KEC International Interview Questions and Answers

Updated 5 Aug 2025
Popular Designations

232 Interview questions

An Assistant Manager Safety was asked 2w ago
Q. What are the major hazards associated with high-rise building construction sites?
Ans. 

High-rise construction sites face hazards like falls, equipment accidents, and structural failures, requiring strict safety measures.

  • Falls from heights: Workers may fall from scaffolding or unprotected edges, leading to serious injuries or fatalities.

  • Equipment accidents: Cranes and hoists can malfunction or be operated unsafely, posing risks to workers and bystanders.

  • Structural failures: Inadequate support or poor...

View all Assistant Manager Safety interview questions
An Assistant Manager Safety was asked 2w ago
Q. What is an EHS Management system?
Ans. 

An EHS Management System ensures compliance with environmental, health, and safety regulations while promoting workplace safety.

  • Integrates policies and procedures for environmental protection, health, and safety.

  • Facilitates risk assessments to identify and mitigate hazards, e.g., conducting regular safety audits.

  • Promotes employee training programs on safety practices, such as fire drills and emergency response.

  • Tra...

View all Assistant Manager Safety interview questions
A Site Engineer was asked 4w ago
Q. What are the transport safety measures for bringing materials from the storage location to the site?
Ans. 

Transport safety measures ensure safe delivery of materials to construction sites, minimizing risks and ensuring compliance.

  • Use of appropriate vehicles: Ensure vehicles are suitable for the type of materials being transported, e.g., flatbed trucks for heavy equipment.

  • Load securing: Materials should be properly secured using straps, tarps, or nets to prevent shifting during transit.

  • Route planning: Identify the safe...

View all Site Engineer interview questions
A Site Engineer was asked 4w ago
Q. What is a row?
Ans. 

A row is a linear arrangement of items, often used in data organization, construction, and various fields.

  • In construction, a row can refer to a line of bricks or blocks laid in a single horizontal layer.

  • In data tables, a row represents a single record that contains multiple fields of information.

  • In agriculture, a row may refer to a line of crops planted in a straight line for efficient growth and harvesting.

View all Site Engineer interview questions
A Site Engineer was asked 4w ago
Q. How should tower erection and stringing work be conducted for river crossings?
Ans. 

Tower erection and stringing for river crossings require careful planning, safety measures, and environmental considerations.

  • Conduct a thorough site assessment to identify environmental and safety concerns.

  • Use specialized equipment like cranes and helicopters for lifting and positioning towers.

  • Implement safety protocols to protect workers and the surrounding ecosystem.

  • Consider using temporary supports or scaffoldi...

View all Site Engineer interview questions
A Site Engineer was asked 4w ago
Q. What is the process of stringing?
Ans. 

Stringing is the process of installing overhead power lines between poles or towers, ensuring proper tension and alignment.

  • Involves using a stringing machine to pull conductors.

  • Requires careful planning to avoid obstacles and ensure safety.

  • Stringing can be done using various methods, such as direct pull or using a pilot line.

  • Example: In a direct pull method, the conductor is pulled directly from the reel to the po...

View all Site Engineer interview questions

KEC International HR Interview Questions

45 questions and answers

Q. How can I handle a situation where a local person influences my work for so ... read more
Q. How can effective teamwork be achieved through work planning and problem-so ... read more
Q. How many years of EPC experience do you have?
A Site Engineer was asked 4w ago
Q. What are the procedures and safety measures related to electricity shutdowns for LT lines, 11kv, 33kv and 66kv systems?
Ans. 

Electricity shutdown procedures ensure safety during maintenance of LT and HT lines, minimizing risks to personnel and equipment.

  • Notify all affected personnel and stakeholders about the planned shutdown in advance.

  • Conduct a risk assessment to identify potential hazards associated with the shutdown.

  • Isolate the section of the line by switching off the circuit breakers and using lockout/tagout (LOTO) procedures.

  • Use a...

View all Site Engineer interview questions
Are these interview questions helpful?
A Site Engineer was asked 4w ago
Q. What is the procedure for joining conductor wires?
Ans. 

The conductor wire joint procedure involves connecting electrical wires securely and safely to ensure efficient power transmission.

  • 1. Prepare the wires by stripping insulation to expose the conductor.

  • 2. Align the wires to be joined, ensuring they are clean and free of corrosion.

