Upload Button Icon Add office photos

Filter interviews by

ARSS Infrastructure Projects Site Engineer Interview Questions and Answers

Updated 23 Apr 2022

ARSS Infrastructure Projects Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 18 Apr 2022

I applied via Company Website

Round 1 - Technical 

(1 Question)

  • Q1. How much year experience
  • Ans. 

    I have 5 years of experience as a Site Engineer.

    • I have worked on various construction projects, overseeing the site operations and ensuring adherence to plans and specifications.

    • During my tenure, I have successfully managed teams, coordinated with subcontractors, and resolved on-site issues.

    • I am well-versed in interpreting blueprints, conducting quality inspections, and ensuring compliance with safety regulations.

    • One n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good communication skills very confident and good knowledge

Top trending discussions

View All
Interview Tips & Stories
2w
timepasstiwari
·
A Digital Markter
ChatGPT prepped me HARD for my interview!
Spent like two hours on chatgpt yesterday prepping for an interview. First, the usual, copy-pasted my resume and the job description, telling it to "upload this to your memory 'cause we are going to talk about it later". Then I grilled it with questions about stuff I didn't get in the job spec, and chatgpt helped me figure things out. I asked it to list the four or five key things they are looking for in the role. Then I told chatgpt to quiz me with ten questions, one at a time, to help me think about how I have gained experience in those areas. After the ten questions, it gave me strengths/weaknesses and a summary. Finally, I had chatgpt summarize each of my answers into three bullet points. Now have got a list of stories ready to go for any interview. No matter the question, I can steer the convo toward one of these success stories.
Got a question about ARSS Infrastructure Projects?
Ask anonymously on communities.

Interview questions from similar companies

I appeared for an interview in Aug 2019.

Interview Questionnaire 

4 Questions

  • Q1. How many types of structure
  • Ans. 

    There are various types of structures, including buildings, bridges, dams, tunnels, and towers.

    • Structures can be classified based on their purpose, design, and materials used.

    • Buildings can be further classified into residential, commercial, and industrial structures.

    • Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.

    • Dams can be classified into gravity, arch, buttress, and embankment dams.

    • Tu...

  • Answered by AI
  • Q2. What is density
  • Ans. 

    Density is the measure of mass per unit volume of a substance.

    • It is a physical property of matter.

    • It is calculated by dividing the mass of a substance by its volume.

    • Units of density include kg/m³, g/cm³, and lb/ft³.

    • Density can be used to identify substances and determine their purity.

    • For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.

  • Answered by AI
  • Q3. How many types of density construction
  • Ans. 

    There are two types of density construction: compacted and loose.

    • Compacted density construction involves compressing the material to increase its density, such as in road construction.

    • Loose density construction involves leaving the material in its natural state, such as in landscaping.

    • The type of density construction used depends on the intended use of the material and the desired level of compaction.

    • Other factors that...

  • Answered by AI
  • Q4. Which types of tests construction joint
  • Ans. 

    Tests for construction joints include visual inspection, water tightness test, and load transfer test.

    • Visual inspection to check for proper joint alignment and sealant application

    • Water tightness test to ensure no water leakage through the joint

    • Load transfer test to verify the joint can handle the intended load

    • Other tests may include pull-out test, shear test, and compression test

    • Testing frequency and methods may vary d...

  • Answered by AI

Skills evaluated in this interview

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What is the definition of rolling margin in the context of steel?
Q3. Which type of pipeline and standards do you follow?
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Precommissioning test of transformers
  • Ans. 

    Precommissioning tests of transformers ensure proper functioning and safety before energizing.

    • Visual inspection of transformer and its components

    • Measurement of insulation resistance

    • Measurement of winding resistance

    • Verification of transformer ratio and polarity

    • Verification of oil level and quality

    • Testing of protective devices

    • Verification of grounding

    • Functional testing of cooling system

    • Verification of nameplate data

  • Answered by AI
  • Q2. 11kv & 33kv overhead power line distribution
  • Ans. 

