Faster and better experience!
i
Spark
Minda
Filter interviews by
DFM (Design for Manufacturing) is the process of designing a product to optimize its manufacturability.
Consider manufacturing processes early in the design phase
Minimize the number of parts and components
Design for ease of assembly and disassembly
Use standard components and materials whenever possible
Collaborate closely with manufacturing engineers
I was responsible for driving sales growth at my last company by implementing strategic marketing campaigns and building strong relationships with clients.
Implemented targeted marketing campaigns to increase sales
Built strong relationships with clients to drive repeat business
Analyzed sales data to identify trends and opportunities for growth
Inventory management involves overseeing the flow of goods from manufacturers to warehouses to retailers, ensuring optimal levels are maintained.
Inventory management involves tracking and controlling the flow of goods from manufacturers to warehouses to retailers.
It includes forecasting demand, setting reorder points, and managing stock levels to prevent stockouts or overstocking.
Efficient inventory management can...
Thevenin's theorem states that any linear electrical network can be replaced by an equivalent circuit consisting of a single voltage source and a single series resistor.
The theorem simplifies complex circuits into simpler equivalent circuits for analysis.
It helps in determining the voltage and current across any component in the network.
The equivalent Thevenin voltage is the open-circuit voltage at the terminals o...
Capacitors store and release electrical energy in AC/DC circuits.
Capacitors block DC current while allowing AC current to pass through
Capacitors store energy in an electric field when connected to a DC circuit
Capacitors release stored energy in the form of AC current when connected to an AC circuit
A diode is a semiconductor device that allows current to flow in one direction only. Breakdown can occur due to excessive voltage or current.
Diode allows current to flow in one direction due to its PN junction
Breakdown can occur due to excessive voltage (avalanche breakdown) or excessive current (thermal breakdown)
Zener diodes are designed to operate in breakdown region for voltage regulation
Stability analysis in control systems involves assessing the stability of a system's behavior over time.
Stability analysis is crucial in ensuring that a control system operates predictably and reliably.
Methods such as root locus, Bode plot, and Nyquist plot are commonly used for stability analysis.
Stability criteria, such as the Nyquist stability criterion or Routh-Hurwitz criterion, are used to determine system s...
The process for Gdc, Lpdc, and secondary involves different methods of die casting and post-processing steps.
Gdc (Gravity Die Casting) involves pouring molten metal into a steel mold using gravity.
Lpdc (Low Pressure Die Casting) uses low pressure to fill the mold with molten metal.
Secondary processes include trimming, shot blasting, heat treatment, and machining to finish the casted parts.
Each process requires spe...
GD&T stands for Geometric Dimensioning and Tolerancing. It is required to specify the allowable variations in form, size, and orientation of parts in engineering drawings.
GD&T is a symbolic language used on engineering drawings to communicate design intent and ensure parts are manufactured correctly.
It allows for more detailed and precise specifications compared to traditional dimensioning methods.
GD&T helps to re...
The end to end design process involves planning, designing, implementing, and testing a product or system from start to finish.
Understand requirements and constraints
Create initial design concepts
Develop detailed design plans
Implement design through prototyping or coding
Test and validate design against requirements
Iterate on design based on feedback
Finalize design for production
I worked as a Senior Sales Executive at a multinational technology company.
Managed a team of sales representatives to achieve monthly targets
Developed and implemented sales strategies to increase revenue
Collaborated with marketing team to create effective promotional campaigns
Provided training and support to new sales staff
Regularly analyzed sales data to identify trends and opportunities for growth
I have experience handling various machines in my previous roles, including industrial equipment and office machinery.
Managed operation of CNC machines in a manufacturing plant
Maintained and repaired office printers and copiers
Trained on operating heavy machinery such as forklifts and cranes
I was responsible for driving sales growth at my last company by implementing strategic marketing campaigns and building strong relationships with clients.
Implemented targeted marketing campaigns to increase sales
Built strong relationships with clients to drive repeat business
Analyzed sales data to identify trends and opportunities for growth
Seeking new challenges and growth opportunities
Looking for new challenges to expand my skill set
Interested in opportunities for career advancement
Seeking a more dynamic work environment
Our tool room structure is organized and efficient, with designated areas for different tools and equipment.
