I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Top trending discussions
posted on 29 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
posted on 10 Nov 2021
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
posted on 13 Aug 2022
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu...
posted on 22 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
Least count is the smallest measurement that can be taken by an instrument.
It is the smallest value that can be measured by an instrument.
It is determined by the precision of the instrument.
For example, the least count of a ruler with millimeter markings is 1 mm.
It is important to consider the least count when taking measurements to ensure accuracy.
Stress is the force applied per unit area, while strain is the deformation caused by stress.
Stress is a measure of the force applied to a material per unit area
Strain is the measure of the deformation caused by stress
Stress and strain are related by the material's elasticity and its ability to resist deformation
Stress can be tensile, compressive, or shear
Strain can be elastic, plastic, or failure
Examples include stretc...
Important quality documents include SOPs, work instructions, quality manuals, and validation protocols.
Standard Operating Procedures (SOPs) outline step-by-step instructions for performing tasks
Work instructions provide detailed instructions for specific tasks
Quality manuals outline the quality management system of an organization
Validation protocols ensure that equipment, processes, and systems meet predetermined spec...
I applied via LinkedIn and was interviewed in Oct 2021. There were 5 interview rounds.
based on 1 interview experience
Difficulty level
Duration
Senior Engineer
31
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Assistant Manager
21
salaries
| ₹8 L/yr - ₹12.2 L/yr |
Engineer
13
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Quality Engineer
11
salaries
| ₹4.6 L/yr - ₹6.5 L/yr |
Production Engineer
10
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Nasser S. Al Hajri Corporation
Ramky Infrastructure
L & W Constructions
Tractebel