Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by BSCPL Infrastructure Team. If you also belong to the team, you can get access from here

BSCPL Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

BSCPL Infrastructure Civil Structural Engineer Interview Questions and Answers

Updated 23 Oct 2020

5 Interview questions

A Civil Structural Engineer was asked
Q. What are the parts of an auto level?
Ans. 

Auto level parts are components of an auto level instrument used in surveying and construction.

  • Auto level parts include the telescope, leveling screws, bubble level, focusing knob, and tripod.

  • The telescope is used to sight and measure vertical and horizontal angles.

  • Leveling screws are used to adjust the instrument's level.

  • The bubble level helps in ensuring the instrument is properly leveled.

  • The focusing knob is us...

A Civil Structural Engineer was asked
Q. How do we find a right angle?
Ans. 

A right angle is a 90-degree angle formed by two perpendicular lines.

  • A right angle can be found using a protractor or a T-square.

  • A right angle can also be identified by the intersection of two perpendicular lines.

  • In construction, a plumb bob or level can be used to ensure that a corner is at a right angle.

Civil Structural Engineer Interview Questions Asked at Other Companies

Q1. What is the length of a link in a metric chain?
Q2. Which is codes uses in structure design & describe each one
Q3. What are the basic responsibilities of a structural engineer?
Q4. What are the Concrete grades? And thier Ratio
Q5. What factors are included in structural design?
A Civil Structural Engineer was asked
Q. What is the length of a link in a metric chain?
Ans. 

A metric chain is 20 meters long and consists of 100 links, so each link is 0.2 meters long.

  • A metric chain is a measuring tool used in land surveying.

  • It is 20 meters long and consists of 100 links.

  • Each link is therefore 0.2 meters long.

  • Metric chains are used to measure distances on land with high accuracy.

A Civil Structural Engineer was asked
Q. What does M30 mean?
Ans. 

M30 =M means 30Means

  • M30 refers to a specific grade of concrete

  • The 'M' stands for mix design

  • The number following 'M' represents the compressive strength of the concrete in megapascals (MPa)

  • For example, M30 means the concrete has a compressive strength of 30 MPa

A Civil Structural Engineer was asked
Q. What are the Concrete grades? And thier Ratio
Ans. 

Concrete grades are classifications of concrete based on its strength and durability.

  • Concrete grades range from M5 to M100, with M representing mix and the number representing the compressive strength in megapascals (MPa)

  • The ratio of concrete mix varies depending on the grade, with higher grades requiring more cement, sand, and aggregate

  • For example, M20 concrete has a mix ratio of 1:1.5:3, meaning 1 part cement, 1...

BSCPL Infrastructure Civil Structural Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the Auto level parts?
  • Ans. 

    Auto level parts are components of an auto level instrument used in surveying and construction.

    • Auto level parts include the telescope, leveling screws, bubble level, focusing knob, and tripod.

    • The telescope is used to sight and measure vertical and horizontal angles.

    • Leveling screws are used to adjust the instrument's level.

    • The bubble level helps in ensuring the instrument is properly leveled.

    • The focusing knob is used to...

  • Answered by AI
  • Q2. Metric chain lenth and links how much lenth of a link?
  • Ans. 

    A metric chain is 20 meters long and consists of 100 links, so each link is 0.2 meters long.

    • A metric chain is a measuring tool used in land surveying.

    • It is 20 meters long and consists of 100 links.

    • Each link is therefore 0.2 meters long.

    • Metric chains are used to measure distances on land with high accuracy.

  • Answered by AI
  • Q3. Slump test
  • Q4. What are the Concrete grades? And thier Ratio
  • Ans. 

    Concrete grades are classifications of concrete based on its strength and durability.

    • Concrete grades range from M5 to M100, with M representing mix and the number representing the compressive strength in megapascals (MPa)

    • The ratio of concrete mix varies depending on the grade, with higher grades requiring more cement, sand, and aggregate

    • For example, M20 concrete has a mix ratio of 1:1.5:3, meaning 1 part cement, 1.5 pa...

  • Answered by AI
  • Q5. How we find out right angle?
  • Ans. 

    A right angle is a 90-degree angle formed by two perpendicular lines.

    • A right angle can be found using a protractor or a T-square.

    • A right angle can also be identified by the intersection of two perpendicular lines.

    • In construction, a plumb bob or level can be used to ensure that a corner is at a right angle.

  • Answered by AI
  • Q6. M30 =M means 30Means
  • Ans. 

    M30 =M means 30Means

    • M30 refers to a specific grade of concrete

    • The 'M' stands for mix design

    • The number following 'M' represents the compressive strength of the concrete in megapascals (MPa)

    • For example, M30 means the concrete has a compressive strength of 30 MPa

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be confideante

BSCPL Infrastructure HR Interview Questions

4 questions and answers

Q. What is your ambition?
Q. What is your career goal?
Q. Did you have any references in this company?

Top trending discussions

View All
Interview Hub
6d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about BSCPL Infrastructure?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Walk-in and was interviewed in Aug 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Questions will be asked on your work experience. The works you have done in the site.
  • Q2. How to control steel wastage?
  • Ans. 

    Steel wastage can be controlled by proper planning, material handling, and inventory management.

