Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Reliance Industries Team. If you also belong to the team, you can get access from here

Reliance Industries Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Reliance Industries Plant Machinery Engineer Interview Questions and Answers

Updated 29 May 2025

Reliance Industries Plant Machinery Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Apr 2025, where I was asked the following questions.

  • Q1. What is the operational process of a horizontal drilling machine?
  • Ans. 

    Horizontal drilling machines create horizontal boreholes for various applications, including oil and gas extraction and utility installation.

    • 1. Setup: The drilling site is prepared, and the drilling rig is positioned horizontally.

    • 2. Drilling: A drill bit is attached to a rotating drill string, which penetrates the ground horizontally.

    • 3. Mud circulation: Drilling mud is pumped down the drill string to cool the bit and r...

  • Answered by AI
  • Q2. How does the Digitrack system work?
  • Ans. 

    The Digitrack system uses advanced technology for precise tracking and monitoring of machinery and equipment.

    • Utilizes GPS and RFID technology for real-time location tracking.

    • Enables remote monitoring of machinery performance and diagnostics.

    • Improves asset management by providing data on usage patterns.

    • Can integrate with existing fleet management systems for enhanced efficiency.

    • Example: A construction company uses Digit...

  • Answered by AI

Interview questions from similar companies

I appeared for an interview before Dec 2020.

Interview Questionnaire 

2 Questions

  • Q1. Basic questions testing your technical skills
  • Q2. Be confident with your answers

Interview Preparation Tips

Interview preparation tips for other job seekers - Most of the questions asked were basic technical questions. Being confident is the key

Plant Machinery Engineer Interview Questions Asked at Other Companies

Q1. What type of lubricant and lubrication system is used in engines?
Q2. What is turbocharger, intercooler, cooling system, lubrication sy ... read more
Q3. Material properties used in making hight strength engine and stru ... read more
Q4. How do you join a broken conveyor belt?
Q5. What is the operational process of a horizontal drilling machine?
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Normal GD.Just brush up contemporary topics

Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Mechanical Engineering Technical questions related to refrigeration

Interview Preparation Tips

Topics to prepare for Bharat Petroleum Assistant Manager interview:
  • Mechanical Engineering
  • General knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(4 Questions)

  • Q1. What is EV and how EV charging station can be benefited to consumers
  • Ans. 

    EV stands for electric vehicle. EV charging stations benefit consumers by providing convenient and fast charging options for their electric vehicles.

    • EV stands for electric vehicle, which runs on electricity instead of gasoline.

    • EV charging stations provide convenient and fast charging options for EV owners, allowing them to charge their vehicles at home or on the go.

    • Consumers can benefit from reduced fuel costs and lowe...

  • Answered by AI
  • Q2. How you will handle contractors on site
  • Ans. 

    I will establish clear expectations, provide necessary resources, monitor progress regularly, and address any issues promptly.

    • Establish clear expectations and goals for the contractors

    • Provide necessary resources and support for the contractors to succeed

    • Monitor progress regularly and communicate with contractors to ensure alignment

    • Address any issues or concerns promptly and provide feedback for improvement

  • Answered by AI
  • Q3. What are the PPEs involved at site
  • Ans. 

    Personal Protective Equipment (PPE) at a site refers to gear worn to minimize exposure to hazards.

    • Hard hats for head protection

    • Safety goggles for eye protection

    • Gloves for hand protection

    • Steel-toed boots for foot protection

    • High visibility vests for visibility

  • Answered by AI
  • Q4. What are the quality standards you may follow while erection of EV charger.
  • Ans. 

    Quality standards for EV charger erection ensure safety, efficiency, and compliance with regulations.

    • Adherence to relevant safety regulations and standards (e.g. NEC, UL)

    • Proper installation by certified technicians

    • Thorough testing of the charger before operation

    • Ensuring compatibility with the electrical system and vehicle requirements

    • Regular maintenance and inspection to prevent malfunctions

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your data updated related to EV charging stations, safety and quality to be involved while executing.

What people are saying about Reliance Industries

View All
a senior service engineer
2w
Reliance New Solar Energy Selection process
All the technical rounds were good Documents submitted , The asked to submit all the previous Experience Letter, DMC salary slip Does anyone have an idea about the DV document's verification process and how much time they take for being selected or rejected. Please share information about getting offer letter and next discussion.
Got a question about Reliance Industries ?
Ask anonymously on communities.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Earthing test process
  • Q2. Electrical and communication wire execution process with single tranch
  • Ans. 

    The electrical and communication wire execution process with single tranch involves a streamlined approach to installing wires in a single pass.

    • Plan the layout of the wires to ensure efficient installation in a single tranch

    • Use appropriate tools and equipment for the job

    • Ensure proper insulation and protection of the wires

    • Test the connections to ensure functionality

    • Document the process for future reference

  • Answered by AI
  • Q3. Maintenance 150mm minimum distance up and down between Electrical & Communication cable laying in single cable trench as properly
  • Ans. 

    Maintaining a 150mm minimum distance between Electrical & Communication cables in a single trench is crucial for safety and efficiency.

    • Ensure proper separation between Electrical & Communication cables to prevent interference and potential hazards

    • Use cable trays or separate trenches to maintain the required distance

    • Follow industry standards and regulations for cable laying practices

    • Regularly inspect and maintain the ca...

  • Answered by AI
  • Q4. Best eating accuracy is zero.. Conductive materials that surround electrical wires or machinery have voltage limiting to the ground.
  • Ans. 

    The statement is contradictory and does not make sense.

    • The statement 'Best eating accuracy is zero' is nonsensical as accuracy is typically measured on a scale from 0 to 100.

    • Conductive materials surrounding electrical wires or machinery typically have voltage limiting properties to prevent electrical hazards.

    • It is important to ensure proper grounding of conductive materials to prevent electrical shocks or fires.

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Site Manegement process
  • Q2. Team management schedule

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience with my reporting boss
Round 1 - Aptitude Test 

General aptitude questions asked. Practicing indiabix for mcq might help

Round 2 - Group Discussion 

Read mint newspaper.
Listen to analysis of different topics around the globe

Interview Preparation Tips

Interview preparation tips for other job seekers - Revise subjects HT, MT, FM.
Core questions and aptitude are asked

I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1. Tell me about urself. 2. Questions from whatever projects,achievements you highlighted in resume or during answering ques bo 1

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare the answer for tel me about urself, ur answer for this question will shape ur further interview
Are these interview questions helpful?
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Aon platform logical plus verbal plus quant

Round 3 - Group Discussion 

10 members in a group with relevant topics mainly current affairs

Round 4 - HR 

(2 Questions)

  • Q1. Tell us about your strength and weakness
  • Q2. They asked details about my project.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and give your best communication very important.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Sep 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

1 hr generally all topics

Round 3 - Group Discussion 

15 mins of GD consists of 8-10 members

Round 4 - Technical 

(2 Questions)

  • Q1. Area of interest asked then questions were bombarded
  • Q2. Questions about their company

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't need to prepare that much but selection does not have any favourism

Interview Questionnaire 

2 Questions

  • Q1. Transformers related
  • Q2. Basic questions pipeline

Reliance Industries Interview FAQs

What are the top questions asked in Reliance Industries Plant Machinery Engineer interview?

Some of the top questions asked at the Reliance Industries Plant Machinery Engineer interview -

  1. What is the operational process of a horizontal drilling machi...read more
  2. How does the Digitrack system wo...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Duration

Less than 2 weeks 100%
View more

Interview Questions from Similar Companies

Shell Interview Questions
4.0
 • 209 Interviews
Bharat Petroleum Interview Questions
4.1
 • 159 Interviews
Schlumberger Interview Questions
3.9
 • 144 Interviews
ExxonMobil Interview Questions
3.8
 • 70 Interviews
GAIL Interview Questions
4.4
 • 70 Interviews
bp Interview Questions
3.8
 • 69 Interviews
View all

Reliance Industries Plant Machinery Engineer Reviews and Ratings

based on 2 reviews

4.1/5

Rating in categories

4.5

Skill development

4.1

Work-life balance

3.6

Salary

4.1

Job security

5.0

Company culture

3.6

Promotions

4.1

Work satisfaction

Explore 2 Reviews and Ratings
Manager
3.5k salaries
unlock blur

₹5.4 L/yr - ₹20 L/yr

Assistant Manager
2.8k salaries
unlock blur

₹1.8 L/yr - ₹10.4 L/yr

Field Executive
2.8k salaries
unlock blur

₹1.8 L/yr - ₹9.5 L/yr

Senior Manager
2.6k salaries
unlock blur

₹8.3 L/yr - ₹29 L/yr

Deputy Manager
1.2k salaries
unlock blur

₹3.7 L/yr - ₹14 L/yr

Explore more salaries
Compare Reliance Industries with

Indian Oil Corporation

4.4
Compare

Shell

4.0
Compare

Bharat Petroleum

4.1
Compare

Hindustan Petroleum

4.2
Compare
write
Share an Interview