I appeared for an interview before May 2024, where I was asked the following questions.
Test frequency ensures consistent quality and reliability in engineering projects, balancing thoroughness and efficiency.
Frequency of tests should align with project milestones, e.g., after major construction phases.
Regular inspections (e.g., weekly) can catch issues early, preventing costly rework.
Critical components may require more frequent testing, such as daily checks on safety equipment.
Post-installation tests sh...
Concrete pouring location is crucial for structural integrity and quality control during construction projects.
Ensure the site is clean and free of debris to prevent contamination.
Check weather conditions; avoid pouring in extreme temperatures or rain.
Verify that formwork is properly installed and secure to hold the concrete.
Use appropriate equipment for pouring, such as pumps or chutes, depending on the location.
Condu...
In-house concrete design involves creating concrete mixes tailored to specific project requirements and environmental conditions.
Understand the project specifications, including load-bearing requirements and environmental conditions.
Select appropriate materials: cement type, aggregates, water, and admixtures based on desired properties.
Conduct mix design calculations to achieve target strength, workability, and durabil...
Top trending discussions
I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.
posted on 6 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
I appeared for an interview in Feb 2023.
Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and managing relationships.
Identify needs and requirements
Research and select potential suppliers
Negotiate terms and conditions
Create and sign contracts
Manage supplier relationships and performance
Monitor and evaluate procurement process effectiveness
Integrity with internal stakeholders is crucial for building trust and maintaining a positive work environment.
Communicate openly and honestly with colleagues and superiors
Respect confidentiality and avoid gossip or spreading rumors
Follow through on commitments and hold yourself accountable
Act with fairness and impartiality in decision-making
Admit mistakes and take responsibility for correcting them
Lead by example and ...
COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.
COS includes costs such as raw materials, labor, and manufacturing overhead.
Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.
Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...
EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.
EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.
It is represented by the ASCII control character with the code 04.
EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...
A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.
A claim is typically submitted by a policyholder or healthcare provider to an insurance company.
It includes details such as the services provided, dates of service, and the amount billed.
The insurance company reviews the claim to determine if it meets the policy's coverage criteria.
Once approved, the ...
RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.
RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.
It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.
RFIs are often used as a preliminary step before issui...
Estimates are calculated predictions of the cost, time, and resources required for a project.
Gather all relevant information and data related to the project
Break down the project into smaller tasks or components
Use historical data or industry benchmarks to estimate the time and cost for each task
Consider any potential risks or uncertainties that may impact the estimates
Document the estimates and communicate them clearl...
I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.
Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.
This process is time-dependent and can take years to complete.
Consolidation can cause settlement and deformation of structures built on top of the...
posted on 27 Oct 2023
posted on 21 Sep 2021
I applied via Company Website and was interviewed in Mar 2021. There were 5 interview rounds.
posted on 18 Oct 2023
I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.
Yes, I have knowledge in Piping engineering.
I have a degree in Mechanical Engineering which includes coursework in Piping design and analysis.
I have practical experience working on piping projects in my previous roles.
I am familiar with industry standards and codes related to piping engineering such as ASME B31.3 and API 570.
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Assistant Manager
165
salaries
| ₹5.2 L/yr - ₹16 L/yr |
Senior Engineer
134
salaries
| ₹4.2 L/yr - ₹12 L/yr |
Deputy Manager
99
salaries
| ₹5.8 L/yr - ₹18 L/yr |
Site Engineer
96
salaries
| ₹3 L/yr - ₹7.6 L/yr |
Store Officer
86
salaries
| ₹2.2 L/yr - ₹6 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Saipem