm board covers less area than a 9.5mm board.
Always check manufacturer specifications for precise coverage.
Consider waste and cuts when calculating total area needed.
Screeding quantity is calculated by determining the area to be covered and the thickness of the screed layer.
Measure the area: Length x Width (e.g., 10m x 5m = 50m²).
Determine the thickness of the screed (e.g., 0.05m for 5cm).
Calculate volume: Area x Thickness (e.g., 50m² x 0.05m = 2.5m³).
Account for wastage: Add 5-10% to the total volume for wastage.
CRM enhances user experience on sites by managing customer relationships, personalizing interactions, and improving service efficiency.
Centralizes customer data for personalized marketing strategies.
Facilitates communication through automated emails and follow-ups.
Tracks customer interactions to improve service and support.
Enables segmentation for targeted campaigns, e.g., sending offers to loyal customers.
Integra...
I am drawn to CRM for its focus on customer relationships, strategy, and communication, which are vital for business success.
CRM roles emphasize relationship-building, which aligns with my passion for connecting with customers and understanding their needs.
I have experience in customer service, where I successfully resolved issues and improved customer satisfaction, showcasing my interpersonal skills.
This role all...
M sand passing through a 150 micron sieve typically ranges from 5% to 15%, ensuring proper grading for construction.
M sand, or manufactured sand, is produced by crushing rocks and stones.
The passing range of M sand through a 150 micron sieve is generally between 5% to 15%.
This range is crucial for ensuring the sand is fine enough for concrete applications.
For example, if 10% of the M sand passes through the 150 mi...
Pile foundations are used when surface soils are weak or unstable, requiring deeper support for structures.
Used in areas with weak or compressible soils, such as clay or silt.
Ideal for heavy structures like bridges, high-rise buildings, and industrial facilities.
Commonly employed in coastal or offshore constructions where soil conditions vary.
Example: Skyscrapers in urban areas often use pile foundations to reach ...
Creating a work schedule for a G+9 building involves planning tasks, resources, and timelines for efficient project execution.
Define Project Phases: Break down the construction into phases such as foundation, structure, roofing, and finishing.
Resource Allocation: Assign specific teams and equipment for each phase, e.g., concrete team for foundation work.
Timeline Estimation: Estimate the duration for each phase, e....
Auto levels, theodolites, and dumpy levels are essential surveying instruments with specific list counts for accuracy.
Auto Levels: Typically have a list count of 1 to 2 for basic leveling tasks.
Theodolites: Usually have a list count of 1 for angle measurements, but can vary based on model.
Dumpy Levels: Generally have a list count of 1 for leveling and height measurements.
Total Stations: Often have a list count of ...
I have worked on various projects, focusing on architecture design, urban planning, and sustainable building practices.
Led the design of a mixed-use development in downtown, integrating residential and commercial spaces.
Collaborated on a sustainable housing project that utilized renewable energy sources and eco-friendly materials.
Participated in urban planning initiatives aimed at improving public transportation a...
I am looking for a competitive salary that reflects my skills and experience, ideally in the range of $X to $Y.
Research industry standards: For example, similar roles in our region typically offer between $X and $Y.
Consider my experience: With over X years in the field, I believe a salary towards the higher end of that range is justified.
Flexibility: I am open to discussing the full compensation package, including...
Reinforcement and carpenter
I applied via Walk-in and was interviewed in Sep 2024.Ā There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2024.Ā There were 2 interview rounds.
Some general questions
Initiating substructure to finishing work involves proper planning, coordination, and communication.
Develop a detailed project plan outlining the sequence of activities from substructure to finishing work
Coordinate with subcontractors and suppliers to ensure timely delivery of materials and equipment
Communicate effectively with the project team to ensure everyone is clear on their roles and responsibilities
Regularly mo...
I handle my activities by prioritizing tasks, setting goals, creating schedules, delegating when necessary, and staying organized.
Prioritize tasks based on deadlines and importance
Set specific goals for each activity to stay focused
Create a schedule or to-do list to track progress
Delegate tasks to team members when needed to improve efficiency
Stay organized by keeping track of documents, emails, and meetings
My previous company was a construction firm specializing in commercial building projects.
