Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by ArcelorMittal Nippon Steel Team. If you also belong to the team, you can get access from here

ArcelorMittal Nippon Steel Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

ArcelorMittal Nippon Steel Assistant Manager Maintenance Interview Questions and Answers

Updated 19 Jun 2024

5 Interview questions

🔥 Asked by recruiter 2 times
An Assistant Manager Maintenance was asked
Q. Describe your experience with barring checking and replacement, safety procedures, paperwork, and conveyor belt maintenance, including removing old bearings, fixing new ones, and ensuring proper nut tighten...
Ans. 

The process involves maintenance checks, part replacements, and ensuring equipment operates safely and efficiently.

  • Conduct thorough checks on the conveyor system before starting maintenance.

  • Replace old slue bearings with new ones to ensure smooth operation.

  • Tighten all nuts and bolts securely to prevent any operational issues.

  • Document all maintenance activities for future reference and compliance.

  • Test the conveyor ...

🔥 Asked by recruiter 3 times
An Assistant Manager Maintenance was asked
Q. Describe your experience with discharge chute replacement work, including safety procedures, documentation, removal of the old chute, replacement with a new chute, bolt tightening, documentation cancellatio...
Ans. 

Effective discharge chute replacement prioritizes safety, thorough documentation, and operational checks for optimal performance.

  • Ensure all safety protocols are followed, such as wearing PPE and securing the work area.

  • Document the entire process, including the removal of the old chute and installation of the new one.

  • Check all bolts and nuts for proper tightening to prevent future issues.

  • Conduct a trial run of the ...

Assistant Manager Maintenance Interview Questions Asked at Other Companies

Q1. Describe your experience with barring checking and replacement, s ... read more
Q2. Describe your experience with gearbox replacement, including safe ... read more
Q3. 1. Cost saving initiative in utilities like boiler, air compresso ... read more
Q4. Can you explain how to read a hydraulic circuit and describe its ... read more
Q5. Describe the process for motor replacement, emphasizing safety, d ... read more
🔥 Asked by recruiter 2 times
An Assistant Manager Maintenance was asked
Q. Describe your experience replacing a V-scraper, ensuring safety, completing necessary paperwork, and verifying the conveyor belt's functionality.
Ans. 

V-scraper replacement involves safety checks, proper documentation, and ensuring conveyor functionality post-replacement.

  • Ensure all safety gear is worn before starting the replacement.

  • Document the condition of the old V-scraper for future reference.

  • Carefully remove the old V-scraper, checking for any wear or damage.

  • Install the new V-scraper, ensuring it is aligned correctly.

  • Tighten all bolts and nuts securely to p...

🔥 Asked by recruiter 2 times
An Assistant Manager Maintenance was asked
Q. Describe your experience with gearbox replacement, including safety procedures, documentation, and quality assurance.
Ans. 

Effective gearbox replacement prioritizes safety, thorough documentation, and proper installation for optimal conveyor performance.

  • Ensure all safety protocols are followed, such as wearing PPE and locking out equipment before starting work.

  • Document the entire process, including the removal of the old gearbox and installation of the new one, for future reference.

  • Use a dial gauge to check alignment before tightening...

🔥 Asked by recruiter 4 times
An Assistant Manager Maintenance was asked
Q. Describe the process for motor replacement, emphasizing safety, documentation, cleanliness, testing, proper hardware procedures, alignment, and conveyor belt functionality, including necessary paperwork and...
Ans. 

Ensuring safe and efficient motor replacement while maintaining proper documentation and operational integrity.

  • Prioritize safety by using personal protective equipment (PPE) during motor replacement.

  • Document the entire process, including old motor removal and new motor installation.

  • Use a torque wrench to ensure proper bolt and nut tightening for safety.

  • Conduct a thorough inspection of the conveyor belt after insta...

ArcelorMittal Nippon Steel Assistant Manager Maintenance Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(5 Questions)

  • Q1. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace and bolt nut ti...
  • Ans. 

