i
Brakes
India
Filter interviews by
I appeared for an interview before Jul 2024, where I was asked the following questions.
I admire your company's commitment to efficiency and innovation in warehouse management, and I want to contribute to that success.
Your company has a strong reputation for optimizing supply chain processes, which aligns with my passion for efficiency.
I am impressed by your investment in technology, such as automated inventory systems, which I believe enhances productivity.
The emphasis on employee training and developmen...
I expect a competitive salary based on my experience and industry standards, ideally between $50,000 and $60,000 annually.
Research industry standards: For example, similar roles in my area typically offer between $50,000 and $60,000.
Consider my experience: With over 5 years in warehouse management, I bring valuable skills that enhance efficiency.
Discuss benefits: I'm also interested in the overall compensation package,...
Top trending discussions
posted on 19 Jan 2021
I appeared for an interview in Jul 2020.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced...
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c...
I want to join Motherson to contribute to innovative automotive solutions and grow within a dynamic, global organization.
Motherson's commitment to innovation aligns with my passion for developing cutting-edge automotive technologies.
The company's global presence offers opportunities for cross-cultural collaboration, which I find enriching.
I admire Motherson's focus on sustainability and would love to contribute to eco-...
PLC (Programmable Logic Controller) is a digital computer used for automation of industrial processes.
PLCs are used to control machinery on factory assembly lines, amusement rides, or light fixtures.
They operate using a programmable memory to store instructions for specific tasks.
Example: A PLC can automate the process of filling bottles in a beverage factory.
PLCs can be programmed using ladder logic, structured text, ...
posted on 26 Aug 2022
I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.
posted on 3 Sep 2022
I applied via Naukri.com and was interviewed before Sep 2021. There was 1 interview round.
posted on 29 Oct 2023
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 3 interview rounds.
To improve skill manpower, focus on training programs, mentorship, career development, and recruitment strategies.
Implement regular training programs to enhance skills and knowledge
Provide mentorship opportunities for junior employees to learn from experienced professionals
Offer career development paths and opportunities for advancement within the organization
Revise recruitment strategies to attract top talent with the...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves setting up autonomous maintenance teams, conducting planned maintenance activities, and improving overall equipment efficiency.
TPM also emphasizes training employees to take ownership...
posted on 31 Jan 2023
I applied via Naukri.com and was interviewed in Jul 2022. There were 2 interview rounds.
The end-to-end process for wiring harness involves designing, manufacturing, testing, and installation.
Designing the wiring harness based on the electrical requirements and specifications
Manufacturing the harness using automated machines or manual labor
Testing the harness for electrical continuity, insulation resistance, and other parameters
Installing the harness in the vehicle or equipment
Ensuring proper routing and s...
FAI stands for First Article Inspection, a process to verify the initial production run meets all requirements.
FAI from 1 is the initial inspection of the first article produced in a production run
FAI from 2 is the inspection of the first article produced after changes have been made to the production process
FAI from 3 is the inspection of the first article produced after changes have been made to the design or enginee...
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Trainee
287
salaries
| ₹1.1 L/yr - ₹3.1 L/yr |
Engineer
254
salaries
| ₹4.2 L/yr - ₹8.9 L/yr |
Junior Engineer
194
salaries
| ₹1.9 L/yr - ₹5.1 L/yr |
Senior Engineer
155
salaries
| ₹5.7 L/yr - ₹11.5 L/yr |
Assistant Manager
134
salaries
| ₹10 L/yr - ₹16.8 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
UNO Minda