Filter interviews by
Welding symbols are used to communicate welding information on engineering drawings.
Welding symbols are used to indicate the type of weld, dimensions, and other important information related to the welding process.
They are typically composed of a reference line, arrow, and various symbols and letters.
Examples of welding symbols include fillet weld, groove weld, plug weld, and spot weld symbols.
Understanding welding sym...
Types of welding include MIG, TIG, stick, and flux-cored welding.
MIG welding uses a wire electrode and shielding gas to join metals.
TIG welding uses a tungsten electrode and inert gas to create a strong weld.
Stick welding, also known as shielded metal arc welding, uses a flux-coated electrode.
Flux-cored welding uses a tubular wire filled with flux to protect the weld.
Other types include spot welding, laser welding, and...
Design engineers use a variety of tools to create and analyze designs.
Design software like AutoCAD, SolidWorks, or CATIA is commonly used for creating 2D and 3D models.
Simulation tools like ANSYS or COMSOL are used to analyze the performance of designs under different conditions.
Prototyping tools like 3D printers or CNC machines are used to create physical prototypes for testing.
Collaboration tools like Slack or Trello...
To create 3D models from 2D drawings, use CAD software to extrude, revolve, and loft shapes based on the dimensions and features shown in the drawings.
Import the 2D drawing into CAD software such as AutoCAD or SolidWorks
Identify key dimensions and features from the drawing
Use extrude, revolve, and loft commands to create 3D shapes based on the 2D geometry
Add details such as fillets, chamfers, and holes to complete the ...
I applied via Approached by Company and was interviewed before Sep 2021. There were 2 interview rounds.
Top trending discussions
posted on 27 Nov 2023
I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.
posted on 8 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.
Managed finishing work such as painting, flooring, and fixtures to meet project deadlines
Coordinated with subcontractors and vendors to ensure materials and labor were on schedule
Implemented quality control measures to maintain high standards of workmanship
Resolved any issues or discrepancies d...
DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.
DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.
DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.
Seeking new challenges, growth opportunities, and a better work-life balance.
Looking for new challenges and opportunities to grow professionally.
Seeking a better work-life balance.
Interested in working with new technologies or industries.
Want to expand my skill set and knowledge.
Seeking a more supportive or collaborative work environment.
I expect a competitive salary based on my experience, skills, and the market standards.
Expectation of a salary package that reflects my qualifications and experience
Consideration of market standards and industry norms
Open to negotiation based on additional benefits or perks offered
Looking for a fair and transparent compensation structure
posted on 14 Feb 2023
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
Productivity of machinery and manpower is crucial for efficient operations.
Efficient machinery and skilled manpower can increase productivity.
Regular maintenance of machinery can prevent downtime and increase productivity.
Proper training and motivation of manpower can also improve productivity.
Use of automation and technology can further enhance productivity.
Productivity can be measured using metrics such as output per...
Standard thumb rule in estimation
Thumb rule is a rough estimate based on experience
It is not accurate and can vary based on project
Example: 1 hour per page for content writing
Example: 1 month per developer for a software project
I applied via Job Fair and was interviewed before Apr 2022. There were 2 interview rounds.
I appeared for an interview in Feb 2025, where I was asked the following questions.
Yes, I have extensive experience with planning tools like MSP and Primavera for project management and scheduling.
Proficient in Microsoft Project (MSP) for creating Gantt charts and tracking project progress.
Utilized Primavera P6 for managing large-scale construction projects, ensuring resource allocation and timeline adherence.
Experience in integrating MSP with other tools for enhanced reporting and collaboration.
Impl...
The project life cycle outlines the stages a project goes through from initiation to closure.
1. Initiation: Define the project scope and objectives. Example: A project charter is created.
2. Planning: Develop a detailed project plan, including timelines and resources. Example: Gantt charts are often used.
3. Execution: Implement the project plan and monitor progress. Example: Team members complete assigned tasks.
4. Monit...
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
posted on 30 Nov 2023
I appeared for an interview before Nov 2022.
I applied via Approached by Company and was interviewed before Dec 2023. There were 2 interview rounds.
A treatment plant is a facility where wastewater is treated to remove contaminants before being discharged back into the environment.
Treatment plants use a combination of physical, chemical, and biological processes to remove pollutants from wastewater.
Common processes in treatment plants include screening, sedimentation, filtration, and disinfection.
Examples of treatment plants include sewage treatment plants, water t...
based on 1 interview experience
based on 14 reviews
Rating in categories
Deputy Manager
230
salaries
| ₹5 L/yr - ₹12.5 L/yr |
Senior Engineer
175
salaries
| ₹3.5 L/yr - ₹10.5 L/yr |
Senior Manager
87
salaries
| ₹10 L/yr - ₹20 L/yr |
Manager
78
salaries
| ₹7.8 L/yr - ₹14.6 L/yr |
Deputy General Manager
58
salaries
| ₹12.1 L/yr - ₹28 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon