Filter interviews by
I applied via Campus Placement
Top trending discussions
posted on 25 Jan 2022
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
Basics
I come from a close-knit family that values education and hard work, which has greatly influenced my career aspirations.
My father is an engineer, which inspired my interest in technology and innovation.
My mother is a teacher, instilling in me the importance of education and lifelong learning.
I have a younger sister who is currently pursuing her studies in environmental science, showcasing our family's commitment to imp...
posted on 24 May 2017
I appeared for an interview in Aug 2016.
The cost of painting the wall behind me cannot be determined without additional information.
The cost of painting a wall depends on various factors such as the size of the wall, the type of paint used, and the labor charges.
Additional information needed includes the dimensions of the wall, the type of paint desired, and the cost of labor per square foot or hour.
Once these details are provided, an estimate can be calcula...
Water absorption test is a measure of the amount of water absorbed by a material under specified conditions.
The test is used to determine the porosity and permeability of a material.
It involves immersing the material in water for a specified period of time and then measuring the weight gain.
The percentage of weight gain is calculated and used to determine the water absorption rate of the material.
The test is commonly u...
After receiving the plan of a construction, the following steps should be followed.
Review the plan thoroughly to understand the scope and requirements of the project.
Identify any potential issues or conflicts in the plan and communicate them to the relevant stakeholders.
Create a detailed project schedule and timeline based on the plan.
Allocate resources and manpower according to the requirements of the plan.
Obtain nece...
Chain surveying is time-consuming and requires skilled personnel.
Requires a lot of time and effort to set up and measure accurately
Not suitable for large areas or uneven terrain
Errors can accumulate quickly and lead to inaccurate results
Requires skilled personnel to operate and interpret data
Difficult to use in areas with obstacles or obstructions
May not be suitable for certain types of surveys, such as topographical s...
I completed a project on renewable energy systems in my final year training.
Researched different types of renewable energy sources
Designed and implemented a small-scale renewable energy system
Analyzed the performance and efficiency of the system
Presented findings and recommendations to faculty and peers
Yes, I am willing and able to do site work.
I have experience working on construction sites during my previous internships.
I am physically fit and able to handle the demands of site work.
I understand the importance of safety protocols and will adhere to them at all times.
I am a quick learner and will adapt to any new challenges that arise on site.
I have a strong support system in place to ensure my parents are well taken care of, including family members, caregivers, and financial planning.
My siblings and I have a plan in place to share responsibilities for our parents' care.
We have hired caregivers to assist with daily tasks and provide companionship.
We have set up a financial plan to cover any medical expenses or long-term care needs.
We have regular check-ins...
posted on 1 Sep 2017
I appeared for an interview before Sep 2016.
I have worked on various projects during my studies, including a smart home automation system and a mobile app for tracking personal fitness goals.
Developed a smart home automation system using Arduino and Raspberry Pi
Designed and implemented a mobile app for tracking personal fitness goals
Collaborated with a team of engineers to develop a prototype for a solar-powered water purification system
Conducted research and an...
posted on 1 Sep 2017
I appeared for an interview before Sep 2016.
posted on 15 Feb 2015
posted on 15 Feb 2015
Concrete grades are classified based on their strength and durability.
Concrete grades range from M5 to M100.
M stands for mix and the number after it represents the compressive strength of concrete in megapascals (MPa).
Higher grade concrete is used for heavy-duty structures like bridges and dams, while lower grade concrete is used for lighter structures like sidewalks and driveways.
Design of steel & concrete structures involves the use of mathematical calculations and engineering principles to create safe and efficient structures.
Structural analysis and design
Material selection and testing
Load calculations and distribution
Construction techniques and methods
Code compliance and safety regulations
posted on 15 Feb 2015
posted on 15 Feb 2015
based on 1 review
Rating in categories
Senior Engineer
181
salaries
| ₹16.9 L/yr - ₹30.4 L/yr |
Process Engineer
55
salaries
| ₹8 L/yr - ₹13.2 L/yr |
Piping Engineer
46
salaries
| ₹9.3 L/yr - ₹15.6 L/yr |
Instrument Engineer
35
salaries
| ₹10.2 L/yr - ₹17.6 L/yr |
L2 Engineer
35
salaries
| ₹9.4 L/yr - ₹15 L/yr |
L&T Construction
Saint-Gobain
AECOM
AtkinsRealis