CBRE
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
The Coefficient of Performance (COP) of a chiller plant measures its efficiency in converting energy into cooling output.
COP is defined as the ratio of cooling output (in BTUs or kW) to the energy input (in kW).
A higher COP indicates a more efficient chiller; for example, a COP of 5 means 5 units of cooling for 1 unit of energy.
Factors affecting COP include ambient temperature, load conditions, and maintenance pra...
Concrete test procedures ensure quality and strength through various testing methods and standards.
Slump Test: Measures workability; a higher slump indicates more fluid concrete.
Compressive Strength Test: Concrete samples are crushed to determine strength, typically at 7 and 28 days.
Flexural Strength Test: Assesses the tensile strength of concrete beams under bending.
Air Content Test: Determines the amount of air ...
Managing exceptions involves identifying, analyzing, and resolving unexpected issues to maintain operational efficiency.
Proactive Monitoring: Implementing systems to monitor operations can help identify potential exceptions before they escalate. For example, using KPIs to track performance metrics.
Root Cause Analysis: When an exception occurs, I conduct a thorough analysis to determine the underlying cause. For in...
I am motivated by the opportunity to streamline processes, foster teamwork, and contribute to the financial health of the organization.
Passion for efficiency: I enjoy identifying bottlenecks in the accounts payable process and implementing solutions to enhance workflow.
Team collaboration: Working closely with cross-functional teams to ensure timely payments motivates me, as it fosters a sense of unity and shared g...
Pattern queries involve searching for specific sequences or structures in data, often used in databases and data analysis.
Pattern matching can be done using SQL queries, e.g., 'SELECT * FROM patients WHERE name LIKE 'A%';'
Regular expressions (regex) are powerful for pattern matching in strings, e.g., validating email formats.
In data analysis, clustering algorithms can identify patterns in datasets, such as groupin...
Facility executive work involves managing and optimizing the operations, maintenance, and safety of physical spaces.
Overseeing building maintenance and repairs, ensuring facilities are safe and functional.
Managing budgets for facility operations, including utilities and maintenance costs.
Coordinating space planning and utilization to maximize efficiency, such as redesigning office layouts.
Implementing sustainabili...
Fapa panels typically have multiple loops, each capable of connecting various devices for effective monitoring and control.
Loop Count: A Fapa panel usually has multiple loops, often ranging from 2 to 8, depending on the model and configuration.
Device Capacity: Each loop can typically support 20 to 30 devices, such as smoke detectors, heat detectors, and manual call points.
Example: If a Fapa panel has 4 loops, it c...
Rate analysis involves evaluating costs for civil, structural, and finishing items to ensure accurate budgeting and pricing.
Identify the scope of work: Clearly define the items and quantities involved in the project.
Gather cost data: Collect historical cost data for materials, labor, and equipment from previous projects.
Break down costs: Analyze direct costs (materials, labor) and indirect costs (overheads, profit...
Preparing a running account bill involves detailed documentation of work completed, materials used, and costs incurred.
1. Review Contract Terms: Understand the payment schedule and conditions outlined in the contract.
2. Document Work Completed: List all completed tasks in civil, structure, and finishing works, e.g., foundation laying, wall plastering.
3. Quantify Materials Used: Record quantities of materials used,...
I manage escalations by prioritizing communication, understanding the issue, and collaborating on solutions to ensure timely resolution.
Establish clear communication channels: I ensure that all team members know how to escalate issues effectively.
Assess the situation: I gather all relevant information to understand the root cause of the escalation.
Prioritize issues: I categorize escalations based on urgency and im...
I applied via Referral
Experienced transportation specialist with a background in logistics and supply chain management.
Over 5 years of experience in coordinating transportation operations
Skilled in optimizing routes and reducing costs
Proficient in using transportation management systems
Strong communication and problem-solving skills
Managed a team of drivers and ensured timely deliveries
I demonstrate my qualifications and capabilities through my experience, skills, certifications, and successful projects.
Providing examples of past projects where I successfully managed transportation logistics
Highlighting relevant certifications such as CDL or PMP
Showcasing my problem-solving skills through real-life scenarios
Demonstrating my knowledge of transportation regulations and best practices
Transport services efficiency is crucial for timely and cost-effective movement of goods and people.
Efficiency of transport services can be measured by factors such as on-time delivery, fuel consumption, and vehicle utilization.
Utilizing technology like GPS tracking and route optimization software can improve efficiency.
Examples of efficient transport services include companies like UPS and FedEx, known for their relia...
As a Transportation Specialist, my role would involve coordinating and optimizing transportation operations to ensure efficient and timely delivery of goods.
Coordinating transportation schedules and routes
Optimizing transportation operations to reduce costs and improve efficiency
Ensuring timely delivery of goods to customers
Monitoring and tracking transportation vehicles and shipments
Collaborating with drivers, supplie...
I enjoy working with a team and believe collaboration leads to better results.
I believe teamwork allows for different perspectives and ideas to be shared
I am comfortable communicating and collaborating with team members
I have experience working in team-oriented environments, such as group projects or team sports
Lack of promotions may be due to focusing on gaining experience and expertise in current role rather than seeking promotions.
I have chosen to focus on gaining valuable experience and expertise in my current role rather than actively seeking promotions.
I have taken on additional responsibilities and projects to enhance my skills and knowledge in my field.
I have consistently received positive feedback on my performance a...
I would represent your company with professionalism, dedication, and a commitment to excellence.
I would always prioritize safety and efficiency in all transportation operations.
I would communicate effectively with clients, colleagues, and stakeholders to ensure smooth operations.
I would uphold the company's values and reputation in all interactions and transactions.
