Quantity Survey Engineer

10+ Quantity Survey Engineer Interview Questions and Answers

Updated 23 Jul 2025
search-icon
1d ago

Q. What is the role of a Quantity Surveyor in road projects?

Ans.

Quantity surveyors play a crucial role in road projects by estimating costs, managing budgets, and ensuring project efficiency.

  • Estimating costs for materials, labor, and equipment

  • Preparing tender documents and contracts

  • Managing project budgets and costs

  • Conducting cost analysis and value engineering

  • Ensuring compliance with regulations and specifications

  • Providing financial advice and risk management

  • Collaborating with engineers, architects, and contractors

  • Monitoring project prog...read more

Q. Method of measurements & 1200 code will use

Ans.

Method of measurements & 1200 code are used in quantity surveying for accurate cost estimation.

  • Method of measurements involves taking accurate measurements of the quantities of materials required for construction.

  • 1200 code refers to the Standard Method of Measurement for Building Works, which provides guidelines for measuring and pricing construction work.

  • Using these methods ensures accurate cost estimation and helps prevent cost overruns during construction.

  • Examples of items...read more

Quantity Survey Engineer Interview Questions and Answers for Freshers

illustration image
3d ago

Q. What is the process of billing?

Ans.

Billing is the process of creating and sending invoices to clients for services or products provided.

  • Prepare detailed breakdown of costs incurred

  • Calculate quantities and rates for each item

  • Include any additional charges or discounts

  • Generate invoice and send to client for payment

  • Track payments and follow up on overdue invoices

6d ago

Q. Quantity take off and Preparation of BBS for Footings Beams and Column

Ans.

Quantity take off involves measuring and calculating the materials needed for construction, while BBS (Bar Bending Schedule) is a detailed list of reinforcement bars required for footings, beams, and columns.

  • Quantity take off involves measuring the dimensions of footings, beams, and columns and calculating the required materials such as concrete and steel reinforcement.

  • Preparation of BBS for footings, beams, and columns involves detailing the sizes, shapes, and quantities of ...read more

Are these interview questions helpful?

Asked in DEC Infra

3d ago

Q. Covers for beams,Columns, footings and Raft

Ans.

Covers are used to protect beams, columns, footings, and rafts from environmental damage and corrosion.

  • Covers can be made of materials such as plastic, metal, or concrete.

  • They are used to prevent water, chemicals, and other substances from damaging the structural elements.

  • Covers can also be used to improve the aesthetics of the structure.

  • Examples of covers include beam wraps, column wraps, footing caps, and raft covers.

  • Proper installation and maintenance of covers is importan...read more

Q. Which IS code will you use?

Ans.

IS code depends on the project requirement and specifications.

  • IS codes are Indian Standards codes used for various construction materials, methods, and practices.

  • The specific IS code to be used depends on the project requirement and specifications.

  • For example, IS 456:2000 is used for the design of reinforced concrete structures.

  • IS 800:2007 is used for the design of steel structures.

  • IS 1200:1976 is used for the measurement of building and civil engineering works.

  • It is importan...read more

Quantity Survey Engineer Jobs

Ahluwalia Contracts logo
Quantity Survey Engineer 9-12 years
Ahluwalia Contracts
4.0
₹ 5 L/yr - ₹ 9 L/yr
Mumbai
Amrutha Shelters logo
Quantity Survey Engineer 8-9 years
Amrutha Shelters
3.4
₹ 5 L/yr - ₹ 6 L/yr
Bangalore / Bengaluru
Godawari Harsh Constructions logo
Quantity Survey Engineer 5-10 years
Godawari Harsh Constructions
2.5
₹ 4 L/yr - ₹ 6 L/yr
Ranchi
2d ago

Q. What inputs are required for cost estimations?

Ans.

Inputs for Cost Estimations include project scope, materials, labor costs, equipment costs, overhead costs, and profit margin.

  • Project scope: Detailed understanding of the project requirements and deliverables.

  • Materials: Cost of all materials required for the project.

  • Labor costs: Cost of labor required to complete the project.

  • Equipment costs: Cost of any equipment or machinery needed for the project.

  • Overhead costs: Additional costs such as utilities, insurance, and administrat...read more

Q. What is the difference between Quantity Surveying and Estimation?

Ans.

Quantity Surveying focuses on cost management, while estimation involves predicting project costs based on various factors.

  • Quantity Surveying (QS) involves detailed cost planning and control throughout a project lifecycle.

  • Estimation is the initial assessment of project costs, often based on limited information.

  • QS includes tasks like preparing bills of quantities, managing contracts, and ensuring compliance with regulations.

  • Estimation may use historical data or benchmarks to p...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop
6d ago

Q. What is planning?

Ans.

Planning is the process of setting objectives and determining the best course of action to achieve them effectively.

  • Identifying project goals: For example, determining the completion date for a construction project.

  • Resource allocation: Ensuring the right materials and labor are available when needed.

  • Risk management: Assessing potential risks, such as weather delays, and developing contingency plans.

  • Budgeting: Estimating costs and ensuring the project stays within financial li...read more

Q. Roles of Quantity surveyors.

Ans.

Quantity surveyors manage project costs, ensuring financial efficiency and value for money throughout the construction process.

  • Cost estimation: Preparing detailed cost estimates for construction projects, e.g., estimating materials and labor for a new building.

  • Budget management: Monitoring project budgets to prevent overspending, such as tracking expenses during a renovation.

  • Tendering process: Assisting in the preparation of tender documents and evaluating bids from contracto...read more

Asked in LCC Projects

5d ago

Q. Mathematical Formula

Ans.

The question is asking for a mathematical formula.

  • Identify the variables and constants in the formula

  • Understand the relationship between the variables

  • Apply the formula to solve the problem

Interview Experiences of Popular Companies

TELUS Digital Logo
3.6
 • 117 Interviews
View all
Interview Tips & Stories
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Quantity Survey Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Trusted by over 1.5 Crore job seekers to find their right fit company
80 L+

Reviews

10L+

Interviews

4 Cr+

Salaries

1.5 Cr+

Users

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2025 Info Edge (India) Ltd.

Follow Us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter
Profile Image
Hello, Guest
AmbitionBox Employee Choice Awards 2025
Winners announced!
awards-icon
Contribute to help millions!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos
Add office benefits
Add office benefits