Upload Button Icon Add office photos

Archirodon

Compare button icon Compare button icon Compare

Filter interviews by

Archirodon Interview Questions and Answers

Updated 31 Jul 2025
Popular Designations

20 Interview questions

A job Trainee was asked 6mo ago
Q. What is your troubleshooting process?
Ans. 

My troubleshooting process involves identifying the issue, researching possible solutions, testing different approaches, and seeking help if needed.

  • Identify the problem by gathering information and observing the issue

  • Research possible solutions by using resources like manuals, online forums, and asking colleagues

  • Test different approaches to see which one resolves the issue

  • Seek help from experts or supervisors if u...

View all job Trainee interview questions
A Mechanic Diesel was asked 9mo ago
Q. What could cause the brakes to jam?
Ans. 

Brake jamming can be caused by issues such as worn brake pads, rusted brake calipers, or a malfunctioning brake system.

  • Worn brake pads can cause the brakes to stick and not release properly.

  • Rusted brake calipers can prevent the brakes from fully disengaging after being applied.

  • A malfunctioning brake system, such as a faulty master cylinder or brake booster, can also lead to brake jamming.

  • Regular maintenance and in...

View all Mechanic Diesel interview questions
A Mechanic Diesel was asked 9mo ago
Q. What problems can cause an air dryer malfunction?
Ans. 

The problem for air dryer complaints can be caused by issues such as clogged filters, leaks, or malfunctioning components.

  • Clogged filters can restrict airflow and cause the air dryer to not function properly.

  • Leaks in the air system can lead to a decrease in air pressure and affect the performance of the air dryer.

  • Malfunctioning components such as valves or sensors can also result in air dryer complaints.

View all Mechanic Diesel interview questions
A Mechanic Diesel was asked 9mo ago
Q. What problems can cause overheating?
Ans. 

Possible causes of overheating in a diesel engine

  • Low coolant levels

  • Faulty thermostat

  • Clogged radiator

  • Malfunctioning water pump

  • Leaking head gasket

  • Blocked exhaust system

  • Incorrect fuel mixture

View all Mechanic Diesel interview questions
A Civil Quantity Surveyor and Site Engineer was asked 11mo ago
Q. What are the Standard Methods of measurement Used in the construction Industry?
Ans. 

Standard Methods of Measurement (SMM) are guidelines used in the construction industry to measure and quantify building works.

  • SMM7 (Standard Method of Measurement of Building Works 7th Edition) - widely used in the UK for measuring building works

  • CESMM (Civil Engineering Standard Method of Measurement) - used for civil engineering works

  • NRM (New Rules of Measurement) - developed by the Royal Institute of Chartered S...

View all Civil Quantity Surveyor and Site Engineer interview questions
A Civil Quantity Surveyor and Site Engineer was asked 11mo ago
Q. What types of software are used for quantity take-off and estimation in construction?
Ans. 

Software such as Bluebeam, Planswift, and CostX are commonly used for quantity stack-off and estimation in construction.

  • Bluebeam

  • Planswift

  • CostX

View all Civil Quantity Surveyor and Site Engineer interview questions

Archirodon HR Interview Questions

4 questions and answers

Q. What is your experience in this field?
Q. Do you have experience in quantity surveying for marine work?
Q. How long have you worked with CESMM-03 and the FIDIC Red Book?
A Civil Quantity Surveyor and Site Engineer was asked 11mo ago
Q. What is the NRM? What are the uses of NRM1, NRM2, and NRM3?
Ans. 

NRM stands for New Rules of Measurement. NRM1 covers the preparation of bills of quantities, NRM2 covers the measurement rules for capital building works, and NRM3 covers the measurement rules for building maintenance works.

  • NRM1 is used for the preparation of bills of quantities in construction projects.

  • NRM2 provides measurement rules for capital building works, ensuring consistency and accuracy in quantifying con...

View all Civil Quantity Surveyor and Site Engineer interview questions
Are these interview questions helpful?
A Civil Quantity Surveyor and Site Engineer was asked 11mo ago
Q. What is the main role of the Quantity Surveyor in Pre-Contract and Post-Contract Stages?
Ans. 

Quantity Surveyors play a crucial role in both pre-contract and post-contract stages by managing costs and ensuring projects stay within budget.

  • Pre-Contract Stage: preparing cost estimates, bills of quantities, tender documents, and negotiating with contractors.

  • Post-Contract Stage: managing costs, valuing work done, handling variations, and settling final accounts.