    Effective discharge chute replacement prioritizes safety, thorough documentation, and operational checks for optimal performance.

    • Ensure all safety protocols are followed, such as wearing PPE and securing the work area.

    • Document the entire process, including the removal of the old chute and installation of the new one.

    • Check all bolts and nuts for proper tightening to prevent future issues.

    • Conduct a trial run of the conve...

  • Answered by AI
  • Q2. Barring checking and replacement work and safety first and paper work and walked away clean and fresh and try out and blumber block top cover open and old slue barring remove and new slue barring fix and n...
  • Ans. 

    The process involves maintenance checks, part replacements, and ensuring equipment operates safely and efficiently.

    • Conduct thorough checks on the conveyor system before starting maintenance.

    • Replace old slue bearings with new ones to ensure smooth operation.

    • Tighten all nuts and bolts securely to prevent any operational issues.

    • Document all maintenance activities for future reference and compliance.

    • Test the conveyor belt ...

  • Answered by AI
  • Q3. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and dayal guage ...
  • Ans. 

    Ensuring safe and efficient motor replacement while maintaining proper documentation and operational integrity.

    • Prioritize safety by using personal protective equipment (PPE) during motor replacement.

    • Document the entire process, including old motor removal and new motor installation.

    • Use a torque wrench to ensure proper bolt and nut tightening for safety.

    • Conduct a thorough inspection of the conveyor belt after installati...

  • Answered by AI
  • Q4. Gear box replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old gear box remove and new gear box replace and bolt nut tightening sure and day...
  • Ans. 

    Effective gearbox replacement prioritizes safety, thorough documentation, and proper installation for optimal conveyor performance.

    • Ensure all safety protocols are followed, such as wearing PPE and locking out equipment before starting work.

    • Document the entire process, including the removal of the old gearbox and installation of the new one, for future reference.

    • Use a dial gauge to check alignment before tightening bolt...

  • Answered by AI
  • Q5. V-scraper replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old v-scraper remove and new v-scraper replace and bolt nut tightening sure and ...
  • Ans. 

    V-scraper replacement involves safety checks, proper documentation, and ensuring conveyor functionality post-replacement.

    • Ensure all safety gear is worn before starting the replacement.

    • Document the condition of the old V-scraper for future reference.

    • Carefully remove the old V-scraper, checking for any wear or damage.

    • Install the new V-scraper, ensuring it is aligned correctly.

    • Tighten all bolts and nuts securely to preven...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for ArcelorMittal Nippon Steel Assistant Manager Maintenance interview:
  • Gear box replacement work
Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement

ArcelorMittal Nippon Steel HR Interview Questions

44 questions and answers

Q. What motivates you?
Q. Are you able to work within a team?
Q. What are your 5-year goals with our company?

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about ArcelorMittal Nippon Steel?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Explain maintenance process of transformers
  • Ans. 

    Maintenance process of transformers involves regular inspection, testing, and repair to ensure optimal performance and prevent breakdowns.

    • Regular inspection of transformer components such as bushings, tap changers, and cooling systems

    • Testing of insulation resistance, winding resistance, and oil quality

    • Repair or replacement of faulty components

    • Preventive maintenance measures such as cleaning and tightening of connection...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well on technicals of your subject
Are these interview questions helpful?
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is Hydrolic system
  • Q2. How to reduce Downtime.

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is very tough so prepared for it .

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Transformer maintenance
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I appeared for an interview before Aug 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Regarding Transformers,HT motors,Automation ,PLC logics & SAP
  • Q2. Also recruiters look your personality
  • Q3. Communication skills
  • Q4. Experience descriptions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident against your resume
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Total hydraulic Cylinders in CCM machine
  • Ans. 

    The total number of hydraulic cylinders in a CCM machine varies depending on the specific model and design.

    • The number of hydraulic cylinders in a CCM machine can range from 4 to 12 or more, depending on the size and complexity of the machine.

