Filter interviews by
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
Various tools are used in production such as project management software, scheduling tools, quality control software, etc.
Project management software (e.g. Trello, Asana)
Scheduling tools (e.g. Microsoft Project)
Quality control software (e.g. Six Sigma tools)
Inventory management software (e.g. SAP)
Collaboration tools (e.g. Slack)
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
I previously worked in the entertainment industry, focusing on film and television production, where I honed my skills in project management.
Managed a team of 20 during the production of a feature film, ensuring timely delivery and adherence to budget.
Collaborated with directors and writers to develop scripts, enhancing storytelling through effective production techniques.
Oversaw post-production processes, including ed...
Yes, I would consider joining the company even if the payment is less as per my convenience.
I believe that the overall opportunity and growth potential offered by the company is more important than the immediate payment.
I would evaluate the other benefits and perks provided by the company, such as flexible working hours, work-life balance, career advancement opportunities, and learning and development programs.
If the c...
Top trending discussions
Distillation is a process of separating components of a liquid mixture based on their different boiling points.
Distillation involves heating a liquid mixture to vaporize the more volatile components.
The vapor is then cooled and condensed back into a liquid, resulting in the separation of the components.
The component with the lower boiling point will vaporize first and can be collected separately.
Common examples of dist...
There are various types of distillation, such as fractional distillation, simple distillation, and vacuum distillation.
Fractional distillation is used to separate mixtures with close boiling points, such as in the separation of different components of crude oil.
Simple distillation is used to separate liquids with significantly different boiling points, such as in the purification of water.
Vacuum distillation is used to...
The type of pump and valve depends on the specific production process and requirements.
The selection of pump and valve depends on factors such as the fluid being handled, flow rate, pressure, temperature, and material compatibility.
Common types of pumps include centrifugal pumps, positive displacement pumps, and diaphragm pumps.
Common types of valves include ball valves, gate valves, globe valves, and butterfly valves.
...
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
The future provision in the organization focuses on innovation, sustainability, and workforce development to enhance productivity.
Investing in advanced technologies like AI and automation to streamline production processes.
Implementing sustainable practices, such as reducing waste and energy consumption, to meet environmental goals.
Enhancing workforce skills through continuous training programs to adapt to new technolo...
I applied via Naukri.com and was interviewed in Jun 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Jul 2021. There was 1 interview round.
It is important to check all RM, equipment, and utility before batch charging to ensure quality and safety.
Inspect all raw materials for quality and quantity
Check equipment for cleanliness and proper functioning
Ensure all utilities (water, electricity, etc.) are available and functioning properly
Verify that all safety measures are in place
Perform necessary calibrations and validations
Document all checks and inspections
I applied via Walk-in and was interviewed before Sep 2021. There were 3 interview rounds.
Current package related
Skills knowledge of unit operations and Pharma basic guidelines
I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.
The previous company had a well-defined manufacturing process with specific parameters.
The manufacturing process at the previous company followed a step-by-step approach.
Each step had defined parameters to ensure quality and consistency.
For example, in the production of a car, the process included stages like welding, painting, and assembly.
The parameters for welding included temperature, pressure, and duration.
Similar...
based on 2 interview experiences
Difficulty level
Duration
based on 1 review
Rating in categories
Lab Assistant
5
salaries
| ₹1.8 L/yr - ₹3.4 L/yr |
Assistant Manager
4
salaries
| ₹6.8 L/yr - ₹12 L/yr |
Production Manager
4
salaries
| ₹3.6 L/yr - ₹10.9 L/yr |
Supervisor
4
salaries
| ₹3.2 L/yr - ₹3.6 L/yr |
Senior Supervisor
4
salaries
| ₹5.6 L/yr - ₹6.5 L/yr |
Tata Motors
Tata Steel
Asian Paints
Maruti Suzuki