i
Uflex
Work with us
Filter interviews by
I am an Electromechanical Engineer with expertise in managing complex projects and ensuring efficient operations.
I have been working as an Electromechanical Engineer for the past 5 years.
I have successfully led multiple projects involving the integration of electrical and mechanical systems.
I am responsible for overseeing the design, installation, and maintenance of electromechanical equipment.
I collaborate with cross-...
Yes, I am capable of reading electrical drawings and correcting errors in them.
I have experience in reading and interpreting electrical drawings.
I am familiar with common symbols and conventions used in electrical drawings.
I have corrected errors in electrical drawings in the past.
I am proficient in using software tools to edit and modify electrical drawings.
I am detail-oriented and can spot errors and inconsistencies ...
Control heater temperature using a feedback loop and electrical schematics for precise regulation.
Use a thermocouple or RTD for temperature sensing.
Implement a PID controller for accurate temperature control.
Design a relay or solid-state switch to control the heater.
Include safety features like thermal fuses or circuit breakers.
Create a schematic showing connections between components.
Motor can be controlled by sensor using feedback loop and control algorithm.
Use a sensor to measure the motor's speed or position
Feed the sensor data into a control algorithm
Adjust the motor's power or speed based on the algorithm's output
Repeat the process in a feedback loop to maintain control
The output of a PNP sensor is a high signal when there is no object detected and a low signal when an object is detected.
PNP sensors are used to detect the presence or absence of objects.
They work by emitting a signal and detecting the reflection of that signal.
When an object is present, the signal is reflected back to the sensor and the output is low.
When no object is present, the signal is not reflected and the outpu...
I would assess the requirements and determine if the NPN sensor can be used as a substitute or if a PNP sensor is absolutely necessary.
Check the specifications of the NPN sensor to see if it meets the requirements of the PNP sensor
Determine if the wiring and connections can be modified to accommodate the NPN sensor
If the NPN sensor cannot be used, source a PNP sensor that meets the requirements
What people are saying about Uflex
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 22 Sep 2022
I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.
Preventive maintenance is a proactive approach to maintenance that aims to prevent equipment failure before it occurs.
Regularly scheduled inspections and maintenance
Replacing worn or damaged parts before they cause a breakdown
Cleaning and lubricating equipment to prevent wear and tear
Keeping accurate records of maintenance activities
Examples: changing the oil in a car, replacing air filters in HVAC systems, inspecting ...
SAP PM module is used for managing maintenance activities of an organization.
PM stands for Plant Maintenance
It helps in planning and scheduling maintenance tasks
Tracks equipment and maintenance history
Provides cost analysis and reporting
Integrates with other SAP modules like MM and FI
Example: A manufacturing company can use SAP PM to schedule maintenance of their production equipment
I have handled various utilities equipments including generators, chillers, HVAC systems, and water treatment plants.
Generators: responsible for maintenance and repair of diesel and gas generators
Chillers: handled installation and maintenance of air-cooled and water-cooled chillers
HVAC systems: managed repair and maintenance of heating, ventilation, and air conditioning systems
Water treatment plants: responsible for op...
Bearings are used to reduce friction between two moving parts. There are several types of bearings.
Plain bearings
Rolling element bearings
Jewel bearings
Fluid bearings
Magnetic bearings
posted on 25 Jun 2024
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Jan 2017. There were 5 interview rounds.
I am currently working at ABC Company as a Process Engineer.
Responsible for optimizing production processes
Collaborate with cross-functional teams to improve efficiency
Implementing new technologies to enhance productivity
Competitive salary with benefits
Competitive salary based on industry standards
Health insurance coverage
401(k) matching
Paid time off
Performance bonuses
I applied via LinkedIn and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I appeared for an interview before Apr 2024, where I was asked the following questions.
The export process involves several steps to send goods from one country to another, ensuring compliance and logistics management.
Market Research: Identify potential markets for your product, e.g., exporting electronics to Europe.
Documentation: Prepare necessary documents like commercial invoices and export licenses.
Logistics: Arrange transportation, choosing between air, sea, or land freight based on cost and urgency.
...
Some of the top questions asked at the Uflex Electromechanical Engineer interview -
Assistant Manager
572
salaries
| ₹5.4 L/yr - ₹12 L/yr |
Junior Engineer
531
salaries
| ₹1.9 L/yr - ₹5.8 L/yr |
Officer
412
salaries
| ₹3.5 L/yr - ₹8.6 L/yr |
Manager
161
salaries
| ₹9.2 L/yr - ₹16.1 L/yr |
Production Officer
117
salaries
| ₹3.6 L/yr - ₹7.7 L/yr |
Huhtamaki
EPL Limited
Manjushree Technopack
Jindal Poly Films