I appeared for an interview in Aug 2022.
Handled projects with power capacity up to 500 MW
Managed electrical design and installation for power plants with capacity up to 500 MW
Oversaw testing and commissioning of electrical systems for large-scale industrial projects
Implemented energy-efficient solutions to optimize power usage and reduce costs
Collaborated with cross-functional teams to ensure project timelines and budgets were met
Top trending discussions
I applied via Walk-in and was interviewed in Mar 2023. There were 3 interview rounds.
I appeared for an interview before Jan 2024, where I was asked the following questions.
Yaw systems typically use servo motors for precise control of the orientation of wind turbines or other rotating equipment.
Servo Motors: These motors provide precise control of angular position, making them ideal for yaw systems in wind turbines.
DC Brushless Motors: Commonly used in yaw systems due to their high efficiency and reliability.
Stepper Motors: Sometimes used for smaller applications where precise positioning...
A power diagram visually represents the distribution and flow of electrical power in a system, aiding in analysis and design.
Components Identification: Clearly label all components such as generators, transformers, and loads to understand their roles in the system.
Power Flow Arrows: Use arrows to indicate the direction of power flow between components, helping to visualize how energy is distributed.
Voltage Levels: Incl...
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
The IR resistance of a motor refers to the insulation resistance, which measures the resistance of the insulation material surrounding the motor windings.
IR resistance is measured in ohms and indicates the ability of the insulation to prevent current leakage.
A higher IR resistance value indicates better insulation quality and less risk of electrical faults.
Regular testing of IR resistance is important to ensure the mot...
About power plants activities
posted on 16 May 2024
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
Technical interview with concerned HOD
posted on 24 Feb 2023
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
Hazardous classification refers to the categorization of substances or environments based on their potential to cause harm or danger.
Hazardous classification is used to identify and communicate the level of risk associated with different substances or environments.
It helps in determining the appropriate safety measures and precautions to be taken.
Classification criteria include factors such as flammability, explosivene...
Electrical codes play a crucial role in lighting design, ensuring safety, efficiency, and compliance.
Electrical codes provide guidelines for the installation, wiring, and operation of lighting systems.
They specify the minimum requirements for electrical components, such as switches, fixtures, and wiring methods.
Codes address issues like proper grounding, circuit protection, and voltage limitations to prevent electrical...
based on 1 interview experience
Difficulty level
Duration
based on 6 reviews
Rating in categories
Design Engineer
81
salaries
| ₹5 L/yr - ₹11 L/yr |
Structural Design Engineer
55
salaries
| ₹5.6 L/yr - ₹12.4 L/yr |
Consultant Engineer
51
salaries
| ₹4.8 L/yr - ₹9 L/yr |
Senior Engineer
35
salaries
| ₹7 L/yr - ₹14.5 L/yr |
Assistant Design Engineer
34
salaries
| ₹3 L/yr - ₹6 L/yr |
Suzlon Group
Torrent Power
Eaton
Vestas