Upload Button Icon Add office photos

Filter interviews by

Neovatic Technologies Senior SAP Ppqm Consultant Interview Questions and Answers

Updated 6 Jan 2021

17 Interview questions

A Senior SAP Ppqm Consultant was asked
Q. What is an inspection plan?
Ans. 

An inspection plan is a document that outlines the steps and criteria for inspecting a product or process.

  • It includes information on the inspection characteristics, sampling procedures, and acceptance criteria.

  • Inspection plans are used in quality management to ensure that products meet the required standards.

  • They can be created for individual products or for a group of similar products.

  • Inspection plans can be crea...

A Senior SAP Ppqm Consultant was asked
Q. What is the difference between planned orders and production orders?
Ans. 

PLD. ORD refers to planned order while PRD. ORD refers to production order.

  • PLD. ORD is a tentative order created to meet the demand while PRD. ORD is a confirmed order to produce the required quantity.

  • PLD. ORD is created in the planning stage while PRD. ORD is created in the execution stage.

  • PLD. ORD does not have any material reservation while PRD. ORD has material reservation.

  • PLD. ORD can be converted to PRD. ORD...

Senior SAP Ppqm Consultant Interview Questions Asked at Other Companies

Q1. What is the difference between a stock requirements list and an M ... read more
Q2. What is the integration between PP, MM, SD, FICO, and QM?
Q3. What is the difference between repetitive and discrete manufactur ... read more
Q4. What is the difference between planned orders and production orde ... read more
Q5. What is the organizational structure of SAP PP?
A Senior SAP Ppqm Consultant was asked
Q. What is the BOM status?
Ans. 

BOM status refers to the current state of a Bill of Materials in a manufacturing process.

  • BOM status indicates whether a BOM is active or inactive.

  • It can also indicate whether a BOM is released for production or still in development.

  • BOM status can affect production planning and inventory management.

  • Examples of BOM status include 'released', 'obsolete', 'under development', and 'inactive'.

A Senior SAP Ppqm Consultant was asked
Q. What is the difference between repetitive and discrete manufacturing?
Ans. 

Repetitive and discrete are two types of manufacturing processes in SAP PP module.

  • Repetitive manufacturing is used for producing high volume, low variety products.

  • Discrete manufacturing is used for producing low volume, high variety products.

  • Repetitive manufacturing uses a production line with a fixed sequence of operations.

  • Discrete manufacturing uses a bill of materials (BOM) to define the components needed for e...

A Senior SAP Ppqm Consultant was asked
Q. What is a MIC?
Ans. 

MIC stands for Material Identification and Control.

  • MIC is a process in SAP PP/QM module that ensures the correct identification and control of materials used in production.

  • It involves assigning unique identification numbers to materials and tracking their usage throughout the production process.

  • MIC helps in maintaining quality standards and preventing errors or mix-ups in production.

  • It also helps in traceability a...

A Senior SAP Ppqm Consultant was asked
Q. What is the integration between PP, MM, SD, FICO, and QM?
Ans. 

Integration between PP, MM, SD, FICO, and QM in SAP.

  • PP creates production plan based on sales orders from SD and material availability from MM.

  • QM ensures quality control during production process and inspects finished products.

  • FICO manages financial aspects of production and sales.

  • MM manages procurement of raw materials and inventory management.

  • SD manages sales orders and customer data.

A Senior SAP Ppqm Consultant was asked
Q. What is a BOM group?
Ans. 

BOM group is a classification of BOMs based on their usage and characteristics.

  • BOM group is used to group similar BOMs together.

  • It helps in managing and maintaining BOMs efficiently.

  • BOM group can be used for planning, costing, and production purposes.

  • Examples of BOM groups are engineering BOM, production BOM, sales BOM, etc.

Are these interview questions helpful?
A Senior SAP Ppqm Consultant was asked
Q. What are the control parameters of MRP?
Ans. 

Control parameters of MRP include lot size, safety stock, reorder point, and planning horizon.

  • Lot size determines the quantity of material to be produced or procured in one go.

  • Safety stock is the buffer stock maintained to meet unexpected demand or supply chain disruptions.

