Assistant Project Manager

Assistant Project Manager Interview Questions and Answers for Freshers

Updated 2 Jul 2025
search-icon

Q. On which side has the smart meter been installed, and how can its location be determined?

Ans.

Smart meters are typically installed on the exterior of buildings, often near the utility connection point.

  • Smart meters are usually located on the side of the building facing the street for easy access.

  • They can be found near the main electrical panel or gas line entry point.

  • In residential areas, they are often mounted on a wall or pole outside the home.

  • For example, in urban settings, smart meters may be installed on the sidewalk side of a building.

Q. What is the development length, and why is it provided in terms of tension and compression?

Ans.

Development length is the length of reinforcement required to transfer the stress between the steel and concrete.

  • Development length is necessary to ensure the bond between reinforcement and concrete.

  • In tension, development length prevents the steel from pulling out of the concrete.

  • In compression, development length prevents the steel from buckling or crushing the concrete.

  • It is determined based on factors like concrete strength, steel diameter, and bond strength.

  • For example, ...read more

Asked in Accenture

2d ago

Q. What are the functions involved in C++?

Ans.

Functions in C++ are blocks of code that perform a specific task and can be called from other parts of the program.

  • Functions are declared using the 'function' keyword followed by the return type, name, and parameters.

  • Functions can be defined inside or outside of classes.

  • Functions can be overloaded, meaning multiple functions can have the same name but different parameters.

  • Functions can also be recursive, meaning they call themselves.

  • Example: int add(int a, int b) { return a +...read more

Asked in CBRE

2d ago

Q. Difference between GI AND ALuminium , How tiling is done

Ans.

GI and Aluminium are two different materials used in construction. Tiling is done by laying tiles in a specific pattern.

  • GI (Galvanized Iron) is a type of steel coated with zinc to prevent rusting, while Aluminium is a lightweight metal with good corrosion resistance.

  • Tiling is done by first preparing the surface, applying adhesive, and then laying the tiles in a desired pattern.

  • Grouting is done to fill the gaps between tiles and seal them.

  • Different types of tiles such as ceram...read more

Are these interview questions helpful?

Q. How much experience do you have with storage tanks?

Ans.

I have 3 years of experience working with storage tanks in various projects.

  • 3 years of experience in storage tanks

  • Knowledge of different types of storage tanks such as above ground, underground, and floating roof tanks

  • Experience in maintenance, inspection, and repair of storage tanks

  • Familiarity with industry standards and regulations related to storage tanks

Asked in Knight Frank

5d ago

Q. What is your non-negotiable location preference?

Ans.

Prefer to work in the city center for easy access to project sites and stakeholders.

  • Prefer location within city limits for convenience

  • Access to public transportation is important

  • Proximity to project sites and stakeholders is a priority

Assistant Project Manager Jobs

CBRE South Asia Pvt. Ltd logo
CBRE - Assistant Project Manager (5-6 yrs) 5-6 years
CBRE South Asia Pvt. Ltd
4.1
₹ 5 L/yr - ₹ 9 L/yr
(AmbitionBox estimate)
Jones Lang LaSalle Property Consultants (India) Pv t. Ltd. logo
Assistant Project Manager - Fire protection services 8-12 years
Jones Lang LaSalle Property Consultants (India) Pv t. Ltd.
4.1
₹ 7 L/yr - ₹ 11 L/yr
(AmbitionBox estimate)
Hyderabad / Secunderabad
Jones Lang LaSalle Property Consultants (India) Pv t. Ltd. logo
Assistant Project Manager - HVAC 4-7 years
Jones Lang LaSalle Property Consultants (India) Pv t. Ltd.
4.1
Hyderabad / Secunderabad

Asked in OM Logistics

4d ago

Q. Project components with technical aspects

Ans.

Project components with technical aspects involve the various elements of a project that require specialized knowledge or skills.

  • Identifying technical requirements for the project

  • Developing technical specifications for project deliverables

  • Implementing and testing technical solutions

  • Managing technical resources and vendors

  • Ensuring compliance with technical standards and regulations

Interview Experiences of Popular Companies

DMart Logo
3.9
 • 450 Interviews
JLL Logo
4.1
 • 409 Interviews
CBRE Logo
4.1
 • 300 Interviews
Psp Projects Logo
3.9
 • 59 Interviews
View all
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Assistant Project Manager Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Trusted by over 1.5 Crore job seekers to find their right fit company
80 L+

Reviews

10L+

Interviews

4 Cr+

Salaries

1.5 Cr+

Users

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2025 Info Edge (India) Ltd.

Follow Us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter
Profile Image
Hello, Guest
AmbitionBox Employee Choice Awards 2025
Winners announced!
awards-icon
Contribute to help millions!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos
Add office benefits
Add office benefits