I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
LOTO stands for Lockout/Tagout. It is a safety procedure used in industrial settings to ensure that dangerous machines are properly shut off and not started up again until maintenance or repair work is completed.
LOTO involves placing a lock and tag on the energy-isolating device of a machine to prevent accidental or unauthorized startup.
It is important to follow LOTO procedures to prevent injuries and fatalities.
Exampl...
LOTO ensures safety by controlling hazardous energy during maintenance of electrical equipment.
Identify all energy sources before starting work.
Use lockout devices on circuit breakers and switches.
Tag out equipment to inform others of maintenance work.
Verify isolation by attempting to operate the equipment.
Examples include locking out motors, transformers, and control panels.
Top trending discussions
I applied via Company Website and was interviewed in Jul 2020. There were 6 interview rounds.
posted on 8 Jun 2024
I applied via Recruitment Consulltant and was interviewed before Jun 2023. There were 3 interview rounds.
I can join the company immediately or as per your requirement, ensuring a smooth transition into the role.
I am available to start immediately, which allows for a quick onboarding process.
If needed, I can accommodate a notice period of two weeks to wrap up my current responsibilities.
I am flexible with start dates and can adjust based on the company's needs.
For example, if there are specific projects or timelines, I can...
I appeared for an interview in Nov 2024, where I was asked the following questions.
Installing a transformer and panel in an MV substation involves careful planning, proper cable selection, and adherence to safety standards.
1. Site Preparation: Ensure the installation site is clear and meets safety regulations.
2. Transformer Installation: Use a crane for heavy transformers; secure it on a concrete pad.
3. Cable Selection: Use XLPE or PVC insulated cables for medium voltage applications.
4. Panel Install...
I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed before Oct 2023. There was 1 interview round.
I have 5 years of experience working in the oil and gas field, specializing in maintenance and troubleshooting of equipment.
Experience in maintenance and troubleshooting of equipment in oil and gas field
Knowledge of safety protocols and regulations in the industry
Familiarity with various tools and technologies used in the field
Worked on projects involving drilling, extraction, and transportation of oil and gas
Collabora...
As a Mechanical Technician Static and Rotating Foreman at Qatar Gas North, my role involves overseeing maintenance and repair of static and rotating equipment to ensure smooth operations.
Oversee maintenance and repair of static and rotating equipment
Ensure smooth operations of equipment
Supervise a team of technicians
Implement safety procedures and protocols
Coordinate with other departments for maintenance schedules
I appeared for an interview in Sep 2024.
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Instrumentation Technician
9
salaries
| ₹1 L/yr - ₹8.5 L/yr |
Project Engineer
8
salaries
| ₹15.3 L/yr - ₹20 L/yr |
Testing & Commissioning Engineer
7
salaries
| ₹7 L/yr - ₹18 L/yr |
Safety Officer
6
salaries
| ₹5.3 L/yr - ₹6 L/yr |
Electrical Engineer
5
salaries
| ₹9.6 L/yr - ₹15 L/yr |
NBTC GROUP
Sterling Oil Exploration & Energy Production
Al Turki Enterprises
Arabian Industries