i
Crosslynx
Filter interviews by
I appeared for an interview in Mar 2025, where I was asked the following questions.
Remove the N-th node from the end of a linked list efficiently using two-pointer technique.
Use two pointers: 'fast' and 'slow'.
Move 'fast' pointer N steps ahead.
Then, move both pointers until 'fast' reaches the end.
The 'slow' pointer will be at the node before the N-th from end.
Adjust pointers to remove the target node.
This task involves removing duplicates from a sorted list, ensuring each element appears only once.
Iterate through the list: Use a loop to traverse the sorted list and compare each element with the next one.
Use a new index: Maintain a separate index for the unique elements, copying over only the distinct values.
Example: For a sorted list [1, 1, 2, 3, 3], the result should be [1, 2, 3].
In-place modification: If required...
Top trending discussions
posted on 19 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.
Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.
Data structures are used to manage large amounts of data efficiently.
They provide a way to organize data in a way that makes it easy to access and manipulate.
Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.
Explain logic of stack
posted on 15 Jul 2024
Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.
Understanding the overall goals and objectives of the organization
Developing detailed action plans to achieve those goals
Assigning tasks and responsibilities to team members
Monitoring progress and making adjustments as needed
Ensuring that resources are allocated efficiently
Communicating effectively w...
posted on 16 Oct 2024
My name is John Smith, a seasoned engineer with over 10 years of experience in the field.
Full name: John Smith
Years of experience: 10+
Engineering background
I have completed 10 projects in my career as a senior engineer.
Completed 10 projects in various industries such as automotive, aerospace, and telecommunications.
Led a team of engineers to successfully complete a project for a major automotive company.
Implemented new technologies in projects to improve efficiency and performance.
Collaborated with cross-functional teams to deliver projects on time and within budget.
posted on 17 Dec 2020
I applied via Referral and was interviewed in Jun 2020. There were 3 interview rounds.
posted on 10 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Concrete is a composite material made up of cement, water, aggregates, and sometimes admixtures.
Concrete is used in construction for building foundations, walls, floors, and other structures.
It is a durable and strong material that can withstand heavy loads and harsh weather conditions.
The strength and durability of concrete can be improved by adding reinforcing materials such as steel bars or fibers.
There are differen...
posted on 7 Nov 2019
The finishing process involves tiling, wall gypsum, plaster, and waterproofing with specific material proportions and properties.
The first step is to prepare the surface by cleaning and leveling it.
Waterproofing is done to prevent water damage to the walls and floors.
Gypsum plaster is used to create a smooth surface for painting or wallpapering.
Tiling involves laying tiles on the floor or walls using adhesive and grout...
I applied via Approached by Company and was interviewed in Aug 2021. There were 3 interview rounds.
About the site safety issue
posted on 28 Feb 2025
posted on 23 Jun 2025
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Software Engineer
13
salaries
| ₹5 L/yr - ₹9.6 L/yr |
Python Software Developer
5
salaries
| ₹4.5 L/yr - ₹12.5 L/yr |
Technical Writer
4
salaries
| ₹5.5 L/yr - ₹6.5 L/yr |
Module Lead
4
salaries
| ₹19.5 L/yr - ₹30 L/yr |
Senior Software Engineer
4
salaries
| ₹11.1 L/yr - ₹15 L/yr |
Millennium Engineers & Contractors
Karam Industries
MaRS Planning & Engineering Services
S V S Projects India