i
Varroc
Group
Filter interviews by
I appeared for an interview in Jan 2025.
SDLC stands for Software Development Life Cycle. There are various types of testing in SDLC, including unit testing, integration testing, system testing, and acceptance testing.
Unit testing: Testing individual components or modules of the software to ensure they work correctly.
Integration testing: Testing the interaction between different components or modules to ensure they work together as expected.
System testing: Te...
Test cases for login functionality
Verify valid username and password successfully logs in
Verify error message is displayed for invalid credentials
Verify user is redirected to the correct page after successful login
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
Improving communication and personality requires self-awareness, active listening, and continuous learning.
Practice active listening to understand others' perspectives
Be aware of your own communication style and adjust as needed
Seek feedback and be open to constructive criticism
Read books or take courses on communication and interpersonal skills
Practice empathy and emotional intelligence
Be respectful and courteous in a...
I can demonstrate my potential through proactive problem-solving, leadership, and continuous learning in engineering projects.
Proactively identify and solve complex engineering problems, like optimizing a production process that increased efficiency by 20%.
Lead cross-functional teams in projects, such as spearheading a software development initiative that delivered a product ahead of schedule.
Engage in continuous learn...
First impressions can be shown through body language, attire, and communication skills.
Body language can convey confidence or nervousness
Attire can show professionalism or lack thereof
Communication skills can demonstrate intelligence and articulation
Eye contact and a firm handshake can also make a positive impression
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.
MHr stands for Man-Hour. Costing is done by calculating the total number of man-hours required for a task and multiplying it by the cost per hour.
MHr stands for Man-Hour, which is a unit of measurement for the amount of work performed by an individual in one hour.
Costing is done by determining the total number of man-hours required for a specific task or project.
The cost per hour is then multiplied by the total number ...
I do not have the current pricing information for ADC 12 & plastic resins.
I apologize, but I do not have the current pricing information for ADC 12 & plastic resins.
I would need to conduct research or consult with a colleague who has access to this information.
Pricing for these materials can fluctuate frequently based on market demand and other factors.
Costing of plastic and casting parts involves analyzing material costs, production processes, and overhead expenses.
Analyze the material costs by considering the type and quantity of plastic or casting material required.
Evaluate the production processes involved in manufacturing the parts, including molding or casting techniques.
Consider the labor costs, machine costs, and energy costs associated with the production pr...
To determine the machine and tool cost for a plastic part.
Analyze the dimensions and material of the plastic part
Identify the required tolerances and surface finish
Consider the production volume and lead time
Research the available machines and their capabilities
Calculate the tooling cost based on the chosen machine
Consider the maintenance and operating costs of the machine
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
What people are saying about Varroc Group
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I faced a defect in plastic commodity related to poor quality control during the manufacturing process.
The defect was in the form of cracks and breakages in the plastic products.
It was caused by inadequate monitoring and supervision during the molding and cooling stages.
The defect resulted in a high number of rejected products and customer complaints.
To address the issue, we implemented stricter quality control measure...
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.
Spares management involves inventory control, procurement, and maintenance planning.
Create a detailed inventory of all spares and their usage frequency.
Establish a procurement process that ensures timely availability of spares.
Implement a maintenance plan that includes regular inspection and replacement of spares.
Use technology such as barcoding and RFID to track spares and prevent loss or theft.
Regularly review and up...
Shift issues can be managed by effective communication, proper scheduling, and providing necessary resources.
Establish clear communication channels between team members and management
Create a schedule that takes into account employee preferences and availability
Ensure that all necessary resources are available for each shift
Regularly review and adjust the schedule as needed
Provide training and support for employees to ...
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
What kind of behavior for workers
Process actives are steps or tasks involved in completing a specific process.
Identify all the steps involved in the process
List the tasks in sequential order
Define the inputs and outputs of each step
Assign responsibilities for each task
Monitor progress and adjust as needed
based on 1 interview experience
Difficulty level
Duration
Quality Engineer
340
salaries
| ₹1 L/yr - ₹6.3 L/yr |
Senior Engineer
287
salaries
| ₹2.8 L/yr - ₹9.4 L/yr |
Assistant Manager
254
salaries
| ₹5.2 L/yr - ₹14.1 L/yr |
Production Engineer
237
salaries
| ₹1 L/yr - ₹6.5 L/yr |
Engineer
175
salaries
| ₹1.4 L/yr - ₹8.1 L/yr |
JBM Group
Subros
UNO Minda
Apollo Tyres