  • Reorder point is the inventory level at which a new order is triggered.

  • Planning horizon is the time period for which MRP is planned.

A Senior SAP Ppqm Consultant was asked
Q. What are scheduling parameters?
Ans. 

Scheduling parameter is a setting that determines the timing and frequency of a process or task.

  • Scheduling parameters are used in SAP PP to control the production process.

  • They can be used to set the start and end dates of a production order.

  • They can also be used to determine the frequency of a recurring task, such as a quality inspection.

  • Examples of scheduling parameters include start date, end date, lead time, an...

A Senior SAP Ppqm Consultant was asked
Q. What is the organizational structure of SAP PP?
Ans. 

The org structure of SAP PP includes plant, storage location, work center, routing, and production version.

  • Plant is the highest level in the org structure

  • Storage location is a sub-level of plant

  • Work center is a sub-level of storage location

  • Routing is a sub-level of work center

  • Production version is a sub-level of routing

Neovatic Technologies Senior SAP Ppqm Consultant Interview Experiences

1 interview found

Interview Questionnaire 

18 Questions

  • Q1. What is the org structure of sap pp.
  • Ans. 

    The org structure of SAP PP includes plant, storage location, work center, routing, and production version.

    • Plant is the highest level in the org structure

    • Storage location is a sub-level of plant

    • Work center is a sub-level of storage location

    • Routing is a sub-level of work center

    • Production version is a sub-level of routing

  • Answered by AI
  • Q2. What is mrp
  • Ans. 

    MRP stands for Material Requirements Planning, a system used to plan and control inventory levels and production schedules.

    • MRP helps in determining the quantity and timing of raw materials required for production.

    • It considers factors like lead time, demand, and inventory levels to create a production plan.

    • MRP is a key component of SAP PP module and helps in optimizing production processes.

    • It helps in reducing inventory...

  • Answered by AI
  • Q3. What is sop
  • Ans. 

    SOP stands for Standard Operating Procedure, which is a documented procedure that outlines steps to be followed in a specific process.

    • SOPs are used to ensure consistency and quality in processes

    • They are often used in industries such as manufacturing, healthcare, and food service

    • SOPs can include step-by-step instructions, safety precautions, and quality control measures

    • Examples of SOPs include a cleaning procedure for a...

  • Answered by AI
  • Q4. What is scheduling parameter
  • Ans. 

    Scheduling parameter is a setting that determines the timing and frequency of a process or task.

    • Scheduling parameters are used in SAP PP to control the production process.

    • They can be used to set the start and end dates of a production order.

    • They can also be used to determine the frequency of a recurring task, such as a quality inspection.

    • Examples of scheduling parameters include start date, end date, lead time, and cyc...

  • Answered by AI
  • Q5. What is backflushing
  • Ans. 

    Backflushing is a process in SAP PP/QM where the system automatically issues materials to a production order upon completion of the order.

    • Backflushing is used to reduce manual data entry and improve efficiency.

    • It is commonly used in industries such as manufacturing and assembly.

    • The system automatically calculates the quantity of materials used based on the bill of materials (BOM) and issues them to the production order...

  • Answered by AI
  • Q6. What are the control parameter of mrp
  • Ans. 

    Control parameters of MRP include lot size, safety stock, reorder point, and planning horizon.

    • Lot size determines the quantity of material to be produced or procured in one go.

    • Safety stock is the buffer stock maintained to meet unexpected demand or supply chain disruptions.

    • Reorder point is the inventory level at which a new order is triggered.

    • Planning horizon is the time period for which MRP is planned.

  • Answered by AI
  • Q7. What is the difference between repetitive and discrete
  • Ans. 

    Repetitive and discrete are two types of manufacturing processes in SAP PP module.

    • Repetitive manufacturing is used for producing high volume, low variety products.

    • Discrete manufacturing is used for producing low volume, high variety products.

    • Repetitive manufacturing uses a production line with a fixed sequence of operations.

    • Discrete manufacturing uses a bill of materials (BOM) to define the components needed for each p...

  • Answered by AI
  • Q8. What bom group
  • Ans. 