  • Quantity Surveyors also provide advice on contract...

View all Civil Quantity Surveyor and Site Engineer interview questions
A Civil Quantity Surveyor and Site Engineer was asked 11mo ago
Q. What is Value Engineering?
Ans. 

Value Engineering is a systematic and organized approach to providing necessary functions in a project at the lowest cost.

  • Value Engineering involves analyzing the functions of a project to determine the best way to achieve them at the lowest cost.

  • It focuses on improving the value of a project by optimizing its functions, quality, and cost.

  • Value Engineering often involves brainstorming sessions with a team of exper...

View all Civil Quantity Surveyor and Site Engineer interview questions
A 3G 4G Arc Welder was asked 12mo ago
Q. What are the different welding processes you are familiar with?
Ans. 

Welding defects are imperfections in the weld that can compromise its strength and integrity.

  • Common welding defects include porosity, lack of fusion, undercut, and cracks.

  • These defects can be caused by improper welding techniques, poor quality materials, or environmental factors.

  • Examples of welding defects include blowholes in the weld, incomplete penetration, and slag inclusions.

  • Inspecting welds regularly and fol...

View all 3G 4G Arc Welder interview questions

Archirodon Interview Experiences

18 interviews found

job Trainee Interview Questions & Answers

user image Anonymous

posted on 8 Jan 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Dec 2024. There were 7 interview rounds.

Round 1 - Aptitude Test 

Aptitude test explore a person's inclination tendancy or capacity to succeed in a specific situation they are usually made-up of a series of multiple choice question

Round 2 - Group Discussion 

Group discussion helps employer identify particular personality traits like leadership confidence impersonal and teamwork skills of potential employee

Round 3 - Case Study 

Case study interview isn't you average interview while most interview ask you to give example of how you use your skills on the job in a case study interview

Round 4 - Coding Test 

Coding interviews usually conpari se question on software and system desiodesiofor this candidates require analytical and logical thinking to solve problem and scenarios for the One side of virtual interview

Round 5 - Assignment 

A job interview is a task or project related to the position you're applying for .Many hiring Managers use these assignments in addition to traditional interview to learn more about you skills and ethics and evaluate how your abilities algin with the job requirements

Round 6 - HR 

(3 Questions)

  • Q1. The HR interview includes question such as gernal information about you previous job roles core skillsskills qualifications and salary expectations
  • Q2. What's you terubbleshotting process
  • Ans. 

    My troubleshooting process involves identifying the issue, researching possible solutions, testing different approaches, and seeking help if needed.

    • Identify the problem by gathering information and observing the issue

    • Research possible solutions by using resources like manuals, online forums, and asking colleagues

    • Test different approaches to see which one resolves the issue

    • Seek help from experts or supervisors if unable...

  • Answered by AI
  • Q3. Do you have any technical certification that Make you qualified for this job
Round 7 - Technical 

(2 Questions)

  • Q1. What technologies are you most proficient and how have you applied them in pas role ?
  • Q2. Can you explain a complex technical project that you managed and outcome ?

Interview Preparation Tips

Topics to prepare for Archirodon job Trainee interview:
  • Effective Communication
Interview preparation tips for other job seekers - Know what the job entile before you apply understand what skills and experience are required and how to develop thembe protective don't wait for apportunities to come to you go out and make them happen

HSE Officer Interview Questions & Answers

user image Anonymous

posted on 31 Jul 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jul 2025, where I was asked the following questions.

  • Q1. Self introduction
  • Q2. Preparation of risk assesment

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company and i strongly recommend for anyone experienced guys.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What are the Standard Methods of measurement Used in the construction Industry?
  • Ans. 

    Standard Methods of Measurement (SMM) are guidelines used in the construction industry to measure and quantify building works.

    • SMM7 (Standard Method of Measurement of Building Works 7th Edition) - widely used in the UK for measuring building works

    • CESMM (Civil Engineering Standard Method of Measurement) - used for civil engineering works

    • NRM (New Rules of Measurement) - developed by the Royal Institute of Chartered Survey...

  • Answered by AI
  • Q2. What types of software are used for quantity stack-off and estimation in construction?
  • Ans. 

    Software such as Bluebeam, Planswift, and CostX are commonly used for quantity stack-off and estimation in construction.

    • Bluebeam

    • Planswift

    • CostX

  • Answered by AI
  • Q3. What is the NRM? Use of NRM1, 2 and 3
  • Ans. 