    • Each hydraulic cylinder in a CCM machine serves a specific function, such as controlling the movement of the mold or applying pressure to the molten metal.

    • The hydraulic cylinders i...

  • Answered by AI
  • Q2. EOT crane Main Hoist brake setting
  • Q3. Reason of Crane wheel wear
  • Ans. 

    Crane wheel wear is caused by factors such as overloading, misalignment, lack of lubrication, and poor maintenance.

    • Overloading the crane beyond its capacity can cause excessive wear on the wheels.

    • Misalignment of the crane wheels can lead to uneven wear and premature failure.

    • Lack of proper lubrication can increase friction and wear on the wheels.

    • Poor maintenance practices, such as not regularly inspecting and replacing ...

  • Answered by AI
  • Q4. Limits used in EOT crane

Interview Preparation Tips

Interview preparation tips for other job seekers - Be polity and confident during interview
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Decision making qualities.
  • Ans. 

    Good decision making qualities are essential for an Assistant Manager Maintenance to effectively handle maintenance issues and make strategic decisions.

    • Ability to analyze situations and gather relevant information

    • Consideration of potential outcomes and risks

    • Ability to prioritize tasks and make timely decisions

    • Consultation with team members or experts when needed

    • Flexibility to adapt to changing circumstances

    • Examples: De...

  • Answered by AI
  • Q2. Your careers aspects
  • Q3. Location issue

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep work knowledge

I applied via Company Website and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Asked only your job related question

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to join in less money they will take you

Interview Questionnaire 

1 Question

  • Q1. Store related question

I applied via Campus Placement and was interviewed before Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Basics question of steel making
  • Q2. College related projects?

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is mostly on technical one with focus on steel making for Metallurgy background, and questions were asked on major project done in your college.

ArcelorMittal Nippon Steel Interview FAQs

How many rounds are there in ArcelorMittal Nippon Steel Assistant Manager Maintenance interview?
ArcelorMittal Nippon Steel interview process usually has 2 rounds. The most common rounds in the ArcelorMittal Nippon Steel interview process are Group Discussion and HR.
What are the top questions asked in ArcelorMittal Nippon Steel Assistant Manager Maintenance interview?

Some of the top questions asked at the ArcelorMittal Nippon Steel Assistant Manager Maintenance interview -

  1. Barring checking and replacement work and safety first and paper work and walke...read more
  2. Gear box replacement work and safety first and paper work and walked away clean...read more
  3. Discharge chute replacement work and safety first and paper work and walked awa...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.5/5

based on 2 interview experiences

Difficulty level

Easy 50%
Moderate 50%

Duration

Less than 2 weeks 100%
View more
ArcelorMittal Nippon Steel Assistant Manager Maintenance Salary
based on 23 salaries
₹5 L/yr - ₹11.1 L/yr
14% less than the average Assistant Manager Maintenance Salary in India
View more details

ArcelorMittal Nippon Steel Assistant Manager Maintenance Reviews and Ratings

based on 6 reviews

3.2/5

Rating in categories

3.4

Skill development

3.2

Work-life balance

2.3

Salary

3.2

Job security

3.2

Company culture

2.7

Promotions

3.0

Work satisfaction

Explore 6 Reviews and Ratings
Deputy Manager
806 salaries
unlock blur

₹8.2 L/yr - ₹15 L/yr

Assistant Manager
657 salaries
unlock blur

₹5 L/yr - ₹11.2 L/yr

Manager
588 salaries
unlock blur

₹10.9 L/yr - ₹19.3 L/yr

Assistant Field Engineer
430 salaries
unlock blur

₹1.9 L/yr - ₹5.2 L/yr

Engineer
388 salaries
unlock blur

₹3.5 L/yr - ₹8 L/yr

Explore more salaries
Compare ArcelorMittal Nippon Steel with

Tata Steel

4.0
Compare

JSW Steel

3.9
Compare

Jindal Steel and Power

3.9
Compare

Jindal Stainless

4.2
Compare
write
Share an Interview