Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Padmini VNA Mechatronics Team. If you also belong to the team, you can get access from here

Padmini VNA Mechatronics Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Padmini VNA Mechatronics Project Manager-Production/Manufacturing/Maintenance Interview Questions and Answers

Updated 12 Oct 2020

Padmini VNA Mechatronics Project Manager-Production/Manufacturing/Maintenance Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed in Apr 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Whose Short timely highest growth in industry
  • Ans. 

    The highest growth in industry often comes from innovative companies that adapt quickly to market demands.

    • Companies like Tesla have rapidly grown by revolutionizing the electric vehicle market.

    • Amazon's expansion into various sectors showcases adaptability and timely growth.

    • Tech startups often experience short-term growth by leveraging emerging technologies, like AI and blockchain.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Without hesitation share your answer

Top trending discussions

View All
Interview Hub
6d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Padmini VNA Mechatronics?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(7 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. What are your strengths and weaknesses?
  • Q7. Tell me about yourself.
Round 3 - Technical 

(2 Questions)

  • Q1. As per your current profile
  • Q2. Japanise Methodology like 4 M change, 5 S, IATF, OSASH, Safety, TPM, etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - know about FCC clutch india pvt. ltd, study about your resume well,
salary no bar for good condidate,
answer all questions honesty because they are collect all information from your given details.

Project Manager-Production/Manufacturing/Maintenance Interview Questions Asked at Other Companies

asked in Tata Motors
Q1. What is mean by production engineer and what actual define the pr ... read more
asked in Tata Motors
Q2. Give the reason behind this production field,,why it is needed to ... read more
Q3. What is uph and upph,material management
asked in Iisd
Q4. What precautions should be taken while doing service work of heav ... read more
asked in Battrixx
Q5. What issues might we face during the battery warranty period?

I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding subject related
  • Q2. Electronics components testing

Interview Preparation Tips

Interview preparation tips for other job seekers - Just keep focus on resume ,all the questions will be ask from CV
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Hr after technical after plant head & president
Round 3 - Technical 

(1 Question)

  • Q1. Process & experience relative question

Interview Preparation Tips

Interview preparation tips for other job seekers - Designation & other question &salary & self introduction
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview in Aug 2024.

Round 1 - Interview 

(2 Questions)

  • Q1. Any work related
  • Q2. Family background
  • Ans. 

    I come from a close-knit family that values education, hard work, and community involvement.

    • My parents are both educators, which instilled a love for learning in me from a young age.

    • I have two siblings; we often collaborate on projects, showcasing teamwork and support.

    • Family gatherings are frequent, emphasizing our strong bonds and shared values.

    • My parents volunteered in local charities, teaching us the importance of g...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What are Iatf clauses
  • Q2. Insert terminology
  • Q3. Mcodes g codes of cnc
  • Ans. 

    M codes and G codes are commands used in CNC machines to control various functions and operations.

    • M codes are used for miscellaneous functions like stopping the machine or changing tools.

    • G codes are used for specific movements and operations like cutting, drilling, or milling.

    • Examples of M codes: M00 (program stop), M06 (tool change), M30 (end of program)

    • Examples of G codes: G00 (rapid positioning), G01 (linear interpo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thorough reading of cv and last experience rej,cost,rew data
Be interview-ready. Browse the most asked HR questions.
illustration image

Assistant Manager Interview Questions & Answers

Knorr-Bremse user image ROHIT MAHENDRA BHOSALE

posted on 13 Jul 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview before Jul 2024, where I was asked the following questions.

  • Q1. Which tools or method will be used for project escalation and delay
  • Ans. 

    Effective tools for project escalation include communication platforms, project management software, and structured reporting methods.

    • Utilize project management software like Asana or Trello to track progress and identify delays.

    • Implement regular status meetings to discuss project timelines and address issues promptly.

    • Use escalation matrices to define clear pathways for raising concerns to higher management.

    • Leverage co...

  • Answered by AI
  • Q2. All questions were situations based
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. 1)HPDC process calculation. 2)What is 5S . 3)Kaizen implementation 4) How to reduce process Rejection 5) Plan Vs Actual 6)
  • Ans. 

    The question includes topics such as HPDC process calculation, 5S, Kaizen implementation, reducing process rejection, and plan vs actual.

    • HPDC process calculation involves determining the parameters for high-pressure die casting.

    • 5S is a methodology for workplace organization and standardization.

    • Kaizen is a continuous improvement approach that focuses on small incremental changes.

    • To reduce process rejection, one can impl...

  • Answered by AI
  • Q2. 1)Non fill check water leakage 2) metal temp

Interview Questionnaire 

4 Questions

  • Q1. What is oee.
  • Q2. What is production planning in shopfloar.
  • Q3. What is productivity.
  • Q4. What is 5s.
Round 1 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Ans. 

    I come from a close-knit family that values education and hard work, which has greatly influenced my career path in engineering.

    • My father is an engineer, which inspired my interest in the field from a young age.

    • My mother is a teacher, emphasizing the importance of education and critical thinking.

    • I have a younger sister who is pursuing her degree in environmental science, showcasing our family's commitment to academic e...

  • Answered by AI
  • Q3. Share details of your previous job.
  • Q4. Why are you looking for a change?
  • Q5. Tell me about yourself.
  • Q6. What are your strengths and weaknesses?
Round 3 - Technical 

(2 Questions)

  • Q1. Where is the rejection cantrol of the moulding machine
  • Ans. 

    The rejection control of the moulding machine is typically located on the control panel.

    • The rejection control is usually a button or switch on the control panel.

    • It may be labeled as 'reject' or 'scrap'.

    • The control allows the operator to manually reject any defective parts produced by the machine.

    • Some machines may also have an automatic rejection system that is programmed to detect and remove defective parts.

    • The locatio...

  • Answered by AI
  • Q2. Where is the injection moulding machine and problem solving
  • Ans. 

    Injection moulding machine is located in the production area and problem solving involves identifying and resolving issues with the machine and the moulds.

    • Injection moulding machine is typically located in the production area

    • Problem solving involves identifying and resolving issues with the machine and the moulds

    • Common problems include issues with the temperature, pressure, and material flow

    • Solutions may involve adjust...

  • Answered by AI

Tell us how to improve this page.

Assistant Manager
119 salaries
unlock blur

₹6.3 L/yr - ₹12.8 L/yr

Deputy Manager
84 salaries
unlock blur

₹10.5 L/yr - ₹18 L/yr

Senior Engineer
83 salaries
unlock blur

₹4.5 L/yr - ₹9.2 L/yr

Junior Engineer
59 salaries
unlock blur

₹2.1 L/yr - ₹4.1 L/yr

Design Engineer
55 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Explore more salaries
Compare Padmini VNA Mechatronics with

Knorr-Bremse

3.6
Compare

Greaves Cotton

4.0
Compare

Fiem Industries

3.6
Compare

Goodyear

3.6
Compare
write
Share an Interview