Production Engineer

1500+ Production Engineer Interview Questions and Answers

Updated 15 Aug 2025
search-icon
2d ago

Q. How do you detect faults in robots?

Ans.

To solve problems in robots and detect faults, various techniques can be used such as sensor monitoring, data analysis, and predictive maintenance.

  • Implement sensor monitoring to detect abnormal behavior or deviations in robot performance.

  • Collect and analyze data from sensors to identify patterns or anomalies that indicate faults.

  • Utilize predictive maintenance techniques to anticipate and prevent potential failures.

  • Implement fault detection algorithms or machine learning model...read more

Asked in Foxconn

6d ago

Q. If product A fails in the last stage, what is the root cause?

Ans.

The root cause of product A's failure in the last stage can be due to various factors.

  • The failure could be due to a problem in the manufacturing process.

  • It could be due to a defect in the raw materials used.

  • The failure could also be due to a design flaw in the product.

  • Human error during the production process could also be a cause.

  • Environmental factors such as temperature or humidity could also play a role.

Production Engineer Interview Questions and Answers for Freshers

illustration image

Q. Did you know about soldering and what is the criteria for soldering?

Ans.

Yes, soldering is a process of joining two or more metal components using a filler metal called solder.

  • Soldering is a common technique used in electronics and metalworking industries.

  • The criteria for soldering include proper cleaning of the surfaces to be soldered, applying flux to promote bonding, and heating the solder to its melting point.

  • The solder should flow smoothly and evenly to create a strong bond.

  • The solder joint should be visually inspected for any defects or irre...read more

6d ago

Q. What is the minimum value that can be measured by a vernier caliper?

Ans.

The minimum value that can be measured by a vernier caliper depends on the resolution of the caliper.

  • The resolution of a vernier caliper is typically 0.02 mm or 0.001 inch.

  • Therefore, the minimum value that can be measured is usually the resolution of the caliper.

  • For example, if the resolution is 0.02 mm, the minimum value that can be measured is 0.02 mm.

Are these interview questions helpful?
4d ago

Q. What is the difference between mass production and batch production?

Ans.

Mass production is continuous production of identical products while batch production is production of a specific quantity of a product.

  • Mass production involves high volume production with standardized products

  • Batch production involves producing a specific quantity of a product at a time

  • Mass production is more cost-effective due to economies of scale

  • Batch production allows for more flexibility in production and customization

  • Examples of mass production include assembly lines f...read more

1d ago

Q. What is 5S, and why is it required in the industry?

Ans.

5S is a workplace organization method that aims to improve efficiency and eliminate waste.

  • 5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.

  • It involves organizing the workplace, eliminating unnecessary items, and creating a clean and efficient environment.

  • Examples include labeling tools and equipment, creating designated storage areas, and implementing a cleaning schedule.

  • 5S helps to reduce errors, increase productivity, and improve safety in the workplace.

Production Engineer Jobs

IBM India Pvt. Limited logo
Production Engineer 2-5 years
IBM India Pvt. Limited
3.9
Bangalore / Bengaluru
Capgemini Technology Services India Limited logo
SAP PEO (Production Engineering and Operations) 4-9 years
Capgemini Technology Services India Limited
3.7
Bangalore / Bengaluru
Araymond India logo
Production Engineer 4-6 years
Araymond India
4.3
Oragadam
3d ago

Q. What are five values you measured recently?

Ans.

I measure safety, quality, productivity, efficiency, and cost-effectiveness.

  • Safety of workers and equipment

  • Quality of products

  • Productivity of the production line

  • Efficiency of processes

  • Cost-effectiveness of operations

Asked in Wakefit

6d ago

Q. If the company has all the necessary resources, but work is not being completed, what is your action plan to ensure work is done?

Ans.

I would analyze the situation and identify the root cause of the problem before taking any action.

  • Conduct a thorough analysis of the situation to identify the root cause of the problem

  • Communicate with the team to understand their perspective and challenges

  • Develop a plan of action to address the root cause and improve productivity

  • Implement the plan and monitor progress to ensure success

  • Provide regular updates to management on progress and any challenges faced

Share interview questions and help millions of jobseekers 🌟

man-with-laptop
6d ago

Q. How can you improve productivity?

Ans.

Productivity can be improved by optimizing processes, utilizing technology, and investing in employee training.

  • Identify and eliminate bottlenecks in production processes

  • Automate repetitive tasks using technology

  • Invest in employee training to improve skills and efficiency

  • Implement performance metrics to track progress and identify areas for improvement

Q. What is Value Stream Mapping (VSM), and how would you implement it in a press shop and weld shop?

Ans.

VSM stands for Value Stream Mapping. It is a lean management tool used to analyze and improve the flow of materials and information in a process.

  • VSM is used to identify waste and bottlenecks in a process

  • It helps in visualizing the current state and designing the future state of the process

  • In a press shop, VSM can be implemented by mapping the flow of materials from raw material to finished product, identifying areas of waste such as excessive inventory or waiting time

  • In a wel...read more

Asked in OPPO

5d ago

Q. What is 7qc tool, 6s, 4m, 3R, poka yoke technique, kiazen, cappa, ppm calculations, how to calculate uph,cycle time

Ans.

