Filter interviews by
I applied via Referral and was interviewed before Feb 2021. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jun 2020. There were 4 interview rounds.
I applied via Job Portal and was interviewed in Feb 2024. There were 2 interview rounds.
I appeared for an interview in May 2025, where I was asked the following questions.
Quality tools like PPAP, APQP, MSA, and SPC ensure product reliability and compliance in manufacturing processes.
PPAP (Production Part Approval Process) ensures that suppliers meet quality standards before mass production.
APQP (Advanced Product Quality Planning) is a framework for planning and executing quality in new product development.
MSA (Measurement System Analysis) evaluates the accuracy and precision of measurem...
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
CPK is a statistical measure used to assess the capability of a process to produce output within specification limits.
CPK is calculated using the formula: CPK = (USL - LSL) / (6 * standard deviation)
A CPK value greater than 1 indicates that the process is capable of producing within specification limits
A CPK value less than 1 indicates that the process may not be capable of consistently producing within specification l...
Ra in roughness tester is the average roughness value of the surface profile within a specified sampling length.
Ra is a parameter used to quantify the roughness of a surface.
It is calculated as the arithmetic average of the absolute values of the profile heights over the evaluation length.
Ra provides a measure of the deviation of the surface profile from the mean line.
It is commonly used in industries such as manufactu...
7QC tools are a set of quality control tools used for process improvement and problem-solving in quality management.
Check sheets: Used to collect and analyze data in a systematic way.
Histograms: Used to show frequency distribution of a process.
Pareto charts: Helps identify the most significant factors contributing to a problem.
Cause-and-effect diagrams: Used to identify and analyze potential causes of a problem.
Scatter...
The 8D methodology is a problem-solving approach used in quality management to identify, correct, and prevent recurring problems.
The 8D methodology consists of 8 steps: D0 - Plan, D1 - Team Formation, D2 - Problem Description, D3 - Interim Containment Action, D4 - Root Cause Analysis, D5 - Permanent Corrective Action, D6 - Prevent Recurrence, D7 - Recognize Team Effort, D8 - Closure and Team Disbandment
It is commonly u...
I appeared for an interview before Apr 2024, where I was asked the following questions.
I have over five years of experience in management, focusing on team leadership and project execution.
Led a team of 10 in a successful project that increased sales by 20%.
Implemented a new training program that improved employee performance by 15%.
Managed budgets exceeding $500,000, ensuring projects were completed on time and within budget.
I appeared for an interview before Mar 2024, where I was asked the following questions.
posted on 20 Jun 2025
I appeared for an interview before Jun 2024, where I was asked the following questions.
Production Supervisor
16
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Senior Engineer
13
salaries
| ₹3.1 L/yr - ₹6.2 L/yr |
Quality Inspector
12
salaries
| ₹1.5 L/yr - ₹2.4 L/yr |
Quality Engineer
11
salaries
| ₹1.6 L/yr - ₹3 L/yr |
CNC Operator
9
salaries
| ₹1.5 L/yr - ₹2 L/yr |
Central Tool Room & Training Centre
Chakr Innovation
CTR Manufacturing Industries
NSK