Street lights should be placed at a distance of approximately 30-50 meters apart for optimal illumination.
Street lights should be spaced evenly to ensure consistent lighting along the road
Consider factors such as road width, traffic flow, and surrounding environment when determining spacing
Proper spacing helps improve visibility for drivers and pedestrians, enhancing safety on the road
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Oct 2020. There was 1 interview round.
posted on 29 Apr 2022
A.C to D.C. conversion can be done using a rectifier circuit.
A rectifier circuit can be used to convert A.C. to D.C.
The rectifier circuit can be half-wave or full-wave.
Half-wave rectifier only allows half of the A.C. wave to pass through, while full-wave rectifier allows the entire wave.
The rectifier circuit can be made using diodes.
The output of the rectifier circuit is not smooth and requires filtering using capacito...
posted on 16 Jul 2021
I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.
I appeared for an interview in Dec 2022.
I appeared for an interview before Jul 2024, where I was asked the following questions.
Lap length is the overlap length required for joining two reinforcing bars in concrete structures to ensure structural integrity.
Lap length is essential to transfer stress between overlapping bars effectively.
Typically, lap length is calculated as a multiple of the bar diameter, often 40 times the diameter for tension bars.
In seismic zones, longer lap lengths may be required to accommodate dynamic loads.
For example, if...
Field density of soil is determined using methods like the sand cone test, nuclear density gauge, and rubber balloon method.
Sand Cone Test: Involves excavating a small hole, filling it with sand, and measuring the volume of sand used to determine density.
Nuclear Density Gauge: Uses radioactive isotopes to measure the density of soil in place, providing quick results.
Rubber Balloon Method: A balloon is inserted into a h...
I appeared for an interview before Mar 2024, where I was asked the following questions.
The cable laying process involves planning, trenching, installation, and testing for effective electrical distribution.
Planning: Assess the route and determine cable type based on load requirements.
Trenching: Excavate the ground to lay cables, ensuring proper depth and width.
Installation: Place cables in trenches, using protective conduits if necessary.
Backfilling: Cover the cables with soil, ensuring no sharp objects ...
I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
Salary discusses boss and hr
based on 1 interview experience
based on 11 reviews
Rating in categories
BMS Operator
7
salaries
| ₹8.1 L/yr - ₹12.1 L/yr |
Hvac Technician
6
salaries
| ₹2.2 L/yr - ₹7.5 L/yr |
Electrical Engineer
5
salaries
| ₹8.4 L/yr - ₹15.7 L/yr |
Electrical Supervisor
5
salaries
| ₹5.1 L/yr - ₹10.2 L/yr |
HSE Officer
5
salaries
| ₹9.6 L/yr - ₹12.6 L/yr |
Saudi Binladin Group
Amara Raja Infra
Eversendai
Descon Engineering