Upload Button Icon Add office photos

Filter interviews by

ARSS Infrastructure Projects Interview Questions and Answers

Updated 30 Apr 2025
Popular Designations

13 Interview questions

An Asset Manager was asked 3mo ago
Q. Which types of assets are not maintained in compliance with RTO regulations in construction equipment?
Ans. 

Certain construction equipment assets may not comply with RTO regulations due to various factors.

  • Heavy machinery like bulldozers may lack proper registration.

  • Excavators often have outdated safety certifications.

  • Cranes might not meet inspection requirements.

  • Forklifts can be unregistered or improperly maintained.

View all Asset Manager interview questions
An Asset Manager was asked 3mo ago
Q. What is the meaning of an asset, and how can it be managed effectively?
Ans. 

An asset is a resource with economic value, and effective management involves strategic planning and monitoring.

  • Definition: An asset is anything of value owned by an individual or entity, such as stocks, bonds, real estate, or cash.

  • Types of Assets: Assets can be classified into tangible (physical items like property) and intangible (like patents or trademarks).

  • Valuation: Regularly assess the value of assets to und...

View all Asset Manager interview questions
An Asset Manager was asked 3mo ago
Q. Can you explain the process for completing the RTO (Regional Transport Office) requirements?
Ans. 

The RTO process involves vehicle registration, licensing, and compliance with local transport regulations.

  • Gather necessary documents: ID proof, address proof, vehicle purchase invoice.

  • Fill out the application form for vehicle registration or license.

  • Submit the application along with required documents to the RTO office.

  • Pay the applicable fees for registration or licensing.

  • Schedule a vehicle inspection if required,...

View all Asset Manager interview questions
A Deputy Project Manager was asked
Q. Using a bitumen extractor machine, how much prime coat is spread over WMM per square meter?
Ans. 

The quantity of prime coat spread over WMM per sq. mt. depends on the type of bitumen extractor machine used.

  • The quantity of prime coat depends on the type of bitumen extractor machine used

  • It is important to follow the manufacturer's instructions for the specific machine being used

  • Factors such as temperature, humidity, and surface condition can also affect the quantity of prime coat needed

  • Typically, the quantity o...

View all Deputy Project Manager interview questions
A Deputy Project Manager was asked
Q. What is the typical slope of a normal camber?
Ans. 

The slope in normal camber varies depending on the design and purpose of the structure.

  • Normal camber is the slight arching or upward curve given to a beam or truss to counteract deflection due to loads.

  • The slope in normal camber can range from 1/8 inch to 1/2 inch per foot, depending on the span and load requirements.

  • For example, a bridge beam may have a normal camber slope of 1/4 inch per foot to support heavy tr...

View all Deputy Project Manager interview questions
A Deputy Project Manager was asked
Q. How much tack coat is used over GSB per square meter, as measured by a bitumen extractor machine?
Ans. 

The quantity of tack coat used over GSB per sq.mt. depends on various factors such as the type of bitumen extractor machine, the thickness of the GSB layer, and the weather conditions.

  • The quantity of tack coat used can range from 0.2 to 0.5 liters per sq.mt.

  • The type of bitumen extractor machine used can affect the quantity of tack coat used.

  • The thickness of the GSB layer can also impact the quantity of tack coat u...

View all Deputy Project Manager interview questions
A Deputy Project Manager was asked
Q. What is the percentage of slope in the shoulder?
Ans. 

The percentage of slope in shoulder varies depending on the location and purpose of the shoulder.

  • The slope of the shoulder can range from 0-45 degrees depending on the design of the road or pathway.

  • The slope of the shoulder should be designed to allow for proper drainage and prevent water from pooling on the road.

  • The slope of the shoulder should also be designed to provide a safe and stable surface for pedestrians...

View all Deputy Project Manager interview questions
Are these interview questions helpful?
A Deputy Project Manager was asked
Q. Which factor is most important when designing rigid pavement?
Ans. 

The design of Rigid Pavement is dependable on the type of traffic and the subgrade soil conditions.

  • Traffic load and volume

  • Subgrade soil conditions

  • Climate and weather conditions

  • Concrete mix design

  • Joint spacing and layout

View all Deputy Project Manager interview questions
A Deputy Project Manager was asked 10mo ago
Q. Types of cement and density?
Ans. 

Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement. Density varies depending on the type of cement.