    NRM stands for New Rules of Measurement. NRM1 covers the preparation of bills of quantities, NRM2 covers the measurement rules for capital building works, and NRM3 covers the measurement rules for building maintenance works.

    • NRM1 is used for the preparation of bills of quantities in construction projects.

    • NRM2 provides measurement rules for capital building works, ensuring consistency and accuracy in quantifying construc...

  • Answered by AI
  • Q4. What is the Value Engineering?
  • Q5. What is the main Role of the Quantity Surveyor in Pre-Contact and Post-Contract Stages?
Round 2 - HR 

(1 Question)

  • Q1. What is the Salary Expectation based on your Qualifications and Experience?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What are the Arc welder
  • Q2. What are the welding
  • Ans. 

    Welding defects are imperfections in the weld that can compromise its strength and integrity.

    • Common welding defects include porosity, lack of fusion, undercut, and cracks.

    • These defects can be caused by improper welding techniques, poor quality materials, or environmental factors.

    • Examples of welding defects include blowholes in the weld, incomplete penetration, and slag inclusions.

    • Inspecting welds regularly and followin...

  • Answered by AI
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

Importance of marketing

Round 2 - Aptitude Test 

Various aspects in accounting

Round 3 - Group Discussion 

Importance of work life

Round 4 - HR 

(2 Questions)

  • Q1. Introduce yourself
  • Q2. Why we should hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Good and very good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Base plate size, thickness ,tube size, thickness o.d.,id. Weight/meter Ans 150 m.m, thickness 6m.m., tube size max. 6 merer, thickness 4.0 m.m., o.d 48.3 m.m. ,i.d. 40.3 m.m. , weight/ meter 4.4 k.g
  • Q2. Type of scaffold Ans. (1) mobile tower (2) indipendent tower (3) suspended tower (4) candilever (5) racker tower (6) basket (7) febricate and frame scaffold
  • Ans. 

    There are various types of scaffolds such as mobile tower, independent tower, suspended tower, cantilever, racker tower, basket, and fabricated and frame scaffold.

    • Mobile tower scaffold is a type of scaffold that can be easily moved from one place to another.

    • Independent tower scaffold is a free-standing scaffold that does not require support from the building or structure.

    • Suspended tower scaffold is a type of scaffold t...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Gin wheel capacity Ans. 25 k.g.
  • Ans. 

    The gin wheel capacity is 25 kg.

    • The gin wheel is a pulley system used to lift and lower materials on a scaffold.

    • The capacity of the gin wheel refers to the maximum weight it can safely lift.

    • It is important to ensure that the weight of the load being lifted does not exceed the capacity of the gin wheel.

    • Exceeding the capacity can result in accidents and injuries.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good archirodon very nice company
And good management
Everything is very good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. I know DB dressing. Cable glanding paper working and i will do better then others
Round 3 - One-on-one 

(1 Question)

  • Q1. You can speak me any Question in house working.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jul 2024, where I was asked the following questions.

  • Q1. What about the Experience in same field?
  • Ans. 

    I have extensive experience in quantity surveying, managing costs and contracts for various construction projects.

    • Over 5 years of experience in quantity surveying for residential and commercial projects.

    • Successfully managed a $10 million commercial building project, ensuring budget adherence.

    • Conducted cost estimation and analysis for multiple projects, leading to a 15% reduction in overall costs.

    • Collaborated with archi...

  • Answered by AI
  • Q2. Do you have a Experience in marine work Quantity Surveying?
  • Ans. 

    Yes, I have experience in marine work Quantity Surveying, managing costs and contracts for various marine projects.

    • Worked on a coastal protection project, estimating costs for materials and labor.

    • Managed budget for a marina development, ensuring compliance with marine regulations.

    • Conducted risk assessments for underwater construction projects, analyzing potential cost impacts.

    • Collaborated with engineers and environment...

  • Answered by AI
  • Q3. How long You work with Cesmm -03 with Fidic Red Book?
  • Ans. 

    I have extensive experience working with CESMM-3 and FIDIC Red Book in various construction projects.

    • Over 5 years of experience using CESMM-3 for measurement and billing.

    • Familiar with FIDIC Red Book clauses for contract management.

    • Worked on projects where CESMM-3 was integrated with FIDIC for accurate cost estimation.

    • Example: Managed a civil engineering project where CESMM-3 helped streamline the measurement process.

  • Answered by AI
  • Q4. How you geting the Rock Quantities from the Cross Section Drawing
  • Ans. 