    BOM group is a classification of BOMs based on their usage and characteristics.

    • BOM group is used to group similar BOMs together.

    • It helps in managing and maintaining BOMs efficiently.

    • BOM group can be used for planning, costing, and production purposes.

    • Examples of BOM groups are engineering BOM, production BOM, sales BOM, etc.

  • Answered by AI
  • Q9. What is bom status
  • Ans. 

    BOM status refers to the current state of a Bill of Materials in a manufacturing process.

    • BOM status indicates whether a BOM is active or inactive.

    • It can also indicate whether a BOM is released for production or still in development.

    • BOM status can affect production planning and inventory management.

    • Examples of BOM status include 'released', 'obsolete', 'under development', and 'inactive'.

  • Answered by AI
  • Q10. What is group and group counter
  • Ans. 

    Group and group counter are used in SAP PP to group similar materials and operations.

    • Group is a classification of materials or operations based on common characteristics.

    • Group counter is a numerical identifier assigned to each group.

    • Groups can be used for planning, scheduling, and reporting purposes.

    • For example, materials with similar properties can be grouped together for easier management.

    • Similarly, operations with s...

  • Answered by AI
  • Q11. What is the difference between pld. ord and prd. ord.
  • Ans. 

    PLD. ORD refers to planned order while PRD. ORD refers to production order.

    • PLD. ORD is a tentative order created to meet the demand while PRD. ORD is a confirmed order to produce the required quantity.

    • PLD. ORD is created in the planning stage while PRD. ORD is created in the execution stage.

    • PLD. ORD does not have any material reservation while PRD. ORD has material reservation.

    • PLD. ORD can be converted to PRD. ORD afte...

  • Answered by AI
  • Q12. What is bom usage
  • Ans. 

    BOM usage is a classification of how a Bill of Materials (BOM) is used in a production process.

    • BOM usage determines the purpose of a BOM in a production process.

    • It can be used for production, costing, or engineering purposes.

    • Examples of BOM usage include production BOM, costing BOM, and engineering BOM.

    • Production BOM is used for manufacturing finished goods, while costing BOM is used for calculating the cost of a produ...

  • Answered by AI
  • Q13. What is the integration between pp , mm ,sd ,fico and qm.
  • Ans. 

    Integration between PP, MM, SD, FICO, and QM in SAP.

    • PP creates production plan based on sales orders from SD and material availability from MM.

    • QM ensures quality control during production process and inspects finished products.

    • FICO manages financial aspects of production and sales.

    • MM manages procurement of raw materials and inventory management.

    • SD manages sales orders and customer data.

  • Answered by AI
  • Q14. What is mic
  • Ans. 

    MIC stands for Material Identification and Control.

    • MIC is a process in SAP PP/QM module that ensures the correct identification and control of materials used in production.

    • It involves assigning unique identification numbers to materials and tracking their usage throughout the production process.

    • MIC helps in maintaining quality standards and preventing errors or mix-ups in production.

    • It also helps in traceability and re...

  • Answered by AI
  • Q15. What is inspection plan
  • Ans. 

    An inspection plan is a document that outlines the steps and criteria for inspecting a product or process.

    • It includes information on the inspection characteristics, sampling procedures, and acceptance criteria.

    • Inspection plans are used in quality management to ensure that products meet the required standards.

    • They can be created for individual products or for a group of similar products.

    • Inspection plans can be created i...

  • Answered by AI
  • Q16. What is demand management
  • Ans. 

    Demand management is the process of forecasting, planning, and managing the demand for products or services.

    • It involves analyzing historical data and market trends to predict future demand

    • It helps in optimizing inventory levels and production schedules

    • It ensures that the right products are available at the right time and in the right quantity

    • It involves collaboration between sales, marketing, and production teams

    • Exampl...

  • Answered by AI
  • Q17. What is the difference between stock requirements list and mrp list
  • Ans. 

    Stock requirements list and MRP list are two different reports used in SAP PP module.

    • Stock requirements list shows the current stock levels and future requirements for a material.

    • MRP list shows the planned procurement proposals for a material based on the current stock levels and future requirements.

