Cluster Engineer
Cluster Engineer Interview Questions and Answers

Asked in Tenon Facility Management

Q. What would you check if the DG did not start?
Check for power supply, fuel level, battery, and ignition switch.
Check if there is enough fuel in the tank.
Check if the battery is charged and connected properly.
Check if the ignition switch is turned on.
Check if there is power supply to the DG.
Check if there are any error codes or alarms displayed on the control panel.

Asked in Reliance BP Mobility

Q. What should be ensured at a construction site before work begins?
Ensure safety measures, permits, and inspections are in place before starting construction activities.
Ensure all necessary safety measures are in place, such as proper signage, barriers, and personal protective equipment.
Obtain all required permits and approvals before beginning any construction work.
Schedule and conduct any pre-construction inspections to identify potential hazards or issues.
Verify that all workers are properly trained and equipped to safely perform their ta...read more

Asked in Tenon Facility Management

Q. What do you know about telecom infrastructure?
I have knowledge of telecom infrastructure.
I am familiar with the components of telecom infrastructure such as switches, routers, and servers.
I understand the importance of network security and data privacy in telecom infrastructure.
I have experience in configuring and maintaining telecom infrastructure.
I am knowledgeable about different types of telecom networks such as LAN, WAN, and MAN.
I am aware of the latest trends and technologies in telecom infrastructure such as 5G an...read more

Asked in Tenon Facility Management

Q. How do you control outages and energy consumption in your cluster?
To control outage & energy, monitor cluster health, use power management tools, and implement redundancy.
Monitor cluster health regularly to detect any potential issues
Use power management tools to optimize energy usage
Implement redundancy to ensure high availability
Have a disaster recovery plan in place
Perform regular maintenance and updates
Consider using load balancers to distribute workload
Use virtualization to improve resource utilization

Asked in Reliance BP Mobility

Q. How do you ensure excellent quality and safety at a site?
Quality & safety at site can be ensured through proper training, regular inspections, clear communication, and strict adherence to protocols.
Provide thorough training to all personnel on safety procedures and quality standards
Conduct regular inspections to identify and address any potential hazards or quality issues
Maintain clear communication channels between all team members to ensure everyone is aware of safety protocols and quality expectations
Strictly enforce adherence t...read more

Asked in Reliance BP Mobility

Q. What checks are performed at a construction site during concreting?
Check for construction site at concreting time includes formwork inspection, concrete mix testing, reinforcement placement, and weather conditions monitoring.
Inspect formwork for proper alignment and stability
Test concrete mix for desired strength and consistency
Ensure correct placement of reinforcement bars
Monitor weather conditions to prevent issues like rain affecting the concrete
Cluster Engineer Jobs


Asked in Tenon Facility Management

Q. How do you automate site deployment?
Automation of site can be achieved through various tools and techniques.
Use of configuration management tools like Ansible, Chef, Puppet
Continuous Integration and Deployment using Jenkins, Travis CI
Infrastructure as Code using Terraform, CloudFormation
Monitoring and Alerting using tools like Nagios, Prometheus
Automated Testing using tools like Selenium, JMeter
Use of containerization technologies like Docker, Kubernetes

Asked in Principle ACS Engineering India

Q. Explain about slump cone test
Slump cone test is a method to measure the workability of concrete.
It involves filling a slump cone with freshly mixed concrete, then lifting the cone to see how much the concrete slumps or settles.
The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.
The test helps ensure the concrete is of the right consistency for proper placement and compaction.
The results of the test can also indicate if adjustments need to be made to th...read more
Share interview questions and help millions of jobseekers 🌟

Asked in Accenture

Q. Do you have any technical questions?
Interview Questions of Similar Designations
Interview Experiences of Popular Companies








Reviews
Interviews
Salaries
Users