    11kv & 33kv overhead power line distribution

    • 11kv and 33kv are common voltage levels for overhead power lines

    • Overhead power lines are used to distribute electricity from power stations to consumers

    • The voltage level determines the distance the power can be transmitted and the size of the conductors needed

    • Proper insulation and grounding is important for safety

    • Maintenance and inspection of the lines is necessary to ensure ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - this interview was based on electrical basic concepts for practical site works.

Interview Questionnaire 

1 Question

  • Q1. Site related

Interview Questionnaire 

1 Question

  • Q1.  Floor Tile thickness, types of tile, company of tile,

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What a term of Rolling margin on a steel?
  • Ans. Rolling margin is a difference weight of steel actual weight and theoretical weight.
  • Answered by Arvind Devrani
  • Q2. Initial setting time of cement
  • Ans. Less then 30Min.not 30 min
  • Answered by Arvind Devrani
  • Q3. Elongation % of steel fy 500
  • Ans. 

    The elongation % of steel fy 500 is approximately 12%.

    • Elongation % is the measure of ductility of a material.

    • It is the percentage increase in length of a material before it fractures under tension.

    • For steel fy 500, the elongation % is approximately 12%.

    • This means that the steel can stretch up to 12% of its original length before it breaks.

  • Answered by AI
  • Q4. How much bag of cement in 1 cubic meter
  • Ans. 28.8
  • Answered by Arvind Devrani
  • Q5. How much density of material Steel Concrete Sand

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically sound interview, like sagging hogging loads moment shear, all about steel, concrete and formwork such as qty calculation and fixing procedures.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Abouts my qualifications Why are you interested
Round 3 - Technical 

(1 Question)

  • Q1. My work related about water supply project

Interview Preparation Tips

Interview preparation tips for other job seekers - Increase your knowledge about your fields to the part of your area
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About last company works
  • Q2. About steel and concrete
  • Q3. Handling labours and supervisors
Round 3 - HR 

(2 Questions)

  • Q1. About last paid salary
  • Q2. 1)Marital status 2) accomodation

I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Steel and SHUTTERING, project management
  • Q2. Hook lenght, deduction of steel in bends

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive always , face with your knowledge and attitude
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Tell me about ur self in brief
  • Q2. Qualifications and working experience related questions
  • Q3. Problem solving questions
  • Q4. Conditional questions
  • Q5. About concrete grade

Interview Preparation Tips

Topics to prepare for Hindustan Construction Company Site Engineer interview:
  • Works relate
  • Execution
  • Concrete
  • Bbs
  • Billing
Interview preparation tips for other job seekers - If u r experienced person then gain deep knowledge related to ur field and which are your previous working experience u have.

ARSS Infrastructure Projects Interview FAQs

How many rounds are there in ARSS Infrastructure Projects Site Engineer interview?
ARSS Infrastructure Projects interview process usually has 1 rounds. The most common rounds in the ARSS Infrastructure Projects interview process are Technical.

Tell us how to improve this page.

ARSS Infrastructure Projects Site Engineer Salary
based on 13 salaries
₹1.8 L/yr - ₹3.9 L/yr
26% less than the average Site Engineer Salary in India
View more details

ARSS Infrastructure Projects Site Engineer Reviews and Ratings

based on 4 reviews

4.8/5

Rating in categories

5.0

Skill development

4.7

Work-life balance

4.7

Salary

4.4

Job security

4.8

Company culture

4.4

Promotions

4.7

Work satisfaction

Explore 4 Reviews and Ratings
Civil Site Engineer
22 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Site Engineer
13 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Civil Engineer
9 salaries
unlock blur

₹1.5 L/yr - ₹4.2 L/yr

Store Incharge
8 salaries
unlock blur

₹1 L/yr - ₹3 L/yr

HR Officer
6 salaries
unlock blur

₹3 L/yr - ₹3.9 L/yr

Explore more salaries
Compare ARSS Infrastructure Projects with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
write
Share an Interview