    Extracting rock quantities from cross-section drawings involves measuring areas and applying volume calculations.

    • Identify the cross-section drawing and locate the rock layers.

    • Measure the area of the rock layer using appropriate scale.

    • Calculate the volume by multiplying the area by the length of the section.

    • Use software tools like AutoCAD for accurate measurements.

    • Example: If the area of a rock layer is 50 m² and the le...

  • Answered by AI
  • Q5. What is the Breakwater
  • Ans. 

    A breakwater is a structure built to protect coastlines from wave action and erosion.

    • Breakwaters are typically constructed from rock, concrete, or other durable materials.

    • They can be either fixed or floating structures, depending on the design and location.

    • Examples include the Stone Harbor Breakwater in New Jersey and the San Francisco Breakwater.

    • Breakwaters help create calm water areas for harbors and marinas, facilit...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - "Continuously develop your skills to the highest level in your field, making yourself truly exceptional and impossible to replace.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What's problem for over heating
  • Q2. What's problem for air driyer complaint
  • Ans. 

    The problem for air dryer complaints can be caused by issues such as clogged filters, leaks, or malfunctioning components.

    • Clogged filters can restrict airflow and cause the air dryer to not function properly.

    • Leaks in the air system can lead to a decrease in air pressure and affect the performance of the air dryer.

    • Malfunctioning components such as valves or sensors can also result in air dryer complaints.

  • Answered by AI
  • Q3. What's problem breake jaming
  • Ans. 

    Brake jamming can be caused by issues such as worn brake pads, rusted brake calipers, or a malfunctioning brake system.

    • Worn brake pads can cause the brakes to stick and not release properly.

    • Rusted brake calipers can prevent the brakes from fully disengaging after being applied.

    • A malfunctioning brake system, such as a faulty master cylinder or brake booster, can also lead to brake jamming.

    • Regular maintenance and inspect...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Archirodon Mechanic Diesel interview:
  • Mechanical Maintenance
Interview preparation tips for other job seekers - Hard work
Round 1 - One-on-one 

(1 Question)

  • Q1. Technical department
Round 2 - Technical 

(1 Question)

  • Q1. I Mohammed tajuddin have Diploma Civil engineer with Second Class in May 1997 and having experience in Roads Building Roads Building and oil and gas and petroleum companies in construction in construction ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Need job offer as soon as possible and I will signed up for the agreement

Top trending discussions

View All
Interview Hub
5d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Archirodon?
Ask anonymously on communities.

Archirodon Interview FAQs

How many rounds are there in Archirodon interview?
Archirodon interview process usually has 2-3 rounds. The most common rounds in the Archirodon interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Archirodon interview?

Some of the top questions asked at the Archirodon interview -

  1. Type of scaffold Ans. (1) mobile tower (2) indipendent tower (3) suspended tow...read more
  2. Do you know templates for different documentati...read more
  3. What types of software are used for quantity stack-off and estimation in constr...read more
How long is the Archirodon interview process?

The duration of Archirodon interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.6/5

based on 15 interview experiences

Difficulty level

Easy 38%
Moderate 38%
Hard 25%

Duration

Less than 2 weeks 86%
More than 8 weeks 14%
View more

Interview Questions from Similar Companies

Burns & McDonnell Interview Questions
4.2
 • 51 Interviews
Amara Raja Infra Interview Questions
4.0
 • 43 Interviews
Eversendai Interview Questions
3.7
 • 29 Interviews
Descon Engineering Interview Questions
4.2
 • 21 Interviews
View all

Archirodon Reviews and Ratings

based on 230 reviews

3.9/5

Rating in categories

4.0

Skill development

3.8

Work-life balance

3.7

Salary

3.8

Job security

3.9

Company culture

3.2

Promotions

3.8

Work satisfaction

Explore 230 Reviews and Ratings
HSE Officer
10 salaries
unlock blur

₹9.2 L/yr - ₹15.5 L/yr

Mechanical Engineer
10 salaries
unlock blur

₹10 L/yr - ₹15.5 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹6 L/yr - ₹13.4 L/yr

Workshop Manager
5 salaries
unlock blur

₹4.8 L/yr - ₹12 L/yr

Electrical Technician
5 salaries
unlock blur

₹4.5 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Archirodon with

Nasser S. Al Hajri Corporation

3.5
Compare

Saudi Binladin Group

4.2
Compare

Leighton Contractors

4.2
Compare

Amara Raja Infra

4.0
Compare
write
Share an Interview