Managed project timelines and budgets
Coordinated with architects, engineers, and subcontractors
Ensured compliance with building codes and regulations
Implemented quality control measures
Completed projects on time and within budget
Waterproofing is the process of making a structure or object resistant to water penetration.
Waterproofing can be done using various materials such as membranes, coatings, and sealants.
Proper surface preparation is essential before applying waterproofing materials.
Regular maintenance and inspections are necessary to ensure the effectiveness of waterproofing.
Examples of waterproofing methods include using waterproof memb...
BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.
Conduct a thorough analysis of the workplace to identify potential hazards and at-risk behaviors
Develop safety procedures and protocols based on the identified hazards
Train employees on the importance of following safety protocols and encourage reporting of unsafe behaviors
Im...
I applied via Walk-in and was interviewed in Aug 2024.Ā There were 2 interview rounds.
General knowledge skills
Worked as a Project Engineer at a construction company for 5 years.
Managed multiple civil engineering projects simultaneously
Coordinated with architects, contractors, and clients to ensure project success
Performed site inspections and quality control checks
Prepared project schedules and budgets
Resolved any issues or conflicts that arose during construction
I applied via Walk-in and was interviewed in Aug 2024.Ā There were 2 interview rounds.
General knowledge question
I applied via Walk-in and was interviewed in May 2024.Ā There were 3 interview rounds.
The number of concrete blocks required for 100sft depends on the size of the blocks and the thickness of the wall being built.
The number of concrete blocks needed can be calculated by dividing the total area (100sft) by the area of one block.
The size of the concrete block and the thickness of the wall will determine the number of blocks needed.
For example, if each concrete block is 1ft x 1ft and the wall is 4 inches th...
Concrete density is the mass per unit volume of concrete.
Concrete density is typically measured in kilograms per cubic meter (kg/m^3).
The density of normal concrete is around 2400 kg/m^3.
Higher density concrete, such as heavyweight concrete, can have densities up to 4000 kg/m^3.
Lightweight concrete, on the other hand, can have densities as low as 1600 kg/m^3.
The thickness for outer and inner walls plastering typically ranges from 12mm to 20mm.
The thickness of plastering for outer walls is usually around 15mm to 20mm.
The thickness of plastering for inner walls is typically around 12mm to 15mm.
The thickness may vary based on the type of wall surface and the desired finish.
It is important to ensure proper curing and finishing for a durable and aesthetically pleasing result.
Various types of formwork have been used in my recently worked companies, including timber formwork, steel formwork, and aluminum formwork.
Timber formwork is commonly used for small to medium-sized projects due to its cost-effectiveness and flexibility.
Steel formwork is preferred for large and complex structures due to its durability and reusability.
Aluminum formwork is lightweight and easy to handle, making it suitabl...
The mix proportion of plastering mortar typically consists of 1 part cement to 3-4 parts sand.
The mix proportion of plastering mortar is usually 1:3 or 1:4 (cement:sand)
The mix can also include lime to improve workability and durability
Water is added to achieve the desired consistency for application
Example: A common mix proportion for plastering mortar is 1 part cement, 3 parts sand, and water as needed
The materials required in 1m3 of plastering mortar include cement, sand, and water.
Cement is typically used in the ratio of 1:4 for plastering mortar.
Sand is used in the ratio of 3-4 times the amount of cement used.
Water is added as needed to achieve the desired consistency.
For example, for 1m3 of plastering mortar, you may need 0.25m3 of cement, 1m3 of sand, and water as needed.
Test was based on numerical, reasoning and verbal,Geometry,Profit & loss, Algebra, Simplication, trigonometry,Load calculation,etc
I am open to working in various states and countries, adapting to diverse engineering challenges and regulations.
Adaptability: I have experience working on projects in different states, such as a bridge design in California and a highway project in Texas.
Cultural Awareness: I understand the importance of local customs and practices, having collaborated with international teams in projects in Canada and Germany.
Regulato...
Yes, I am willing to work for 1-3 years at Sobha Ltd to contribute to the growth of the company and gain knowledge in the technical world of Civil engineering.
I am committed to continuous learning and professional development in the field of Civil engineering.