7QC tools, 6S, 4M, 3R, Poka Yoke, Kaizen, CAPPA, PPM, UPH, and cycle time are all important concepts in production engineering.

  • 7QC tools are quality control tools used to identify and solve production problems.

  • 6S is a methodology for workplace organization and standardization.

  • 4M stands for Man, Machine, Material, and Method and is used to identify the root cause of production problems.

  • 3R stands for Reduce, Reuse, and Recycle and is used to minimize waste in production process...read more

Q. What's cnc machine and full name of cnc machine

Ans.

A CNC machine is a computer-controlled machine tool used for precision machining of various materials.

  • CNC stands for Computer Numerical Control.

  • CNC machines are used in industries such as manufacturing, automotive, aerospace, and more.

  • They are capable of performing complex operations with high precision and repeatability.

  • Examples of CNC machines include CNC mills, lathes, routers, and plasma cutters.

Q. What is the difference between a two-stroke and a four-stroke engine?

Ans.

A two-stroke engine completes a power cycle in two strokes of the piston, while a four-stroke engine completes it in four strokes.

  • Two-stroke engines have a simpler design and are lighter than four-stroke engines.

  • Two-stroke engines have a higher power-to-weight ratio but lower fuel efficiency compared to four-stroke engines.

  • Four-stroke engines have separate intake, compression, power, and exhaust strokes, while two-stroke engines combine some of these functions.

  • Examples of two...read more

Asked in Cairn Energy

3d ago

Q. How would you handle an emergency in a production plant?

Ans.

In case of an emergency in production plant, I would follow the emergency protocol and take necessary actions to ensure safety.

  • Immediately alert the emergency response team and follow the established emergency protocol

  • Evacuate the affected area and ensure all employees are accounted for

  • Assess the situation and take necessary actions to contain the emergency

  • Communicate with management and stakeholders to keep them informed

  • Conduct a thorough investigation to determine the cause...read more

2d ago

Q. What is grinding, and why is this process required?

Ans.

Grinding is a process of removing material from a workpiece using an abrasive wheel or belt.

  • Grinding is used to achieve high surface quality and dimensional accuracy.

  • It is commonly used in manufacturing processes such as machining, welding, and casting.

  • Grinding can be done manually or with the help of machines such as grinders and lathes.

  • Examples of products that require grinding include automobile parts, medical devices, and aerospace components.

5d ago

Q. What is the difference between a matrix and a package?

Ans.

Matrix and package are different in terms of structure and purpose.

  • Matrix is a two-dimensional array of elements, while package is a collection of related classes and interfaces.

  • Matrix is used for mathematical operations and data manipulation, while package is used for organizing and managing code.

  • Matrix can be accessed using row and column indices, while package can be imported and used in other code files.

  • Example of a matrix: [[1, 2, 3], [4, 5, 6], [7, 8, 9]]

  • Example of a pa...read more

Q. The injection time reciprocating screw moves in which direction &after injection screw moves in which direction? What is NRV?

Ans.

The injection time reciprocating screw moves forward, and after injection, the screw moves backward. NRV stands for Non-Return Valve.

  • During the injection time, the reciprocating screw moves in the forward direction.

  • After injection, the screw moves in the backward direction.

  • NRV stands for Non-Return Valve.

5d ago

Q. Describe a product where you were responsible for all measurements.

Ans.

As a production engineer, I have measured the full dimensions of a car engine.

  • I have measured the length, width, and height of the engine block.

  • I have also measured the diameter and length of the pistons.

  • Additionally, I have measured the thickness and width of the cylinder walls.

  • All of these measurements are important for ensuring the engine is manufactured to the correct specifications.

Asked in ABB

1d ago

Q. What is kanban, How you ensure smooth inventory flow, How will you manage material shirtage, How will you handle manpower, How will you ensure smooth flow of material from vendor

Ans.

Kanban is a lean manufacturing system that ensures smooth inventory flow. Material shortage is managed by effective planning and communication with vendors. Manpower is handled by proper training and allocation of resources.

  • Kanban is a visual system that helps in managing inventory levels and production flow

  • Effective planning and communication with vendors helps in managing material shortage

  • Proper training and allocation of resources helps in handling manpower

  • Continuous impro...read more

Asked in OEN India

6d ago

Q. Why are switches used instead of relays in some domestic applications?

Ans.

Switches are used instead of relays in some domestic applications due to their smaller size, lower cost, and faster response time.

  • Switches are smaller in size compared to relays, making them more suitable for compact domestic appliances.

  • Switches are generally less expensive than relays, making them a cost-effective choice for domestic applications.

  • Switches have a faster response time compared to relays, allowing for quicker operation in domestic appliances.

  • Examples of domesti...read more

Asked in Tata Motors

4d ago

Q. What is the least count of a Vernier caliper?

Ans.

The least count of vernier caliper is the smallest measurement that can be read on the scale.