I would continuously seek opportunities for improvemen...
Yes, I believe that my team and I can represent the company and department well.
We have a strong track record of professionalism and dedication to our work.
Our team has excellent communication skills and a strong work ethic.
We are committed to upholding the values and reputation of the company.
We have successfully represented the company at various events and meetings in the past.
I appeared for an interview in Dec 2024, where I was asked the following questions.
I am drawn to CBRE for its innovative approach, commitment to sustainability, and opportunities for professional growth in real estate.
CBRE's reputation as a global leader in real estate services aligns with my career aspirations.
The company's focus on sustainability resonates with my values; I admire their initiatives like the Global Sustainability Program.
I am excited about the opportunity to work with diverse teams ...
I appeared for an interview in Dec 2024, where I was asked the following questions.
The process of constructing high-rise building slabs involves careful planning, execution, and quality control.
1. Site Preparation: Clear the site and ensure proper drainage.
2. Foundation Work: Lay a strong foundation to support the weight of the building.
3. Formwork Installation: Set up formwork for the slab to shape the concrete.
4. Reinforcement: Place rebar or steel mesh within the formwork for added strength.
5. Con...
Concrete test procedures ensure quality and strength through various testing methods and standards.
Slump Test: Measures workability; a higher slump indicates more fluid concrete.
Compressive Strength Test: Concrete samples are crushed to determine strength, typically at 7 and 28 days.
Flexural Strength Test: Assesses the tensile strength of concrete beams under bending.
Air Content Test: Determines the amount of air in co...
I applied via Approached by Company and was interviewed in Dec 2024. There were 3 interview rounds.
Achieving net zero requires a combination of reducing emissions, increasing renewable energy usage, and implementing carbon offsetting strategies.
Reduce carbon emissions through energy efficiency improvements and transitioning to renewable energy sources
Increase renewable energy usage by investing in solar, wind, and hydro power
Implement carbon offsetting strategies such as reforestation projects or carbon capture tech...
I expect to contribute to the development and implementation of sustainable energy solutions.
Contribute to the development of renewable energy projects
Implement energy efficiency initiatives
Collaborate with stakeholders to promote sustainability
Stay updated on industry trends and technologies
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
Shear force and bending moment are key concepts in structural engineering, representing internal forces in a beam.
Shear force is the force perpendicular to the beam's longitudinal axis, causing it to shear or slide.
Bending moment is the internal moment that causes a beam to bend or flex.
Shear force and bending moment diagrams are used to visualize the distribution of these forces along the length of a beam.
Calculating ...
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
I appeared for an interview in Oct 2024.
I am a dedicated professional with a passion for technology and a strong background in software development and project management.
Background in Computer Science with a degree from XYZ University.
Over 5 years of experience in software development, specializing in web applications.
Led a team of developers on a successful project that increased user engagement by 30%.
Strong skills in programming languages such as JavaScr...
Depreciation is for tangible assets; amortization is for intangible assets, both reflecting value loss over time.
Depreciation applies to physical assets like machinery and vehicles.
Amortization applies to intangible assets like patents and copyrights.
Example of depreciation: A delivery truck worth $30,000 may depreciate by $3,000 annually.
Example of amortization: A patent costing $10,000 may be amortized over its usefu...
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
HVAC stands for Heating, Ventilation, and Air Conditioning. It refers to the system used to control the temperature, humidity, and air quality in a building.
HVAC systems are responsible for heating and cooling buildings to maintain a comfortable environment for occupants.
Ventilation systems help circulate and filter air to improve indoor air quality.
Air conditioning systems control the temperature and humidity levels w...
STP stands for Sewage Treatment Plant, which is a facility used to treat wastewater from residential, commercial, and industrial sources.
STP receives wastewater from various sources
Primary treatment involves physical processes to remove solids
Secondary treatment uses biological processes to further treat the wastewater
Tertiary treatment may be used to remove remaining contaminants
Treated water is discharged or reused
Ex...
To work a DG Set, ensure proper maintenance, fuel supply, and monitoring of performance.
Ensure regular maintenance checks to keep the DG Set in good working condition
Monitor fuel supply to ensure uninterrupted power generation
Keep track of performance indicators like load capacity and efficiency
Train staff on operating procedures and emergency protocols
Have a backup plan in case of power failure
The safety of a transformer is crucial for preventing accidents and ensuring reliable power distribution.
Regular maintenance and inspections are essential to ensure the safe operation of transformers.
Proper grounding and insulation are key factors in maintaining the safety of transformers.
Implementing safety protocols and training for personnel working with transformers is important to prevent accidents.
Using protectiv...
MPU stands for Main Power Unit. It is responsible for providing power to critical systems in a facility.
MPU is a key component in ensuring uninterrupted power supply to critical systems such as data centers, hospitals, and emergency response centers.
It often includes backup power sources such as generators or battery systems to ensure continuous operation in case of power outages.
Regular maintenance and testing of MPU ...
Top trending discussions
The duration of CBRE interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 319 interview experiences
Difficulty level
Duration
based on 4.4k reviews
Rating in categories
Assistant Manager
1.4k
salaries
| ₹3.5 L/yr - ₹11.4 L/yr |
Facility Executive
612
salaries
| ₹2.2 L/yr - ₹6.3 L/yr |
Assistant Facility Manager
525
salaries
| ₹3 L/yr - ₹10.2 L/yr |
Deputy Manager
516
salaries
| ₹4.6 L/yr - ₹13.5 L/yr |
Facility Manager
463
salaries
| ₹3.7 L/yr - ₹14 L/yr |
JLL
NoBroker
Cushman & Wakefield
Colliers India