    • Stock requirements list is used for monitoring stock levels and planning production, while MRP list is used for procureme...

  • Answered by AI
  • Q18. What is milestone confirmation
  • Ans. 

    Milestone confirmation is a process of confirming the completion of a significant event or stage in a project or production process.

    • Milestones are predetermined checkpoints in a project or production process

    • Confirmation involves verifying that the milestone has been achieved

    • Milestone confirmation helps to track progress and identify potential delays

    • Examples of milestones in production process include completion of a sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - must practice all the t code with field with business process.

Skills evaluated in this interview

Top trending discussions

View All
Interview Tips & Stories
5d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Neovatic Technologies?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Mar 2021. There were 4 interview rounds.

Round 1 - Coding Test 

90 minute test on hacker rank consisting of 3 coding questions all of medium difficulty. Most candidates are required to solve more than 1 question.

Round 2 - Technical 

(3 Questions)

  • Q1. Questions on concepts of OOPS and Operating Systems.
  • Q2. Find least common ancestor of a binary tree.
  • Ans. 

    Find the lowest common ancestor of a binary tree.

    • Traverse the tree recursively from the root node.

    • If the current node is null or matches either of the given nodes, return the current node.

    • Recursively search for the nodes in the left and right subtrees.

    • If both nodes are found in different subtrees, return the current node.

    • If both nodes are found in the same subtree, continue the search in that subtree.

  • Answered by AI
  • Q3. Find first missing positive integer from an array for non-negative integers.
  • Ans. 

    Find first missing positive integer from an array of non-negative integers.

    • Create a hash set to store all positive integers in the array

    • Loop through the array and add all positive integers to the hash set

    • Loop through positive integers starting from 1 and return the first missing integer not in the hash set

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Design a parking lot
  • Ans. 

    Design a parking lot

    • Consider the size and capacity of the parking lot

    • Decide on the layout and organization of parking spaces

    • Implement a system to manage parking availability and reservations

    • Include features like ticketing, payment, and security

    • Consider scalability and future expansion

  • Answered by AI
Round 4 - Technical 

(2 Questions)

  • Q1. Given a grid which represents an ocean( For all index i,j if mat[i][j] = 1 is island and mat[i][j] = 0 means water). Find the island with largest area.
  • Ans. 

    Find the largest island area in a grid representing an ocean using DFS or BFS.

    • Use Depth-First Search (DFS) or Breadth-First Search (BFS) to explore the grid.

    • Mark visited cells to avoid counting them multiple times.

    • Count the size of each island during the traversal.

    • Example: For a grid [[1,0,0],[1,1,0],[0,0,1]], the largest island has area 3.

    • Keep track of the maximum area found during the exploration.

  • Answered by AI
  • Q2. Given list of strings group them into distinct anagrams.
  • Ans. 

    Group list of strings into distinct anagrams.

    • Create a hash table with sorted string as key and list of anagrams as value.

    • Iterate through the list of strings and add each string to its corresponding anagram list in the hash table.

    • Return the values of the hash table as a list of lists.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arcesium Senior Software Engineer interview:
  • Low Level Design
  • Object Oriented Programming
  • Data Structures
  • Algorithms
  • DBMS
Interview preparation tips for other job seekers - Focus on Data Structures & Algorithms and Low Level Designing. Some brushup of DBMS will also help.

Skills evaluated in this interview

Senior SAP Ppqm Consultant Interview Questions Asked at Other Companies

Q1. What is the difference between a stock requirements list and an M ... read more
Q2. What is the integration between PP, MM, SD, FICO, and QM?
Q3. What is the difference between repetitive and discrete manufactur ... read more
Q4. What is the difference between planned orders and production orde ... read more
Q5. What is the organizational structure of SAP PP?
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Nov 2024, where I was asked the following questions.

  • Q1. What is Go Module?
  • Ans. 

    Go Modules are a dependency management system for Go programming language, enabling versioning and isolation of packages.

    • Introduced in Go 1.11 to manage dependencies more effectively.

    • Allows developers to define module dependencies in a 'go.mod' file.

    • Supports semantic versioning, making it easier to manage package versions.

