  • Q1. Boiler afbc ash HANDLING
  • Q2. Boiler AFBC osm systems
  • Q3. WHRB osm systems
  • Q4. Runing system boiler
  • Q5. Any time power plant afbc systems

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Aryan Ispat & Power?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Technical 

(1 Question)

  • Q1. Fitter theory related and work experience question
Round 2 - Technical 

(1 Question)

  • Q1. Theory related theory and work experience

ITI Fitter Interview Questions Asked at Other Companies

asked in Tata Motors
Q1. How many types of gears are available?
Q2. What is the least count of a vernier caliper?
asked in Tata Steel
Q3. what is hammer?& ball pin hammer?
Q4. How many types of lathe machines are there?
asked in Tata Motors
Q5. What is a fitter?

I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Overhauling procedure of turbine and generator
  • Ans. 

    Overhauling procedure of turbine and generator involves disassembly, inspection, repair, and reassembly.

    • Disassemble turbine and generator components

    • Inspect components for wear and damage

    • Repair or replace damaged components

    • Reassemble components and test for proper function

  • Answered by AI
  • Q2. About roll check bump check and alignment etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview will be very tough

Interview Questionnaire 

2 Questions

  • Q1. Relocate to any location in India
  • Q2. Basic techanical question and prefer experience of wind sector

Interview Preparation Tips

Interview preparation tips for other job seekers - Technology and DFIG system

I applied via Referral and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Current jd

Interview Preparation Tips

Interview preparation tips for other job seekers - Current job description and ready to work all over india

I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Speak about your responsibility/role in the project mentioned in the resume ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. More on electrical batteries unrelated to work
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. What is commissioning
  • Ans. 

    Commissioning is the process of ensuring that systems and components are designed, installed, and tested to meet operational requirements.

    • Involves verification of systems like HVAC, electrical, and plumbing.

    • Ensures compliance with design specifications and operational needs.

    • Includes testing, adjusting, and balancing of systems.

    • Example: Testing an HVAC system to ensure it meets temperature and airflow requirements.

    • Can b...

  • Answered by AI
  • Q2. Ash handling commissioning
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Knowledge of Transformer,Inverters, solar panels,
  • Q2. Daily generation Report

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical things and basic knowledge of fundamentals.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What is your experience with team handling?
  • Q2. What are materials inventory?
  • Ans. 

    Materials inventory refers to the stock of raw materials, components, and finished goods used in production.

    • Includes raw materials like steel, plastic, and chemicals used in manufacturing.

    • Comprises components such as circuit boards or subassemblies for electronics.

    • Encompasses finished goods ready for sale, like packaged food or clothing.

    • Essential for production planning and ensuring timely delivery of products.

    • Helps in...

  • Answered by AI

Aryan Ispat & Power Interview FAQs

What are the top questions asked in Aryan Ispat & Power ITI Fitter interview?

Some of the top questions asked at the Aryan Ispat & Power ITI Fitter interview -

  1. Boiler afbc ash HANDL...read more
  2. Boiler AFBC osm syst...read more
  3. WHRB osm syst...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3/5

based on 1 interview experience

Interview Questions from Similar Companies

Enphase Energy Interview Questions
2.9
 • 48 Interviews
Inox Wind Interview Questions
3.7
 • 44 Interviews
Sterlite Power Interview Questions
4.0
 • 27 Interviews
Avaada Energy Interview Questions
4.3
 • 26 Interviews
Azure Power Interview Questions
3.8
 • 21 Interviews
View all
Engineer
6 salaries
unlock blur

₹4.1 L/yr - ₹6 L/yr

Senior Engineer
6 salaries
unlock blur

₹3.5 L/yr - ₹5 L/yr

Shift Incharge
6 salaries
unlock blur

₹4.1 L/yr - ₹5.1 L/yr

Boiler and Turbine DCS Engineer
4 salaries
unlock blur

₹3.5 L/yr - ₹4.8 L/yr

Electrical Engineer
4 salaries
unlock blur

₹2.7 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Aryan Ispat & Power with

Sterlite Power

4.0
Compare

Doosan Power Systems

4.2
Compare

Inox Wind

3.7
Compare

Premier Energies

4.2
Compare
write
Share an Interview