Premium Employer

i

This company page is being actively managed by Vishvaraj Environment Team. If you also belong to the team, you can get access from here

Vishvaraj Environment Verified Tick Work with us arrow

Compare button icon Compare button icon Compare

Filter interviews by

Vishvaraj Environment Deputy Manager Planning Interview Questions and Answers

Updated 11 Oct 2023

Vishvaraj Environment Deputy Manager Planning Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Budgeting, Scheduling, Billing, Contract
Round 3 - HR 

(1 Question)

  • Q1. Location preference and Salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - Stick to the basics.

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Vishvaraj Environment?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Why do you want to Work in Waste Management Company?
  • Ans. 

    I am passionate about sustainability and believe in the vital role waste management plays in protecting our environment and communities.

    • I am committed to sustainability and reducing environmental impact, as seen in my previous role where I initiated a recycling program.

    • Waste management is crucial for public health, and I want to contribute to creating cleaner, safer communities.

    • I admire the innovative technologies in w...

  • Answered by AI
  • Q2. What is the difference Between Marketing & Sales what would you Prefer ?
  • Ans. 

    Marketing is about creating demand while sales is about fulfilling demand. I prefer both as they are interdependent.

    • Marketing involves creating brand awareness, identifying target audience, and promoting products/services through various channels.

    • Sales involves converting leads into customers, negotiating deals, and closing sales.

    • Marketing and sales are interdependent as marketing creates demand and sales fulfills it.

    • A...

  • Answered by AI
  • Q3. How Would you deal with the Clients whom you didn't handled yet ?
  • Q4. How Long would you Stay if Selected ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Most of the Questioned were Asked from the Sales and Marketing Field ensuring that the Answer would be Point to Point.

Deputy Manager Planning Interview Questions Asked at Other Companies

Q1. How do you plan your product manufacturing to meet the production ... read more
Q2. How do you manage multiple projects simultaneously?
Q3. What HR compliance measures are included in the RA Bill?
Q4. primavera p6 logic explanation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Oct 2023.

Round 1 - Technical 

(1 Question)

  • Q1. Electrical Design Related
Round 2 - Technical 

(1 Question)

  • Q1. Electrical power

I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. It was online interview.
  • Ans. It was over call for two rounds and one face to face
  • Answered by Rahul khanna
Round 3 - One-on-one 

(1 Question)

  • Q1. My past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Not at all a professional company. If you are good in buttering and expert in office politics else not fit for the company. Skills required.. praising your boss day and night, seeking permission for every small Little thing.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Tell Me About work Experience
  • Q2. How to Arrest leakages?
  • Ans. 

    To arrest leakages, identify the source, implement preventive measures, monitor regularly, and take corrective actions.

    • Identify the source of leakages through regular audits and inspections.

    • Implement preventive measures such as installing leak detection systems or improving maintenance procedures.

    • Monitor regularly by analyzing data and conducting spot checks.

    • Take corrective actions promptly to fix leaks and prevent fut...

  • Answered by AI
  • Q3. Types of grouting Method
  • Ans. 

    Grouting methods include cementitious grouting, chemical grouting, and pressure grouting.

    • Cementitious grouting involves mixing cement, water, and additives to create a flowable material for filling gaps.

    • Chemical grouting uses chemical compounds to fill voids and stabilize soil or rock formations.

    • Pressure grouting injects grout under pressure to fill cracks and voids in structures.

    • Examples: epoxy grouting, urethane grou...

  • Answered by AI
  • Q4. How much Concrete Consumed in your last project!
  • Ans. 

    Approximately 500 cubic yards of concrete were consumed in the last project.

    • The amount of concrete consumed in a project can vary depending on the size and scope of the project.

    • Factors such as the type of structure being built, the design specifications, and the location can all impact the amount of concrete needed.

    • For example, a small residential project may only require a few cubic yards of concrete, while a large co...

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding EIA/EMP Procedures?
  • Q2. MoEF&CC Guidelines? Saraly & package in previous company?

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare well on Subject and legal policies.
MoEF&CC guidelines
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
  • Q1. 1. Type of vcb 2. Selection of distribution box 3. Selection of transformer 4. How to get the estimation report
  • Q2. 1. How you start the plant execution 2. Shed lighting installation 3. Plate earthing erection

Interview Preparation Tips

Interview preparation tips for other job seekers - This is good environmental company and I was joined 2019 to 2025 April I worked there
Are these interview questions helpful?

I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Core knowledge of mechanical engineering and project management
  • Q2. What is project life cycle.
  • Ans. 

    Project life cycle is the series of phases a project goes through from initiation to closure.

    • It includes initiation, planning, execution, monitoring and control, and closure phases.

    • Initiation involves defining the project and its objectives.

    • Planning involves creating a roadmap for the project, including timelines, budget, and resources.

    • Execution involves carrying out the plan and completing the project deliverables.

    • Mon...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Ion Exchange India Project Engineer interview:
  • Mechanical Engineering
Interview preparation tips for other job seekers - Work knowledge required earlier also core knowledge need what you do

I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About project experience and hvac related

Interview Preparation Tips

Interview preparation tips for other job seekers - They want multiple knowledge people.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Water and wastewater treatment plant erection and commissioning with process
  • Ans. 

    Water and wastewater treatment plant erection and commissioning involves the installation and start-up of the necessary equipment and processes for treating water and wastewater.

    • Erection and commissioning involves the installation of equipment such as pumps, pipes, tanks, and filters.

    • The process includes setting up the necessary treatment processes like coagulation, flocculation, sedimentation, filtration, and disinfec...

  • Answered by AI
  • Q2. Water and wastewater treatment plant erection and commissioning.

Vishvaraj Environment Interview FAQs

How many rounds are there in Vishvaraj Environment Deputy Manager Planning interview?
Vishvaraj Environment interview process usually has 3 rounds. The most common rounds in the Vishvaraj Environment interview process are Resume Shortlist, Technical and HR.

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more
Join Vishvaraj Environment Water for Billion+ People

Interview Questions from Similar Companies

VA Tech Wabag Interview Questions
3.9
 • 51 Interviews
DuPont Interview Questions
4.2
 • 44 Interviews
Clean Harbors Interview Questions
3.4
 • 30 Interviews
Enviri Interview Questions
4.0
 • 18 Interviews
Nalco water Interview Questions
4.0
 • 15 Interviews
View all
Vishvaraj Environment Deputy Manager Planning Salary
based on 4 salaries
₹13.5 L/yr - ₹18.5 L/yr
47% more than the average Deputy Manager Planning Salary in India
View more details

Vishvaraj Environment Deputy Manager Planning Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
56 salaries
unlock blur

₹4.8 L/yr - ₹9.6 L/yr

Assistant Manager
55 salaries
unlock blur

₹6 L/yr - ₹13.8 L/yr

Civil Engineer
30 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Manager
29 salaries
unlock blur

₹5.9 L/yr - ₹13.8 L/yr

Asst Store
26 salaries
unlock blur

₹1.9 L/yr - ₹3.8 L/yr

Explore more salaries
Compare Vishvaraj Environment with

Ion Exchange India

3.7
Compare

Re Sustainability Limited

3.9
Compare

DuPont

4.2
Compare

WM Universal Solutions Private Limited

3.8
Compare
write
Share an Interview