    • Modules can be versioned, allowing for reproducible builds.

    • Example: 'module example.com/my/module'...

  • Answered by AI
  • Q2. What is difference between Goroutine and Thread.
  • Ans. 

    Goroutines are lightweight, managed by Go runtime, while threads are OS-level, heavier, and managed by the OS.

    • Goroutines are cheaper in terms of memory and resources compared to threads.

    • Goroutines are multiplexed onto a smaller number of OS threads, allowing for efficient concurrency.

    • Creating a goroutine is as simple as using the 'go' keyword, e.g., 'go myFunction()'.

    • Threads require more overhead for creation and manag...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jun 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Coding Test 

C++ coding question with multiple choice output and 1 code to write.

Round 3 - Technical 

(1 Question)

  • Q1. Data structure, virtual pointer, oops concept
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion and basic bavkground check.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Coding Test 

Javascript basic question was asked

Round 3 - One-on-one 

(2 Questions)

  • Q1. Email regex, angular framework
  • Q2. That all the question asked
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
No response

I applied via Company Website and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Coding Test 

1 hour interview for data structure coding

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Describe yourself
  • Ans. 

    I am a results-driven consultant with a passion for problem-solving and a strong background in data analysis and strategic planning.

    • Strong analytical skills: I have successfully led data-driven projects that improved operational efficiency by 20%.

    • Excellent communication: I have presented complex findings to stakeholders, ensuring clarity and actionable insights.

    • Team player: Collaborated with cross-functional teams to d...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What do you know about Sales?
  • Ans. 

    Sales involves the process of selling products or services, focusing on customer needs and relationship building.

    • Sales is about understanding customer needs and providing solutions.

    • Effective communication is key; for example, active listening helps tailor pitches.

    • Building relationships fosters trust, leading to repeat business.

    • Sales strategies can include direct selling, online marketing, and networking.

    • Data analysis h...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. It was a Situational Sale Question.
Are these interview questions helpful?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about your self?

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview session was easy

I appeared for an interview in Jan 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Explain about yourself
  • Q2. Daily activity in current job role

Interview Preparation Tips

Interview preparation tips for other job seekers - Cool and calm is very important in interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. The patient suffering from heart disease which kind of treatment we should follow.
  • Q2. What test are done to check for cancer?
  • Q3. The patient suffered with skin disease which kind of doctor we should consult.

Neovatic Technologies Interview FAQs

What are the top questions asked in Neovatic Technologies Senior SAP Ppqm Consultant interview?

Some of the top questions asked at the Neovatic Technologies Senior SAP Ppqm Consultant interview -

  1. what is the difference between stock requirements list and mrp li...read more
  2. what is the integration between pp , mm ,sd ,fico and ...read more
  3. what is the difference between repetitive and discre...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

CMS IT Services Interview Questions
3.1
 • 146 Interviews
iMerit Interview Questions
3.3
 • 108 Interviews
Arcesium Interview Questions
3.5
 • 85 Interviews
QualiZeal Interview Questions
4.2
 • 59 Interviews
Mavenir Systems Interview Questions
3.4
 • 58 Interviews
DotPe Interview Questions
3.1
 • 42 Interviews
Junglee Games Interview Questions
3.2
 • 36 Interviews
View all

Neovatic Technologies Senior SAP Ppqm Consultant Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
SAP MM Consultant
27 salaries
unlock blur

₹1.5 L/yr - ₹10.2 L/yr

Associate Consultant
24 salaries
unlock blur

₹2.5 L/yr - ₹6.2 L/yr

SAP SD Consultant
19 salaries
unlock blur

₹7.5 L/yr - ₹14 L/yr

SAP Abap Consultant
18 salaries
unlock blur

₹3 L/yr - ₹12.6 L/yr

SAP Fico Consultant
16 salaries
unlock blur

₹6.2 L/yr - ₹22.7 L/yr

Explore more salaries
Compare Neovatic Technologies with

CMS IT Services

3.1
Compare

iMerit

3.3
Compare

Quantiphi Analytics Solutions Private Limited

3.2
Compare

PrimEra Medical Technologies

3.5
Compare
write
Share an Interview