Upload Button Icon Add office photos

Adani Infra

Compare button icon Compare button icon Compare

Filter interviews by

Adani Infra Associate Manager Interview Questions and Answers

Updated 25 Feb 2025

Adani Infra Associate Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Aug 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. Technical subjects and last projects
  • Q2. Underground utility
  • Q3. Hydrology calculation for drainage
  • Ans. 

    Hydrology calculation for drainage involves determining the flow of water through a drainage system.

    • Calculate the area of the drainage basin

    • Estimate the average rainfall intensity for the area

    • Determine the time of concentration for the drainage system

    • Use the Rational Method or SCS Curve Number method to calculate peak flow rates

    • Consider factors such as soil type, land use, and slope of the area

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Adani Infra?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. Technical civil
  • Q2. Civil Quality cube test

Interview Preparation Tips

Interview preparation tips for other job seekers - Very Good,nice

Associate Manager Interview Questions Asked at Other Companies

Q1. How will you calculate the tension on a sheet being unwound from ... read more
asked in PepsiCo
Q2. In Sponsored Products, how many types of campaigns can you create ... read more
asked in Accenture
Q3. What is Soc7 and other Cobol /Jcl error codes ...
asked in PepsiCo
Q4. Are you familiar with environments where you have to explain what ... read more
Q5. What will happen if there is a leakage inside the De Oxo furnace ... read more
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview in Oct 2024, where I was asked the following questions.

  • Q1. What are the basic principles of budget control?
  • Ans. 

    Budget control involves planning, monitoring, and adjusting financial resources to achieve organizational goals effectively.

    • Establishing a budget: Create a detailed financial plan outlining expected revenues and expenses, e.g., annual departmental budgets.

    • Monitoring performance: Regularly compare actual financial performance against the budget to identify variances, e.g., monthly financial reports.

    • Variance analysis: In...

  • Answered by AI
  • Q2. What is the significance of the Building and Other Construction Workers (BOCW) Act in relation to minimum wages for laborers?
  • Ans. 

    The BOCW Act ensures minimum wages and welfare for construction workers, promoting their rights and safety.

    • The BOCW Act mandates the payment of minimum wages to construction workers, ensuring fair compensation for their labor.

    • It establishes welfare measures such as health insurance, housing, and education for workers and their families.

    • The Act applies to various construction activities, including building, roads, and b...

  • Answered by AI
  • Q3. What is the difference between indirect costs and overhead costs?
  • Ans. 

    Indirect costs are expenses not directly tied to a product, while overhead costs are ongoing business expenses.

    • Indirect costs are not directly attributable to a specific project or product, e.g., administrative salaries.

    • Overhead costs include all ongoing expenses to operate a business, e.g., rent, utilities.

    • All overhead costs are indirect costs, but not all indirect costs are overhead costs.

    • Examples of indirect costs: ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This is a great company to work for, characterized by a genuinely positive work atmosphere.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Discussion about the profile
Round 3 - Technical 

(1 Question)

  • Q1. Site reporting manager ask questions as per core relevants.
Round 4 - Client Interview 

(1 Question)

  • Q1. Ask all technical questions regarding the core relevant areas

Interview Preparation Tips

Interview preparation tips for other job seekers - Very easy process

Interview Preparation Tips

Round: TECHNICAL ROUND TEST
Experience: A 45 mins round which consisted of 30 mins of core questions and 15 mins of data structures.  It was a mix of test on our knowledge .

Round: HR Interview
Experience: Most of the questions were based on general knowledge and many of them were from the resume provides by me

General Tips: It is always advisable to be prepared with certain set of general questions which make it easier to answer.
Skill Tips: Focus on your Study.. Revise the subject that you have studied at the time of Interview
Skills: Technical Skills
College Name: IIT MADRAS

Interview Preparation Tips

Round: Test
Experience: Questions were on Aptitude, English, Probability, Permutations andCombinations and Programming (C, C++). NO Group Discussion was held.Candidates were shortlisted on the basis of their test scores.

Round: Technical Interview
Experience: Total time of this round was 45 minutes.First 30 minutes, questions on core programming were asked and in the remaining 15 minutes questions were asked on data structures.

Round: HR Interview
Experience: This was a 5 minute round where questions were put up, some based on the resume and other were general questions.

Skills: Knowledge in MATLAB.
College Name: IIT MADRAS

Interview Questionnaire 

1 Question

  • Q1. Concepts
Are these interview questions helpful?

Interview Questionnaire 

1 Question

  • Q1. Concepts

Interview Questionnaire 

2 Questions

  • Q1. Write Query
  • Ans. 

    Write a query

    • Specify the database and table name

    • List the columns to be selected

    • Add any conditions or filters

    • Specify the order of results

  • Answered by AI
  • Q2. Update query

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Java , selenim , testng , cucumber

Adani Infra Interview FAQs

How many rounds are there in Adani Infra Associate Manager interview?
Adani Infra interview process usually has 1 rounds. The most common rounds in the Adani Infra interview process are Technical.
What are the top questions asked in Adani Infra Associate Manager interview?

Some of the top questions asked at the Adani Infra Associate Manager interview -

  1. Hydrology calculation for drain...read more
  2. Technical subjects and last proje...read more
  3. Underground util...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.3/5

based on 3 interview experiences

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 50%
6-8 weeks 50%
View more

Interview Questions from Similar Companies

J&F Interview Questions
3.7
 • 30 Interviews
J K Fenner Interview Questions
3.9
 • 30 Interviews
Eversendai Interview Questions
3.7
 • 29 Interviews
View all
Adani Infra Associate Manager Salary
based on 73 salaries
₹13.4 L/yr - ₹25 L/yr
19% more than the average Associate Manager Salary in India
View more details

Adani Infra Associate Manager Reviews and Ratings

based on 19 reviews

3.9/5

Rating in categories

3.5

Skill development

3.4

Work-life balance

3.8

Salary

3.7

Job security

3.4

Company culture

3.2

Promotions

3.3

Work satisfaction

Explore 19 Reviews and Ratings
Assistant Manager
152 salaries
unlock blur

₹6.4 L/yr - ₹15 L/yr

Deputy Manager
88 salaries
unlock blur

₹9.5 L/yr - ₹19.3 L/yr

Associate Manager
73 salaries
unlock blur

₹13.4 L/yr - ₹25 L/yr

Senior Engineer
61 salaries
unlock blur

₹5 L/yr - ₹12 L/yr

Manager
35 salaries
unlock blur

₹17 L/yr - ₹33 L/yr

Explore more salaries
Compare Adani Infra with

Patel Infrastructure

3.8
Compare

CTS Consulting & Technical Support

3.7
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare
write
Share an Interview