I understand the importance of gaining practical experience and knowledge to contribute effectively to the growth of the company.
I am excited about the opportunit...
In my recent roles, I held positions such as Project Engineer and Senior Design Engineer, focusing on infrastructure projects.
Project Engineer at XYZ Engineering: Managed a team for a major highway expansion project, ensuring timely completion and adherence to budget.
Senior Design Engineer at ABC Construction: Led the design of a multi-story commercial building, collaborating with architects and contractors.
Site Engine...
I applied via Walk-in and was interviewed in Nov 2024.Ā There were 2 interview rounds.
I got selected in this round
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power (kW) to apparent power (kVA) in a circuit.
It indicates how efficiently electrical power is being converted into useful work.
A power factor of 1 (or 100%) means all the power is being used effectively, while a power factor of 0 means none of the power is being used efficiently.
Power factor can...
A megger is used to measure the insulation resistance of electrical wires and equipment.
Used to detect insulation faults in wires and cables
Helps prevent electrical breakdowns and accidents
Can identify deteriorating insulation before it causes damage
Commonly used in electrical maintenance and testing
Example: A megger can be used to test the insulation resistance of a motor winding
I applied via Walk-in and was interviewed in Oct 2024.Ā There were 2 interview rounds.
I am prepared to work 12 hours a day, as I understand the demands of senior civil engineering projects and deadlines.
Project Deadlines: In civil engineering, meeting tight deadlines is crucial. For instance, during the construction of a bridge, extended hours may be necessary to ensure timely completion.
Site Management: Overseeing construction sites often requires long hours, especially during critical phases. For exam...
Yes, I am ready to work at night as required for the job.
I am willing to work night shifts to meet project deadlines
I understand the importance of flexibility in the engineering field
I have previous experience working night shifts on construction projects
I appeared for an interview in May 2025, where I was asked the following questions.
Calculate the number of tiles by determining the area to be covered and the area of each tile.
Measure the area of the floor or wall in square feet or meters.
Determine the size of the tile (e.g., 12x12 inches = 1 square foot).
Calculate the total area of the tiles needed by dividing the total area by the area of one tile.
Example: For a 100 sq ft area with 1 sq ft tiles, you need 100 tiles.
Consider adding 10% extra for cu...
To calculate the weight of steel, use the formula: Weight = Volume x Density.
Determine the volume of the steel object (e.g., for a beam: Volume = Length x Width x Height).
Use the density of steel, which is approximately 7850 kg/m³.
Example: For a steel beam 2m long, 0.1m wide, and 0.1m high: Volume = 2 x 0.1 x 0.1 = 0.02 m³.
Weight = Volume x Density = 0.02 m³ x 7850 kg/m³ = 157 kg.
Screeding quantity is calculated by determining the area to be covered and the thickness of the screed layer.
Measure the area: Length x Width (e.g., 10m x 5m = 50m²).
Determine the thickness of the screed (e.g., 0.05m for 5cm).
Calculate volume: Area x Thickness (e.g., 50m² x 0.05m = 2.5m³).
Account for wastage: Add 5-10% to the total volume for wastage.
One bag of gypsum board typically covers about 30 square meters, depending on thickness and application.
Coverage can vary based on the thickness of the gypsum board.
For example, a standard 12.5mm board covers less area than a 9.5mm board.
Always check manufacturer specifications for precise coverage.
Consider waste and cuts when calculating total area needed.
I applied via Walk-in and was interviewed in Jul 2024.Ā There were 3 interview rounds.
Top trending discussions
The duration of Sobha interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 189 interview experiences
Difficulty level
Duration
Senior Engineer
530
salaries
| ā¹2.8 L/yr - ā¹6.5 L/yr |
Project Engineer
448
salaries
| ā¹3.2 L/yr - ā¹8 L/yr |
Assistant Manager
328
salaries
| ā¹4 L/yr - ā¹11 L/yr |
Deputy Manager
232
salaries
| ā¹5 L/yr - ā¹12 L/yr |
Senior Executive
220
salaries
| ā¹2.5 L/yr - ā¹7.5 L/yr |
Godrej Properties
DLF
Surya Roshni
Emaar India Limited