  • Types of cement: Portland cement, rapid-hardening cement, sulfate-resistant cement

  • Density varies based on the type of cement

  • Portland cement is the most common type used in construction projects

View all Deputy Project Manager interview questions
A Highway Supervisor was asked 11mo ago
Q. GSB material name
Ans. 

GSB material name refers to the type of material used in construction and maintenance of highways.

  • GSB stands for Granular Sub Base

  • Common materials used for GSB include crushed stone, gravel, and sand

  • GSB material is compacted to provide a stable foundation for the road surface

View all Highway Supervisor interview questions

ARSS Infrastructure Projects Interview Experiences

18 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Please ask me about AutoCAD
  • Q2. Please ask me about railway bridge
  • Q3. I am understand by railway earth work

Interview Preparation Tips

Topics to prepare for ARSS Infrastructure Projects Civil Site Engineer interview:
  • I have 2.6 years experience
Interview preparation tips for other job seekers - I want to need a job
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(21 Questions)

  • Q1. Electrical engineering
  • Q2. Fresher questions
  • Q3. DG other questions
  • Q4. Transformer other questions
  • Q5. Power Relay other questions
  • Q6. Grid station other questions
  • Q7. Motors other questions
  • Q8. Generator other questions
  • Q9. Power transformer other questions
  • Q10. Circuit breaker other questions
  • Q11. Ac to Dc conversion
  • Q12. Current Transformer
  • Q13. Potential Transformer
  • Q14. Panels other questions
  • Q15. Rectifier Transformer
  • Q16. Rectifier Generator
  • Q17. Distribution other questions
  • Q18. 6.6 kva switch gare
  • Ans. 

    A 6.6 kVA switch gear is a type of electrical equipment used for controlling, protecting, and isolating electrical circuits.

    • Switch gear is used to control the flow of electricity in a circuit

    • 6.6 kVA indicates the power rating of the switch gear

    • It is important for protecting electrical equipment from overloads and short circuits

  • Answered by AI
  • Q19. Pcc other questions
  • Q20. Mcc other questions
  • Q21. Electrical basic transformer

Interview Preparation Tips

Topics to prepare for ARSS Infrastructure Projects Electrical Engineer interview:
  • Dopluma fresher
Interview preparation tips for other job seekers - I, m dopluma graduation in electrical engineering from Govt polytechnic college kishtwar college was wonderful experience as i was not only involved in learning about core concept of electrical engineering and practical project

Project Manager Interview Questions & Answers

user image Asif Iqbal

posted on 30 Apr 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. What are the rates of various items involved in building construction?
  • Q2. What are the steps involved in the construction of roads, buildings, and railways?

Civil Engineer Interview Questions & Answers

user image Jitu Behera

posted on 1 Apr 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in

Round 1 - HR 

(2 Questions)

  • Q1. Why use reinforcement for structure
  • Ans. 

    Reinforcement is used in structures to increase strength, durability, and resistance to various forces.

    • Reinforcement helps to distribute loads more evenly throughout the structure.

    • It increases the tensile strength of the structure, making it more resistant to bending and cracking.

    • Reinforcement can also improve the overall durability and longevity of the structure.

    • Common types of reinforcement include steel bars, mesh, ...

  • Answered by AI
  • Q2. Bar bending schedule

Store Keeper Interview Questions & Answers

user image Anonymous

posted on 22 Apr 2023

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About construction materials etv.
  • Q2. Raw materials reconciliation power & fuel

Asset Manager Interview Questions & Answers

user image Anonymous

posted on 25 Mar 2025

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. What is the meaning of an asset, and how can it be managed effectively?
  • Ans. 

    An asset is a resource with economic value, and effective management involves strategic planning and monitoring.

    • Definition: An asset is anything of value owned by an individual or entity, such as stocks, bonds, real estate, or cash.

    • Types of Assets: Assets can be classified into tangible (physical items like property) and intangible (like patents or trademarks).

    • Valuation: Regularly assess the value of assets to understa...

  • Answered by AI
  • Q2. Can you explain the process for completing the RTO (Regional Transport Office) requirements?
  • Ans. 

    The RTO process involves vehicle registration, licensing, and compliance with local transport regulations.

    • Gather necessary documents: ID proof, address proof, vehicle purchase invoice.

    • Fill out the application form for vehicle registration or license.

    • Submit the application along with required documents to the RTO office.

    • Pay the applicable fees for registration or licensing.

    • Schedule a vehicle inspection if required, and ...

  • Answered by AI
  • Q3. Which types of assets are not maintained in compliance with RTO regulations in construction equipment?
  • Ans. 

    Certain construction equipment assets may not comply with RTO regulations due to various factors.

    • Heavy machinery like bulldozers may lack proper registration.

    • Excavators often have outdated safety certifications.

    • Cranes might not meet inspection requirements.

    • Forklifts can be unregistered or improperly maintained.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The company is very good, but the salary increase is low.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Types of cement and density?
  • Ans. 

    Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement. Density varies depending on the type of cement.

    • Types of cement: Portland cement, rapid-hardening cement, sulfate-resistant cement

    • Density varies based on the type of cement

    • Portland cement is the most common type used in construction projects

  • Answered by AI
  • Q2. Density of sleeper's in one km?
  • Ans. 

    The density of sleepers in one km can vary depending on the context, such as whether it refers to railway sleepers or people sleeping outdoors.

    • Density of railway sleepers in one km can vary based on the type of track and spacing between sleepers.

    • Density of people sleeping outdoors in one km would depend on the location and circumstances.

    • For example, in a homeless encampment, the density of sleepers in one km might be h...

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical interview on job.
  • Q2. Regarding your experience

Interview Preparation Tips

Interview preparation tips for other job seekers - The job positioning u give interview that regarding question and answer asked in interview

Highway Supervisor Interview Questions & Answers

user image Barun Sarkar

posted on 13 Jul 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. WMM full form ...
  • Ans. 

    WMM stands for Wet Mix Macadam, which is a type of road construction method using a mixture of aggregates and water.

    • WMM is a type of road construction method used for laying base and sub-base layers of roads.

    • It involves mixing aggregates like stone, sand, and gravel with water to form a strong base.

    • WMM is often used in highway construction to provide a stable foundation for the road surface.

    • The mixture is compacted usi...

  • Answered by AI
  • Q2. GSB material name
  • Ans. 

    GSB material name refers to the type of material used in construction and maintenance of highways.

    • GSB stands for Granular Sub Base

    • Common materials used for GSB include crushed stone, gravel, and sand

    • GSB material is compacted to provide a stable foundation for the road surface

  • Answered by AI

I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. Required compaction as per MORTH of dry lean concrete
  • Ans. 

    The required compaction for dry lean concrete is specified by MORTH.

    • MORTH specifies the minimum dry density and optimum moisture content for dry lean concrete.

    • The compaction factor for dry lean concrete should be between 0.78 to 0.82.

    • The compaction should be done using a plate vibrator or a needle vibrator.

    • The required compaction can vary depending on the type of dry lean concrete being used.

    • Proper compaction is import...

  • Answered by AI
  • Q2. Which one is dependable to design of Rigid Pavement
  • Ans. 

    The design of Rigid Pavement is dependable on the type of traffic and the subgrade soil conditions.

    • Traffic load and volume

    • Subgrade soil conditions

    • Climate and weather conditions

    • Concrete mix design

    • Joint spacing and layout

  • Answered by AI
  • Q3. How much percentage of slope in shoulder
  • Ans. 

    The percentage of slope in shoulder varies depending on the location and purpose of the shoulder.

    • The slope of the shoulder can range from 0-45 degrees depending on the design of the road or pathway.

    • The slope of the shoulder should be designed to allow for proper drainage and prevent water from pooling on the road.

    • The slope of the shoulder should also be designed to provide a safe and stable surface for pedestrians and ...

  • Answered by AI
  • Q4. How much slope in normal camber
  • Ans. 

    The slope in normal camber varies depending on the design and purpose of the structure.

    • Normal camber is the slight arching or upward curve given to a beam or truss to counteract deflection due to loads.

    • The slope in normal camber can range from 1/8 inch to 1/2 inch per foot, depending on the span and load requirements.

    • For example, a bridge beam may have a normal camber slope of 1/4 inch per foot to support heavy traffic...

  • Answered by AI
  • Q5. How much quantity used in prime coat spread over WMM in per sq. Mt. Reby bitumen extractor machine
  • Ans. 

    The quantity of prime coat spread over WMM per sq. mt. depends on the type of bitumen extractor machine used.