We have separate sections for storing cutting tools, measuring instruments, and machinery.
Each tool is labeled and stored in its designated place for easy access and inventory management.
We follow a strict tool maintenance schedule to ensure all tools are in optimal condition for use.
Our tool room is equipped wit...
आपने जॉब के बारे में बताइए
I appeared for an interview in Dec 2024.
Inventory management involves overseeing the flow of goods from manufacturers to warehouses to retailers, ensuring optimal levels are maintained.
Inventory management involves tracking and controlling the flow of goods from manufacturers to warehouses to retailers.
It includes forecasting demand, setting reorder points, and managing stock levels to prevent stockouts or overstocking.
Efficient inventory management can help...
FIFO and LIFO are inventory management methods. FIFO stands for First In, First Out, while LIFO stands for Last In, First Out.
FIFO method assumes that the oldest inventory items are sold first.
LIFO method assumes that the newest inventory items are sold first.
FIFO is commonly used in industries with perishable goods, like food and beverages.
LIFO is often used in industries where inventory costs are rising, like electro...
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
Experienced Senior Executive with a proven track record in leading teams and driving business growth.
Over 10 years of experience in senior leadership roles
Successfully implemented strategic initiatives resulting in increased revenue by 30%
Strong communication and negotiation skills
Led cross-functional teams to achieve company goals
MBA in Business Administration from a top university
Seeking new challenges and opportunities for growth in a more dynamic environment.
Desire for career advancement
Seeking new challenges
Opportunities for growth
Change in work environment
My strength lies in my ability to effectively lead teams, make strategic decisions, and drive results.
Strong leadership skills
Ability to make strategic decisions
Drive results and achieve goals
Effective communication and collaboration
Adaptability and problem-solving skills
My weakness is that I tend to take on too many tasks at once, leading to occasional overwhelm.
I have a tendency to overcommit myself and struggle with prioritizing tasks
I am working on improving my time management skills to better handle my workload
I have learned to delegate tasks when necessary to avoid burnout
To lead and inspire a team towards achieving organizational goals through strategic planning and effective decision-making.
Setting clear goals and expectations for the team
Providing guidance and support to team members
Making informed decisions based on data and analysis
Driving innovation and continuous improvement
Building strong relationships with stakeholders
The end to end design process involves planning, designing, implementing, and testing a product or system from start to finish.
Understand requirements and constraints
Create initial design concepts
Develop detailed design plans
Implement design through prototyping or coding
Test and validate design against requirements
Iterate on design based on feedback
Finalize design for production
GD&T stands for Geometric Dimensioning and Tolerancing. It is required to specify the allowable variations in form, size, and orientation of parts in engineering drawings.
GD&T is a symbolic language used on engineering drawings to communicate design intent and ensure parts are manufactured correctly.
It allows for more detailed and precise specifications compared to traditional dimensioning methods.
GD&T helps to reduce ...
I appeared for an interview in Feb 2025, where I was asked the following questions.
I applied via Job Fair and was interviewed in Nov 2024. There was 1 interview round.
Product target achieve and maintain line 5s
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
I come from a close-knit family with a strong emphasis on education and helping others. I want to work in customer service to utilize my communication skills and make a positive impact.
Family background: Close-knit family with emphasis on education and helping others
Desire to utilize communication skills in customer service role
Passion for making a positive impact on others
Example: My parents instilled in me the values...
Top trending discussions
The duration of Spark Minda interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 128 interview experiences
Difficulty level
Duration
based on 1.8k reviews
Rating in categories
Assistant Manager
452
salaries
| ₹4.5 L/yr - ₹15.7 L/yr |
Senior Engineer
256
salaries
| ₹2.2 L/yr - ₹9.4 L/yr |
Deputy Manager
238
salaries
| ₹6.8 L/yr - ₹22.4 L/yr |
Quality Engineer
229
salaries
| ₹1 L/yr - ₹5.7 L/yr |
Engineer
209
salaries
| ₹2.2 L/yr - ₹6 L/yr |
JBM Group
Subros
Endurance Technologies
Gabriel India