Filter interviews by
I have used software to create programs.
I have used software like AutoCAD, SolidWorks, and MATLAB to create programs for production engineering.
Using software allows for more precise and efficient programming compared to manual methods.
Software also helps in simulating and testing programs before implementation.
G code and M code are machine codes used in CNC programming to control the movements and functions of a machine tool.
G code is used to control the movements of the machine, such as linear or circular interpolation.
M code is used to control auxiliary functions of the machine, such as turning on or off coolant or spindle rotation.
G codes are typically used for positioning and feed rate control, while M codes are use...
OEE stands for Overall Equipment Effectiveness and is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the ratio of operating time to planned production time.
Performance is the ratio of actual production to maximum possible production.
Quality is the ratio of good parts to total parts produced.
OEE = Availability x Per...
Sheet metal work involves cutting, bending, and shaping thin metal sheets to create various products and components.
Involves cutting, bending, and shaping thin metal sheets
Commonly used in manufacturing of car bodies, aircraft wings, household appliances, etc.
Requires specialized tools such as shears, press brakes, and rollers
Can involve processes like punching, stamping, welding, and finishing
Production planning is the process of organizing resources, scheduling tasks, and coordinating activities to ensure efficient production of goods.
Involves determining what products to produce, in what quantities, and when
Includes creating production schedules, allocating resources, and setting timelines
Balances demand with available resources to meet customer needs
Utilizes forecasting, inventory management, and ca...
Total productive maintenance (TPM) is a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns and improving overall equipment efficiency
It involves regular maintenance, cleaning, and inspection of equipment
TPM also includes training operators to perform basic maintenance tasks
The goal of TPM is to eliminate unplanned downtime and improve productivity
Ex...
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness and is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the ratio of operating time to planned production time.
Performance is the ratio of actual production to maximum possible production.
Quality is the ratio of good parts to total parts produced.
OEE = Availability x Performa...
G code and M code are machine codes used in CNC programming to control the movements and functions of a machine tool.
G code is used to control the movements of the machine, such as linear or circular interpolation.
M code is used to control auxiliary functions of the machine, such as turning on or off coolant or spindle rotation.
G codes are typically used for positioning and feed rate control, while M codes are used for...
I have used software to create programs.
I have used software like AutoCAD, SolidWorks, and MATLAB to create programs for production engineering.
Using software allows for more precise and efficient programming compared to manual methods.
Software also helps in simulating and testing programs before implementation.
Sheet metal work involves cutting, bending, and shaping thin metal sheets to create various products and components.
Involves cutting, bending, and shaping thin metal sheets
Commonly used in manufacturing of car bodies, aircraft wings, household appliances, etc.
Requires specialized tools such as shears, press brakes, and rollers
Can involve processes like punching, stamping, welding, and finishing
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Feb 2023. There were 3 interview rounds.
Total productive maintenance (TPM) is a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns and improving overall equipment efficiency
It involves regular maintenance, cleaning, and inspection of equipment
TPM also includes training operators to perform basic maintenance tasks
The goal of TPM is to eliminate unplanned downtime and improve productivity
Example...
Production planning is the process of organizing resources, scheduling tasks, and coordinating activities to ensure efficient production of goods.
Involves determining what products to produce, in what quantities, and when
Includes creating production schedules, allocating resources, and setting timelines
Balances demand with available resources to meet customer needs
Utilizes forecasting, inventory management, and capacit...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Jul 2021. There was 1 interview round.
posted on 27 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
I am a dedicated Production Engineer with a passion for optimizing processes and enhancing efficiency in manufacturing environments.
Educational Background: I hold a degree in Mechanical Engineering from XYZ University, where I focused on production systems.
Professional Experience: I have 3 years of experience at ABC Manufacturing, where I improved production efficiency by 20% through process optimization.
Technical Skil...
I applied via Walk-in and was interviewed in Oct 2022. There were 3 interview rounds.
Improved production efficiency by implementing new processes and reducing downtime.
Implemented a new scheduling system that reduced production downtime by 20%
Developed and implemented a preventive maintenance program that reduced equipment breakdowns by 15%
Led a team in optimizing production line layout, resulting in a 10% increase in overall efficiency
Streamlined inventory management processes, reducing waste and impr...
Cycle time is the time taken to complete a task while takt time is the time available to complete a task.
Cycle time is the total time taken to complete a process, including both processing and waiting time.
Takt time is the rate at which a product must be produced to meet customer demand.
Cycle time should be less than or equal to takt time to meet customer demand.
For example, if a company has a takt time of 60 seconds a...
My family background is diverse and has influenced my values and work ethic.
My parents are both engineers, which inspired my interest in the field.
I have two siblings, one of whom is a doctor, which has given me exposure to the medical field.
My grandparents were farmers, teaching me the importance of hard work and problem-solving.
My family has always encouraged education and supported my career aspirations.
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
based on 6 interview experiences
Difficulty level
Duration
based on 53 reviews
Rating in categories
Engineer
374
salaries
| ₹2 L/yr - ₹5.8 L/yr |
Assistant Engineer
333
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Senior Engineer
327
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
Assistant Manager
305
salaries
| ₹4.5 L/yr - ₹10 L/yr |
Quality Engineer
185
salaries
| ₹1.7 L/yr - ₹5.5 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda