posted on 26 Jan 2025
The site relationship between client, consultant, and contractor is crucial for successful project execution.
Clear communication is key to ensure all parties are aligned with project goals and expectations.
Regular meetings and updates help in maintaining transparency and addressing any issues promptly.
Establishing a good working relationship based on trust and respect leads to smoother project progress.
Effective collab...
posted on 18 Jan 2022
posted on 24 Apr 2025
posted on 3 Feb 2022
I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 23 Aug 2022
I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
RL=HI-IS/FS is a formula used in civil engineering to calculate reduce level.
RL stands for reduce level
HI stands for height of instrument
IS stands for intermediate sight
FS stands for foresight
The formula is used to calculate the reduced level of a point on the ground relative to a benchmark
The benchmark is usually a known point with a known elevation
posted on 2 Aug 2024
Concurrency problem occurs when multiple threads access shared resources simultaneously, leading to unexpected behavior.
Use synchronization mechanisms like locks, semaphores, or monitors to control access to shared resources.
Avoid race conditions by ensuring that critical sections of code are executed atomically.
Consider using thread-safe data structures or immutable objects to minimize the risk of concurrency issues.
posted on 15 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 3 interview rounds.
Strings and array concepts
posted on 17 Nov 2022
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
based on 1 interview experience
Saudi Oger
Geo Designs And Research
Joannou & Paraskevaides
Shree Balaji Construction