  • It is determined by the number of divisions on the vernier scale and the main scale.

  • For example, a vernier caliper with 20 divisions on the vernier scale and 1mm on the main scale has a least count of 0.05mm.

  • It is important to use the correct least count when taking measurements to ensure accuracy.

6d ago

Q. What are G40, G28, G99, and G90?

Ans.

G40, G28, G99, and G90 are G-codes used in CNC machining.

  • G40 is used to cancel the cutter compensation.

  • G28 is used to return the machine to the reference point.

  • G99 is used to set the feed rate to units per minute.

  • G90 is used to set the machine to absolute positioning mode.

2d ago

Q. What are the specifications of a turning tool?

Ans.

Turning tools are cutting tools used in lathe machines to remove material from a workpiece.

  • Turning tools come in various shapes and sizes depending on the application.

  • The most common types of turning tools are roughing tools, finishing tools, and threading tools.

  • The specifications of a turning tool include its material, shape, size, and cutting edge angle.

  • The material used for turning tools can be high-speed steel, carbide, or ceramic.

  • The shape and size of the turning tool de...read more

3d ago

Q. Which electrode is used in MIG welding?

Ans.

The electrode used in MIG welding is a consumable wire electrode.

  • MIG welding stands for Metal Inert Gas welding.

  • The electrode is continuously fed through a welding gun and melts to form the weld.

  • The wire electrode is made of the same material as the base metal being welded.

  • The shielding gas used in MIG welding protects the weld from atmospheric contamination.

  • Common types of wire electrodes include ER70S-6 for mild steel and ER308L for stainless steel.

Q. What technical skills are you currently learning?

Ans.

I am learning various technical skills related to production engineering.

  • I am learning about different manufacturing processes and techniques.

  • I am studying the principles of lean manufacturing and continuous improvement.

  • I am gaining knowledge about quality control and assurance methods.

  • I am learning how to analyze and optimize production systems.

  • I am studying computer-aided design (CAD) software and its applications in production engineering.

  • I am learning about automation and...read more

6d ago

Q. Which make of welding machine do you use in your current organization?

Ans.

We use Lincoln Electric welding machines in our current organization.

  • Lincoln Electric is a well-known brand in the welding industry.

  • Their machines are known for their reliability and durability.

  • We have found that their machines are easy to use and maintain.

  • We have also had good experiences with their customer service.

  • Overall, we are very satisfied with the performance of our Lincoln Electric welding machines.

2d ago

Q. Can u differentiate between 1st Angle and 3rd Angle Project and can u can draw the Views on the paper ?

Ans.

Explaining the difference between 1st and 3rd angle projection and drawing views on paper.

  • 1st angle projection is commonly used in Europe and Asia, while 3rd angle projection is used in North America.

  • In 1st angle projection, the object is placed in front of the viewing plane, while in 3rd angle projection, the object is placed behind the viewing plane.

  • To draw views on paper, first determine the orientation of the object and the viewing plane, then project the object onto the ...read more

1d ago

Q. what is distillation, types of distillation, internal of distillation column, Do you know DCS/PLC

Ans.

Distillation is a separation process used in chemical engineering to separate components of a liquid mixture based on their boiling points.

  • Distillation is a separation technique used to purify liquids or separate liquid mixtures.

  • It relies on the differences in boiling points of the components in the mixture.

  • The process involves heating the mixture to vaporize the more volatile component and then condensing it back into a liquid.

  • The condensed liquid is collected as the distill...read more

Asked in JTEKT

2d ago

Q. What are cycle time and lead time?

Ans.

Take time, cycle time, and lead time are important metrics in production engineering.

  • Take time is the time required to complete a single unit of production.

  • Cycle time is the time required to complete a single step in the production process.

  • Lead time is the time required to complete an entire production process from start to finish.

  • Reducing cycle time can increase production efficiency.

  • Reducing lead time can improve customer satisfaction.

  • Take time is often used to calculate cy...read more

Q. What colors are used for color coding?

Ans.

Colour coding is a system of assigning specific colors to objects or categories for easy identification and organization.

  • Colour coding helps in quickly identifying and distinguishing objects or categories.

  • Different industries and fields use different color coding systems.

  • Examples of color coding include: red for danger, green for safety, blue for water, yellow for caution, etc.

1
2
3
4
5
6
7
Next

Interview Experiences of Popular Companies

TCS Logo
3.5
 • 11.3k Interviews
JBM Group Logo
3.9
 • 318 Interviews
Subros Logo
3.8
 • 199 Interviews
View all

Top Interview Questions for Production Engineer Related Skills

Interview Tips & Stories
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Production Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Trusted by over 1.5 Crore job seekers to find their right fit company
80 L+

Reviews

10L+

Interviews

4 Cr+

Salaries

1.5 Cr+

Users

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2025 Info Edge (India) Ltd.

Follow Us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter
Profile Image
Hello, Guest
AmbitionBox Employee Choice Awards 2025
Winners announced!
awards-icon
Contribute to help millions!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos
Add office benefits
Add office benefits