    • Use accurate measurements and cutting techniques to minimize scrap

    • Ensure proper storage and handling of steel to prevent damage and corrosion

    • Implement inventory management systems to track usage and reduce over-ordering

    • Train workers on proper handling and cutting techniques to minimize errors

    • Reuse or recycle scrap steel when...

  • Answered by AI
  • Q3. Quantity of cement & flyash in M40 grade concrete?
  • Q4. Deduction of steel for a 45 & 90 degree bend?
  • Ans. 

    Deduction of steel for a 45 & 90 degree bend

    • For a 45 degree bend, deduct 1.5 times the diameter of the bar

    • For a 90 degree bend, deduct 2 times the diameter of the bar

    • This deduction is necessary to account for the length of the bend

    • The deduction varies based on the diameter of the bar being bent

    • The deduction is typically specified in the design drawings or codes

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be sure and honest with your working experience. Dont say anything extra that you haven't done in site before.
Are these interview questions helpful?

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Ans. 

    A man day is a unit of measure representing the amount of work one person can complete in a single day.

    • Typically used in project management to estimate labor costs and timelines.

    • One man day usually equals 8 hours of work.

    • For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.

    • Helps in resource allocation and planning for projects.

  • Answered by AI
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jul 2024, where I was asked the following questions.

  • Q1. Can you provide a formal introduction and explain why you should be hired?
  • Ans. 

    Experienced Senior Engineer with a proven track record in innovative solutions and team leadership, ready to drive success in your organization.

    • Over 10 years of experience in software development, leading projects from conception to deployment.

    • Successfully managed a team of 5 engineers, improving project delivery time by 30% through agile methodologies.

    • Developed a scalable application that increased user engagement by ...

  • Answered by AI
  • Q2. What is the significance of IS CODE in the context of erection and fabrication?
  • Ans. 

    IS CODE ensures standardization, safety, and quality in erection and fabrication processes across various engineering sectors.

    • Standardization: IS CODE provides uniform guidelines for materials and processes, ensuring consistency in quality.

    • Safety: Compliance with IS CODE helps in minimizing risks associated with structural failures during erection.

    • Quality Assurance: Adhering to IS CODE ensures that the fabricated compo...

  • Answered by AI
  • Q3. What kind of checklist do you follow when constructing a Pre-Engineered Building (PEB)?
  • Ans. 

    A comprehensive checklist ensures quality and efficiency in constructing Pre-Engineered Buildings (PEBs).

    • Site Assessment: Evaluate soil conditions and topography to determine foundation requirements.

    • Design Review: Ensure all architectural and structural designs meet local codes and client specifications.

    • Material Selection: Choose appropriate materials (e.g., steel grades) based on load requirements and environmental fa...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I appeared for an interview in Apr 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Control Valve sizing
  • Q2. Flowmeter selection
Round 2 - HR 

(2 Questions)

  • Q1. Reason for shifting
  • Ans. 

    I shifted to pursue new opportunities for growth and development in my career.

    • Seeking new challenges and responsibilities

    • Exploring different industries or technologies

    • Relocation for personal reasons or family commitments

  • Answered by AI
  • Q2. Expected salary
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Field related building materials
  • Q2. Building materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join in this company,
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What a IS Code of Design Mix ?
  • Ans. 

    IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.

    • IS 456:2000 provides guidelines for plain and reinforced concrete design.

    • IS 10262:2019 outlines the procedure for concrete mix design.

    • Mix design considers factors like workability, strength, and durability.

    • Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).

    • The...

  • Answered by AI
  • Q2. What are the Welding method of steel?
  • Q3. What are the advantage of steel shuttering?
  • Q4. What are the benefits of using Composite Plate?
  • Ans. 

    Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.

    • High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.

    • Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.

    • Design flexibility: Can be molded into complex shapes, allowing for inn...

  • Answered by AI
  • Q5. How do you lay blocks in block work
  • Ans. 

    Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.

    • Prepare the foundation: Ensure the base is level and clean before starting.

    • Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.

    • Lay the first block: Start at a corner, applying mortar to the bottom and sides.

    • Check alignment: Use a level to ensure blocks are straight and even.

    • Stagger ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As a job seeker, it's essential to be proactive and persistent in your job search. Don't quit for opportunities to come to you. Create your own. 1- Network and make Connection. 2- Tailor your application materials. 3- Follow up 4- Continuous improve. 5- Stay positive and motivate.

BSCPL Infrastructure Interview FAQs

What are the top questions asked in BSCPL Infrastructure Civil Structural Engineer interview?

Some of the top questions asked at the BSCPL Infrastructure Civil Structural Engineer interview -

  1. Metric chain lenth and links how much lenth of a li...read more
  2. What are the Concrete grades? And thier Ra...read more
  3. What are the Auto level par...read more

Tell us how to improve this page.

Junior Engineer
67 salaries
unlock blur

₹2 L/yr - ₹4.1 L/yr

Junior Engineer Civil
56 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Assistant Engineer
47 salaries
unlock blur

₹3.2 L/yr - ₹6.2 L/yr

Accountant
39 salaries
unlock blur

₹2 L/yr - ₹4.8 L/yr

Technical Assistant
39 salaries
unlock blur

₹1.4 L/yr - ₹2.5 L/yr

Explore more salaries
Compare BSCPL Infrastructure with

AECOM

4.2
Compare

Apco Infratech

3.7
Compare

L&T Energy Hydrocarbon

3.8
Compare

Aarvee Associates

3.9
Compare
write
Share an Interview