  • 3. Choose the appropriate joint method: twist, solder, or crimp.

  • 4. For a twist joint, twist the exposed conductors together tightly.

  • 5. For...

View all Site Engineer interview questions
A Site Engineer was asked 4w ago
Q. What are the procedures and considerations involved in the tower erection process?
Ans. 

Tower erection involves careful planning, safety measures, and precise execution to ensure structural integrity and worker safety.

  • Site Preparation: Ensure the site is cleared and leveled, with proper access for equipment.

  • Foundation: Construct a strong foundation to support the tower's weight and height, using concrete or steel.

  • Equipment: Use cranes or derricks for lifting sections; ensure they are rated for the lo...

View all Site Engineer interview questions
A Planning Manager was asked 1mo ago
Q. What is an achievement in your career that is not mentioned in your CV?
Ans. 

I successfully led a cross-functional team to streamline operations, resulting in a 20% increase in efficiency and significant cost savings.

  • Implemented a new project management tool that improved team collaboration and tracking.

  • Conducted training sessions for staff, enhancing their skills and productivity.

  • Developed a strategic plan that aligned departmental goals with company objectives, leading to a 15% increase ...

View all Planning Manager interview questions

KEC International Interview Experiences

361 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 11 Jul 2025

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025, where I was asked the following questions.

  • Q1. What are the procedures and considerations involved in the tower erection process?
  • Ans. 

    Tower erection involves careful planning, safety measures, and precise execution to ensure structural integrity and worker safety.

    • Site Preparation: Ensure the site is cleared and leveled, with proper access for equipment.

    • Foundation: Construct a strong foundation to support the tower's weight and height, using concrete or steel.

    • Equipment: Use cranes or derricks for lifting sections; ensure they are rated for the load.

    • Sa...

  • Answered by AI
  • Q2. What is the process of stringing?
  • Ans. 

    Stringing is the process of installing overhead power lines between poles or towers, ensuring proper tension and alignment.

    • Involves using a stringing machine to pull conductors.

    • Requires careful planning to avoid obstacles and ensure safety.

    • Stringing can be done using various methods, such as direct pull or using a pilot line.

    • Example: In a direct pull method, the conductor is pulled directly from the reel to the pole.

    • Sa...

  • Answered by AI
  • Q3. What types of conductor wires are there, and what are their names, sizes, applications, and carrying capacities?
  • Ans. 

    Various conductor wires serve different applications, sizes, and carrying capacities in electrical systems.

    • 1. Copper Wires: Excellent conductivity, used in residential wiring. Common sizes: 14 AWG (15A), 12 AWG (20A).

    • 2. Aluminum Wires: Lightweight and cost-effective, used in overhead power lines. Common sizes: 6 AWG (55A), 2 AWG (95A).

    • 3. Stranded Wires: Composed of multiple small wires, flexible for applications like a...

  • Answered by AI
  • Q4. How can effective teamwork be achieved through work planning and problem-solving in management?
  • Ans. 

    Effective teamwork in management is achieved through strategic planning and collaborative problem-solving.

    • Establish clear goals: Define project objectives to align team efforts, e.g., completing a construction phase by a specific date.

    • Encourage open communication: Foster an environment where team members can share ideas and concerns, such as regular team meetings.

    • Utilize collaborative tools: Implement project managemen...

  • Answered by AI
  • Q5. What are the names of the tools used in transmission line work, and what are their specific uses?
  • Ans. 

    Transmission line work requires various tools for installation, maintenance, and safety, ensuring efficient power delivery.

    • 1. **Cable Puller**: Used to pull heavy cables through conduits or over long distances.

    • 2. **Tension Meter**: Measures the tension in the transmission line to ensure proper sag and safety.

    • 3. **Insulation Resistance Tester**: Checks the insulation resistance of cables to prevent electrical failures.

    • 4...

  • Answered by AI
  • Q6. What are the transport safety measures for bringing materials from the storage location to the site?
  • Ans. 

    Transport safety measures ensure safe delivery of materials to construction sites, minimizing risks and ensuring compliance.

    • Use of appropriate vehicles: Ensure vehicles are suitable for the type of materials being transported, e.g., flatbed trucks for heavy equipment.

    • Load securing: Materials should be properly secured using straps, tarps, or nets to prevent shifting during transit.

