Filter interviews by
Manpower can be handled by effective communication, training, delegation, and motivation.
Communicate clear expectations and goals
Provide necessary training and resources
Delegate tasks based on skills and strengths
Motivate through recognition and rewards
Address any performance issues promptly
Encourage teamwork and collaboration
The least count of a micrometer is the smallest measurement that can be accurately read on the micrometer scale.
The least count is determined by the number of divisions on the micrometer scale and the pitch of the screw.
It is usually expressed in micrometers or millimeters.
For example, if a micrometer has 50 divisions on the scale and the pitch of the screw is 0.5 mm, then the least count would be 0.01 mm (0.5 mm ...
Vernier least count is the smallest measurement that can be made using a Vernier scale.
Vernier least count is determined by the difference between one main scale division and one Vernier scale division.
It helps in increasing the accuracy of measurements made using a Vernier scale.
For example, if the main scale has divisions of 1 mm and the Vernier scale has divisions of 0.1 mm, the least count would be 0.1 mm.
Root cause analysis identifies the underlying reasons for defects or problems to prevent recurrence.
Use the 5 Whys technique: Ask 'why' repeatedly to drill down to the root cause. Example: Why did the machine fail? Because it overheated. Why did it overheat? Because it lacked lubrication.
Employ Fishbone diagrams to visualize potential causes. Example: Categorize causes into people, processes, materials, and equipm...
Customer complaints and audits can be handled by addressing the root cause, providing corrective actions, and ensuring continuous improvement.
Listen to the customer's complaint and empathize with their situation
Investigate the issue thoroughly to identify the root cause
Provide corrective actions to prevent the issue from recurring
Communicate the corrective actions to the customer and follow up to ensure satisfacti...
MTTR stands for Mean Time To Repair, which is a measure of the average time it takes to repair a machine or equipment.
MTTR is an important metric used in maintenance engineering to assess the efficiency of maintenance processes.
It is calculated by dividing the total downtime by the number of repairs performed.
A lower MTTR indicates a more efficient maintenance process and better equipment reliability.
MTTR can be u...
The last breakdown was related to hydraulic systems.
The breakdown occurred due to a leak in the hydraulic system.
The hydraulic symbols were used to identify and troubleshoot the issue.
The maintenance engineer had to repair or replace the faulty hydraulic component.
Proper maintenance and regular inspections can help prevent future breakdowns.
Root cause analysis using 5W1H and Why-Why analysis for NPD
5W1H is a tool used to identify the who, what, when, where, why, and how of a problem
Why-Why analysis is a technique used to identify the root cause of a problem by asking 'why' multiple times
Both tools are commonly used in New Product Development (NPD) to identify and address issues
The combination of these tools can help to identify the underlying cause o...
I'm seeking new challenges and opportunities for growth that align with my career goals and aspirations.
Desire for professional growth: I'm looking for a role that offers more opportunities for advancement and skill development.
Seeking a new challenge: I want to tackle different projects that push my boundaries and enhance my expertise.
Cultural fit: I'm looking for a company culture that aligns more closely with my val...
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
Basically question were asked from diploma
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
The last breakdown was related to hydraulic systems.
The breakdown occurred due to a leak in the hydraulic system.
The hydraulic symbols were used to identify and troubleshoot the issue.
The maintenance engineer had to repair or replace the faulty hydraulic component.
Proper maintenance and regular inspections can help prevent future breakdowns.
MTTR stands for Mean Time To Repair, which is a measure of the average time it takes to repair a machine or equipment.
MTTR is an important metric used in maintenance engineering to assess the efficiency of maintenance processes.
It is calculated by dividing the total downtime by the number of repairs performed.
A lower MTTR indicates a more efficient maintenance process and better equipment reliability.
MTTR can be used t...
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Customer complaints and audits can be handled by addressing the root cause, providing corrective actions, and ensuring continuous improvement.
Listen to the customer's complaint and empathize with their situation
Investigate the issue thoroughly to identify the root cause
Provide corrective actions to prevent the issue from recurring
Communicate the corrective actions to the customer and follow up to ensure satisfaction
Pre...
Manpower can be handled by effective communication, training, delegation, and motivation.
Communicate clear expectations and goals
Provide necessary training and resources
Delegate tasks based on skills and strengths
Motivate through recognition and rewards
Address any performance issues promptly
Encourage teamwork and collaboration
Problem solving of major rejection
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
I appeared for an interview before Jun 2024, where I was asked the following questions.
I am shifting here for career growth, new challenges, and to contribute my skills to a dynamic team in a thriving environment.
Career Advancement: Seeking opportunities for professional growth and leadership roles.
New Challenges: Excited to tackle complex projects that push my limits and enhance my skills.
Cultural Fit: Attracted to the company's values and collaborative work environment.
Location Benefits: The area offer...
I applied via Walk-in and was interviewed in Jul 2022. There was 1 interview round.
Root cause analysis using 5W1H and Why-Why analysis for NPD
5W1H is a tool used to identify the who, what, when, where, why, and how of a problem
Why-Why analysis is a technique used to identify the root cause of a problem by asking 'why' multiple times
Both tools are commonly used in New Product Development (NPD) to identify and address issues
The combination of these tools can help to identify the underlying cause of a p...
I appeared for an interview before Jul 2024, where I was asked the following questions.
Top trending discussions
The duration of Musashi Auto Parts interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 11 interview experiences
Difficulty level
Duration
based on 784 reviews
Rating in categories
Assistant Engineer
623
salaries
| ₹2 L/yr - ₹5.7 L/yr |
Engineer
189
salaries
| ₹2.8 L/yr - ₹7.3 L/yr |
Senior Engineer
135
salaries
| ₹4.8 L/yr - ₹9.9 L/yr |
Assistant Manager
114
salaries
| ₹8.5 L/yr - ₹14.9 L/yr |
Deputy Manager
96
salaries
| ₹9.8 L/yr - ₹17 L/yr |
Delphi TVS
Motherson Automotive Technologies and Engineering
Belrise Industries
Krishna Maruti