Filter interviews by
I appeared for an interview in Jul 2024.
HOD department Discussion work
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Referral and was interviewed in Jun 2023. There was 1 interview round.
Top trending discussions
I applied via Campus Placement and was interviewed before Nov 2020. There were 5 interview rounds.
HVDC stands for High Voltage Direct Current. It is a system used for transmitting high voltage electricity over long distances.
HVDC systems are used to transmit electricity over long distances with minimal losses.
They are more efficient than traditional AC systems for long-distance transmission.
HVDC systems use converters to convert AC power to DC power and vice versa.
Examples of HVDC systems include the Itaipu HVDC sy...
A rectifier is an electronic device that converts AC to DC.
Rectifiers are commonly used in power supplies to convert AC voltage to DC voltage.
They can be made using diodes or other semiconductor devices.
Rectifiers are essential for many electronic devices to function properly.
Examples of rectifiers include bridge rectifiers, half-wave rectifiers, and full-wave rectifiers.
I applied via Approached by Company and was interviewed before Apr 2021. There were 3 interview rounds.
The basic IEC standards in PV module design & type qualification are IEC 61215 and IEC 61730 for design qualification, and IEC 61215 and IEC 61730 for type qualification. The safety qualification standard is IEC 61730.
IEC 61215 is the standard for crystalline silicon terrestrial photovoltaic (PV) modules
IEC 61730 is the standard for safety qualification of PV modules
Design qualification ensures the module design meets ...
Solar backsheet layers provide protection and insulation for solar panels.
Solar backsheet layers are typically made of a combination of materials such as polyester, fluoropolymer, and ethylene-vinyl acetate (EVA).
The backsheet layers act as a barrier against moisture, UV radiation, and other environmental factors that can degrade the solar cells.
They also provide electrical insulation to prevent short circuits and ensu...
I applied via Referral and was interviewed in Sep 2020. There were 4 interview rounds.
posted on 14 May 2024
I applied via Walk-in and was interviewed in Apr 2024. There were 3 interview rounds.
Related previous company
Top problems with the product include slow loading times, frequent crashes, and lack of user-friendly interface.
Slow loading times can frustrate users and lead to decreased usage of the product.
Frequent crashes can result in loss of data and negative user experience.
Lack of user-friendly interface can make it difficult for users to navigate the product and find desired features.
based on 6 interview experiences
Difficulty level
Duration
based on 95 reviews
Rating in categories
Lead Engineer
24
salaries
| ₹4.4 L/yr - ₹8.9 L/yr |
Station Head
7
salaries
| ₹13.5 L/yr - ₹20.2 L/yr |
Associate
7
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Store Executive
7
salaries
| ₹4 L/yr - ₹5.5 L/yr |
Safety Officer
6
salaries
| ₹5.4 L/yr - ₹6.9 L/yr |
Sterlite Power
Doosan Power Systems
Inox Wind
Premier Energies