    • Route planning: Identify the safest an...

  • Answered by AI
  • Q7. How can I handle a situation where a local person influences my work for some reason?
  • Ans. 

    Addressing local influence requires diplomacy, clear communication, and adherence to professional standards.

    • Establish clear communication: Engage with the local person to understand their perspective and concerns.

    • Set boundaries: Politely assert your professional role and responsibilities to maintain project integrity.

    • Seek collaboration: Find common ground and explore ways to incorporate local insights without compromis...

  • Answered by AI
  • Q8. What is a row?
  • Ans. 

    A row is a linear arrangement of items, often used in data organization, construction, and various fields.

    • In construction, a row can refer to a line of bricks or blocks laid in a single horizontal layer.

    • In data tables, a row represents a single record that contains multiple fields of information.

    • In agriculture, a row may refer to a line of crops planted in a straight line for efficient growth and harvesting.

  • Answered by AI
  • Q9. What are the procedures and safety measures related to electricity shutdowns for LT lines, 11kv, 33kv and 66kv systems?
  • Ans. 

    Electricity shutdown procedures ensure safety during maintenance of LT and HT lines, minimizing risks to personnel and equipment.

    • Notify all affected personnel and stakeholders about the planned shutdown in advance.

    • Conduct a risk assessment to identify potential hazards associated with the shutdown.

    • Isolate the section of the line by switching off the circuit breakers and using lockout/tagout (LOTO) procedures.

    • Use approp...

  • Answered by AI
  • Q10. What are the details regarding overhead power lines, such as those for railway crossings at 110 kV, 132 kV, 220 kV, and 400 kV?
  • Ans. 

    Overhead power lines for railway crossings vary by voltage, affecting design, safety, and operational protocols.

    • 110 kV lines typically use single or double circuit configurations for regional distribution.

    • 132 kV lines are often used for sub-transmission, connecting substations to distribution networks.

    • 220 kV lines are common for long-distance transmission, requiring robust structures to support the weight.

    • 400 kV lines ...

  • Answered by AI
  • Q11. How should tower erection and stringing work be conducted for river crossings?
  • Ans. 

    Tower erection and stringing for river crossings require careful planning, safety measures, and environmental considerations.

    • Conduct a thorough site assessment to identify environmental and safety concerns.

    • Use specialized equipment like cranes and helicopters for lifting and positioning towers.

    • Implement safety protocols to protect workers and the surrounding ecosystem.

    • Consider using temporary supports or scaffolding to...

  • Answered by AI
  • Q12. What is the conductor wire joint procedure ?
  • Ans. 

    The conductor wire joint procedure involves connecting electrical wires securely and safely to ensure efficient power transmission.

    • 1. Prepare the wires by stripping insulation to expose the conductor.

    • 2. Align the wires to be joined, ensuring they are clean and free of corrosion.

    • 3. Choose the appropriate joint method: twist, solder, or crimp.

    • 4. For a twist joint, twist the exposed conductors together tightly.

    • 5. For sold...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - KEC is part of the RPG Group, one of the most respected business groups in India. The company has a strong global presence – it has operations in 100+ countries. KEC provides training programs, leadership development modules, safety training to grow the technical and managerial skills of its employees. Professionalism, safety, innovation and performance-driven culture are promoted. KEC focuses heavily on employee safety & well-being, especially in field jobs.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Transmission Tower Detailing
  • Q2. Shop Drawing Bil of Meterial Tower Devlop & Re Devlop
  • Q3. Raice Chimney Drawing
  • Q4. Stub Template Prop Drawing
  • Q5. Structural Develop and Redevelop, Marking Erection Drawing , Bolts Nuts Grip Checking and Counting, Bill of Material , Shop Drawing Cad & Dxf and Shop Drawing Checking , Prop Drawing, Raise Chimney Transm...

Interview Preparation Tips

Interview preparation tips for other job seekers - Transmission Tower Detailing Shop Drawing Bill Of Meterial Tower Devlop & Re Devlop, RC, Prop
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-

I appeared for an interview in Jan 2025.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Civil Engineer tag can be obtained from the company.
  • Ans. Yes, of course you can get the tag if are skilled at the work.
  • Answered Anonymously
  • Q2. Is there a way to go from Foreman to Engineer?
  • Ans. 