    • The quantity of prime coat depends on the type of bitumen extractor machine used

    • It is important to follow the manufacturer's instructions for the specific machine being used

    • Factors such as temperature, humidity, and surface condition can also affect the quantity of prime coat needed

    • Typically, the quantity of pri...

  • Answered by AI
  • Q6. How much tack coat of quantity used over GSB in per sq.mt.by bitumen extractor machine
  • Ans. 

    The quantity of tack coat used over GSB per sq.mt. depends on various factors such as the type of bitumen extractor machine, the thickness of the GSB layer, and the weather conditions.

    • The quantity of tack coat used can range from 0.2 to 0.5 liters per sq.mt.

    • The type of bitumen extractor machine used can affect the quantity of tack coat used.

    • The thickness of the GSB layer can also impact the quantity of tack coat used.

    • W...

  • Answered by AI
  • Q7. Required compaction as per as MORTH of Embankment

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be in positive attitude if you know the answer then give it in a politely way, if not then say that I go for thorough study.

Top trending discussions

View All
Interview Tips & Stories
2w
timepasstiwari
·
A Digital Markter
ChatGPT prepped me HARD for my interview!
Spent like two hours on chatgpt yesterday prepping for an interview. First, the usual, copy-pasted my resume and the job description, telling it to "upload this to your memory 'cause we are going to talk about it later". Then I grilled it with questions about stuff I didn't get in the job spec, and chatgpt helped me figure things out. I asked it to list the four or five key things they are looking for in the role. Then I told chatgpt to quiz me with ten questions, one at a time, to help me think about how I have gained experience in those areas. After the ten questions, it gave me strengths/weaknesses and a summary. Finally, I had chatgpt summarize each of my answers into three bullet points. Now have got a list of stories ready to go for any interview. No matter the question, I can steer the convo toward one of these success stories.
Got a question about ARSS Infrastructure Projects?
Ask anonymously on communities.

ARSS Infrastructure Projects Interview FAQs

How many rounds are there in ARSS Infrastructure Projects interview?
ARSS Infrastructure Projects interview process usually has 1-2 rounds. The most common rounds in the ARSS Infrastructure Projects interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for ARSS Infrastructure Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ARSS Infrastructure Projects. The most common topics and skills that interviewers at ARSS Infrastructure Projects expect are Excel, Construction, Business Intelligence, Civil and Financial Analysis.
What are the top questions asked in ARSS Infrastructure Projects interview?

Some of the top questions asked at the ARSS Infrastructure Projects interview -

  1. How much quantity used in prime coat spread over WMM in per sq. Mt. Reby bitume...read more
  2. Which types of assets are not maintained in compliance with RTO regulations in ...read more
  3. How much tack coat of quantity used over GSB in per sq.mt.by bitumen extractor ...read more
What are the most common questions asked in ARSS Infrastructure Projects HR round?

The most common HR questions asked in ARSS Infrastructure Projects interview are -

  1. What are your strengths and weakness...read more
  2. Why are you looking for a chan...read more
  3. What are your salary expectatio...read more
How long is the ARSS Infrastructure Projects interview process?

The duration of ARSS Infrastructure Projects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.4/5

based on 11 interview experiences

Difficulty level

Easy 17%
Moderate 50%
Hard 33%

Duration

Less than 2 weeks 67%
2-4 weeks 33%
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 817 Interviews
AtkinsRealis Interview Questions
3.9
 • 92 Interviews
H.G. Infra Engineering Interview Questions
4.1
 • 88 Interviews
ITD Cementation India Interview Questions
4.3
 • 78 Interviews
Simplex Infrastructures Interview Questions
3.4
 • 73 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 71 Interviews
GVPR Engineers Interview Questions
3.8
 • 61 Interviews
Capacit'e Infraprojects Interview Questions
3.6
 • 60 Interviews
Ahluwalia Contracts India Interview Questions
4.0
 • 59 Interviews
View all

ARSS Infrastructure Projects Reviews and Ratings

based on 155 reviews

3.8/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.6

Salary

3.3

Job security

3.5

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 155 Reviews and Ratings
Civil Site Engineer
22 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Site Engineer
13 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Civil Engineer
9 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Store Incharge
8 salaries
unlock blur

₹1 L/yr - ₹3 L/yr

HR Officer
6 salaries
unlock blur

₹3 L/yr - ₹3.9 L/yr

Explore more salaries
Compare ARSS Infrastructure Projects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
write
Share an Interview