i
B.L. Kashyap &
Sons
Filter interviews by
I applied via Campus Placement and was interviewed in Jun 2020. There was 1 interview round.
The amount of lime in cement varies depending on the type of cement being used.
The lime content in cement is typically expressed as a percentage of the total cement mass.
Ordinary Portland cement (OPC) generally contains around 5-10% lime.
However, different types of cement, such as sulfate-resistant cement or low-heat cement, may have varying lime content.
The lime content affects the setting time, strength, and durabili...
Top trending discussions
posted on 14 Jun 2021
Estimating costs and preparing Bill of Quantities (BoQ) for highway/roadway projects involves detailed analysis and calculations.
Identify project scope: Determine the length, width, and type of roadway.
Material estimation: Calculate quantities of asphalt, concrete, and aggregates needed.
Labor costs: Estimate man-hours required for construction activities.
Equipment costs: Include costs for machinery like excavators and ...
posted on 18 Aug 2021
posted on 9 Dec 2020
I applied via Company Website and was interviewed in Jun 2020. There were 3 interview rounds.
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
Experienced Planning Engineer with a strong background in project management, scheduling, and resource allocation across various industries.
Managed project schedules using Primavera P6, ensuring timely completion of a $10 million infrastructure project.
Developed and maintained detailed project plans, including timelines, milestones, and resource allocation for a renewable energy project.
Collaborated with cross-function...
posted on 8 Apr 2024
I appeared for an interview in Feb 2025, where I was asked the following questions.
I have over 5 years of experience in the oil and gas sector, focusing on site engineering and project management.
Worked on the construction of offshore platforms, ensuring compliance with safety regulations.
Managed site activities for pipeline installation, coordinating with various teams.
Conducted site inspections and quality control for drilling operations.
Participated in environmental impact assessments for new proj...
Civil engineers play a crucial role in the planning, design, and execution of oil and gas projects, ensuring structural integrity and safety.
Designing infrastructure: Civil engineers design pipelines, storage facilities, and processing plants, ensuring they meet safety and environmental standards.
Site assessment: Conducting geotechnical investigations to assess soil conditions for the stability of structures like drill...
Effective quality and quantity management in projects involves systematic planning, monitoring, and control processes.
Establish clear quality standards and specifications at the project's outset.
Implement regular inspections and audits to ensure compliance with quality standards.
Utilize project management software to track progress and resource allocation.
Conduct training sessions for team members on quality control me...
Timely project delivery involves effective planning, resource management, and communication among stakeholders.
Develop a detailed project schedule using tools like Gantt charts to visualize timelines.
Conduct regular progress meetings to identify potential delays early.
Implement a robust risk management plan to address unforeseen issues, such as weather delays.
Utilize project management software for real-time tracking o...
Initiating project execution involves planning, resource allocation, and compliance with regulations to ensure successful construction.
Conduct a thorough site assessment to understand the geographical and environmental conditions.
Develop a detailed project plan outlining timelines, milestones, and deliverables.
Allocate resources effectively, including labor, materials, and equipment.
Ensure all necessary permits and app...
The procedure for fit up inspection includes classification, cleaning, alignment, root gap, root face, bevel angle, and mismatch or overlap.
Classify the base metal
Clean the surface
Align the parts to be joined
Check the root gap and root face
Measure the bevel angle
Check for any mismatch or overlap
Ensure all specifications are met
I applied via Referral and was interviewed before May 2022. There were 3 interview rounds.
IS code refers to Indian Standards code which provides technical specifications for various products and services.
IS codes are developed by the Bureau of Indian Standards (BIS)
They cover a wide range of products and services such as construction materials, electrical appliances, food products, and more
IS codes provide technical specifications for quality, safety, and performance of products and services
Compliance with ...
based on 1 review
Rating in categories
Site Engineer
105
salaries
| ₹2.3 L/yr - ₹6.2 L/yr |
Senior Engineer
91
salaries
| ₹4.3 L/yr - ₹8.1 L/yr |
Civil Site Engineer
80
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Junior Engineer
48
salaries
| ₹2.5 L/yr - ₹5.5 L/yr |
Assistant Engineer
36
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
L & W Constructions
S P Singla Constructions