    Transitioning from Foreman to Engineer involves gaining education, experience, and skills in engineering principles and practices.

    • Pursue a degree in civil engineering or a related field to gain foundational knowledge.

    • Gain relevant work experience by collaborating with engineers on projects.

    • Obtain certifications such as PMP or LEED to enhance your qualifications.

    • Develop technical skills in software like AutoCAD or Revit...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - A good platform for your future.

Interview Questions & Answers

user image Anonymous

posted on 10 Dec 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Job specific/ roles and responsibilities
  • Q2. Legal requirements
Round 2 - HR 

(2 Questions)

  • Q1. Why you want to switch
  • Q2. Salary expectation
  • Ans. 

    I am looking for a competitive salary that reflects my skills and experience in EHS engineering, ideally in the range of INR 8-12 lakhs per annum.

    • Research industry standards: Based on my research, EHS Engineers in Pune typically earn between INR 8-12 lakhs per annum.

    • Consider my experience: With over 5 years in EHS roles, I bring valuable expertise that justifies a higher salary.

    • Value addition: My skills in risk assessm...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge of core safety requirements and it's implementation procedure
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Jun 2025, where I was asked the following questions.

  • Q1. What is EHS Management system ?
  • Ans. 

    An EHS Management System ensures compliance with environmental, health, and safety regulations while promoting workplace safety.

    • Integrates policies and procedures for environmental protection, health, and safety.

    • Facilitates risk assessments to identify and mitigate hazards, e.g., conducting regular safety audits.

    • Promotes employee training programs on safety practices, such as fire drills and emergency response.

    • Tracks i...

  • Answered by AI
  • Q2. Major hazards associated in high rise building construction sites?
  • Ans. 

    High-rise construction sites face hazards like falls, equipment accidents, and structural failures, requiring strict safety measures.

    • Falls from heights: Workers may fall from scaffolding or unprotected edges, leading to serious injuries or fatalities.

    • Equipment accidents: Cranes and hoists can malfunction or be operated unsafely, posing risks to workers and bystanders.

    • Structural failures: Inadequate support or poor cons...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You can join KEC INTERNATIONAL if want a good culture, welfare and good salary on time.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(2 Questions)

  • Q1. Site work related like foundation
  • Q2. Eraction and stringing
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. PEB structure lifting schedule and process
  • Ans. 

    Lifting a Pre-Engineered Building (PEB) involves careful planning, scheduling, and execution to ensure safety and efficiency.

    • 1. Pre-lift planning: Assess site conditions, load capacities, and equipment availability.

    • 2. Schedule coordination: Align lifting activities with other construction tasks to minimize delays.

    • 3. Equipment selection: Choose appropriate cranes and rigging based on load weight and height.

    • 4. Safety mea...

  • Answered by AI
  • Q2. Fabrication & erection
  • Q3. Lifting process
  • Q4. Before lifting of material prepare the erection plan
  • Q5. Pre TBT will be completed at site for safety related
  • Q6. TBT will be conducted with all representative staff and workers
  • Q7. Before lifting of material crane positioning should be checked
  • Ans. 

    Crane positioning is crucial for safe and efficient material lifting, ensuring stability and preventing accidents.

    • Check the ground conditions: Ensure the surface is stable and can support the crane's weight.

    • Verify the load path: Ensure there are no obstacles in the lifting path, such as overhead power lines.

    • Assess the crane's reach: Confirm that the crane can safely reach the load without exceeding its operational limi...

  • Answered by AI
  • Q8. Then start the lifting of material
  • Q9. Before lifting of material all lifting tools and tackle should be checked
  • Ans. 

    Lifting tools and tackles must be inspected for safety and functionality to prevent accidents during material handling.

    • Check for visible damage or wear on lifting equipment, such as frayed ropes or cracked hooks.

    • Ensure that the load capacity of the lifting tools is adequate for the materials being lifted.

    • Inspect the lifting mechanism, such as hoists or cranes, for proper operation and maintenance records.

    • Verify that sa...

  • Answered by AI
  • Q10. Material lifting should be slowly slowly lift and after that when material has been portioning and lock the material
  • Q11. After positioning of materials then released the crane and post TBT should be conducted at site and stop the work
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
No response

I appeared for an interview in Feb 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Ur best experience in line
  • Ans. 

    My best experience as a Wireman Technician involved troubleshooting complex electrical issues and successfully completing a major project.

    • Successfully diagnosed and repaired a faulty wiring system in a commercial building, improving safety and efficiency.

    • Led a team in installing a new electrical system for a large residential project, ensuring compliance with local codes.

    • Implemented preventive maintenance schedules tha...

  • Answered by AI
  • Q2. Why this works
  • Ans. 

    Understanding the principles behind electrical systems helps troubleshoot and maintain equipment effectively.

    • Electrical circuits operate on Ohm's Law, which states V=IR (Voltage = Current x Resistance).

    • Understanding AC vs. DC current is crucial; AC is used in homes, while DC is common in batteries.

    • Fuses and circuit breakers protect circuits from overloads by interrupting the flow of electricity.

    • Grounding is essential f...

  • Answered by AI

Sr. EHS Engineer Interview Questions & Answers

user image Arunabha Maity

posted on 12 Mar 2025

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. How to handle site at your level
  • Ans. 

    Effective site handling involves proactive risk management, compliance, and fostering a safety culture among all stakeholders.

    • Conduct regular site assessments to identify potential hazards and implement corrective actions.

    • Engage with site personnel through training sessions to promote awareness of EHS protocols.

    • Establish clear communication channels for reporting incidents or unsafe conditions, ensuring timely response...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your expectations

Utility Engineer Interview Questions & Answers

user image Virat Vishwa

posted on 6 Jun 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. Electrical related questions
  • Q2. About site execution and planning

Top trending discussions

View All
Interview Hub
4d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about KEC International?
Ask anonymously on communities.

KEC International Interview FAQs

How many rounds are there in KEC International interview?
KEC International interview process usually has 2-3 rounds. The most common rounds in the KEC International interview process are Technical, Resume Shortlist and HR.
How to prepare for KEC International interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEC International. The most common topics and skills that interviewers at KEC International expect are Project Management, Transmission Line, EHS, Substation and Auditing.
What are the top questions asked in KEC International interview?

Some of the top questions asked at the KEC International interview -

  1. 8. A critical deliverable which was to be delivered to the C-Suite is way behin...read more
  2. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide ...read more
  3. Which Advance excel used for inventory...read more
What are the most common questions asked in KEC International HR round?

The most common HR questions asked in KEC International interview are -

  1. Where do you see yourself in 5 yea...read more
  2. What are your strengths and weakness...read more
  3. Why are you looking for a chan...read more
How long is the KEC International interview process?

The duration of KEC International interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.3/5

based on 421 interview experiences

Difficulty level

Easy 23%
Moderate 64%
Hard 13%

Duration

Less than 2 weeks 63%
2-4 weeks 24%
4-6 weeks 4%
6-8 weeks 3%
More than 8 weeks 6%
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 846 Interviews
Tata Projects Interview Questions
4.2
 • 513 Interviews
Dilip Buildcon Interview Questions
3.9
 • 162 Interviews
G R Infraprojects Interview Questions
4.1
 • 148 Interviews
Power Mech Projects Interview Questions
3.8
 • 106 Interviews
AtkinsRealis Interview Questions
3.9
 • 95 Interviews
GMR Group Interview Questions
4.0
 • 93 Interviews
View all

KEC International Reviews and Ratings

based on 4.2k reviews

4.0/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.9

Salary

4.1

Job security

3.8

Company culture

3.3

Promotions

3.7

Work satisfaction

Explore 4.2k Reviews and Ratings
Electrical BIM Engineer

Mumbai

5-10 Yrs

Not Disclosed

Mechanical BIM Engineer

Mumbai

5-10 Yrs

Not Disclosed

Planning Manager

Saudi arabia

7-12 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
756 salaries
unlock blur

₹8.4 L/yr - ₹16.5 L/yr

Senior Engineer
557 salaries
unlock blur

₹5.8 L/yr - ₹14 L/yr

Manager
226 salaries
unlock blur

₹15.4 L/yr - ₹26 L/yr

Civil Engineer
224 salaries
unlock blur

₹3.5 L/yr - ₹8.7 L/yr

Safety Officer
213 salaries
unlock blur

₹2.5 L/yr - ₹7.2 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.2
Compare
write
Share an Interview