Dusters Total Solutions Services Electrical Engineer Interview Questions and Answers

Updated 10 Oct 2024

Dusters Total Solutions Services Electrical Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is transformer vector group
  • Q2. Why we are desting vbd test in transformer
  • Ans. 

    VBD test is conducted in transformers to ensure insulation integrity and detect any potential faults.

    • VBD test helps in identifying any weak spots in the insulation of the transformer

    • It helps in preventing breakdowns and ensuring the safety and reliability of the transformer

    • By conducting VBD test, any potential faults can be detected early and necessary maintenance can be carried out

    • It is a standard procedure in transfo...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dusters Total Solutions Services Electrical Engineer interview:
  • Electricals
  • Documentation
Interview preparation tips for other job seekers - Any

Top trending discussions

View All
Interview Hub
1w
a client servicing executive
FeedCard Image
Got a question about Dusters Total Solutions Services?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about your self
  • Ans. Self introduction name education experience etc
  • Answered by Dinesh Dakhore
  • Q2. Why should hire you

Electrical Engineer Interview Questions Asked at Other Companies

Q1. What is the difference between Switchgear and Circuit Breakers?
Q2. What is ATS, transformer maintenance procedure, protection of tra ... read more
asked in Tata Steel
Q3. What are composite error and ratio error in a current transformer ... read more
Q4. 1. Power factor of transformer 2. types of DC machine 3. Working ... read more
Q5. How many types of transformers are there based on voltage transfe ... read more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Overall previous site infrastructure details
  • Ans. 

    Previous site infrastructure included data centers, networking equipment, servers, and storage systems.

    • Data centers were located in multiple regions for redundancy.

    • Networking equipment included routers, switches, and firewalls.

    • Servers were a mix of physical and virtual machines.

    • Storage systems used SAN and NAS technologies.

    • Backup and disaster recovery plans were in place.

    • Monitoring tools were used to track performance ...

  • Answered by AI
Round 2 - Case Study 

Multiple scenarios of UPS DG CHILLER FAILURES

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maintenance engineer
  • Q2. Facility management, inventory, MMR, DSR, DMR
Round 3 - Technical 

(2 Questions)

  • Q1. Only facility maintenance
  • Q2. Electrical, plumbing, HVAC, civil
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - I have seven years of experience as a Electrical Field in Building Electrical Maintenance.

As Engineer , Facility Engineer our working profile is to look all installed electrical equipments like Transformers DGs, UPS, LT panels, HT panels and all related systems are working properly or not. If found any issues then get it resolved immediately and report it to senior management and also keep it record in soft copy and hard copy as well.
My working profile is matching to your requirement and here I am attaching my CV for your reference.

Please find the attachment and if it is matching to your requirement then please contact me at ***** and XXXXX.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Hobbies

Interview Preparation Tips

Interview preparation tips for other job seekers - Frendly nature environment
Be interview-ready. Browse the most asked HR questions.
illustration image
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jun 2025, where I was asked the following questions.

  • Q1. What is the procedure for conducting a breakdown voltage test?
  • Ans. 

    A breakdown voltage test assesses the insulation strength of electrical components by applying high voltage until failure occurs.

    • 1. Prepare the test setup: Ensure all equipment is calibrated and safe for high voltage testing.

    • 2. Select the component: Choose the electrical device or insulation material to be tested.

    • 3. Apply voltage gradually: Increase the voltage slowly to avoid sudden breakdowns, monitoring the current.

    • ...

  • Answered by AI
  • Q2. What is the vector group test?
  • Ans. 

    The vector group test determines the phase relationship and connection type of transformers.

    • Identifies the phase displacement between primary and secondary windings.

    • Common vector groups include Yd11, Yy0, and Δy5.

    • Used to ensure compatibility in parallel operation of transformers.

    • Helps in understanding the neutral grounding and fault current paths.

  • Answered by AI
  • Q3. What is the insulation resistance (IR) test in a transformer?
  • Ans. 

    The insulation resistance test measures the resistance of a transformer's insulation to ensure safety and performance.

    • Insulation resistance is measured in ohms, indicating the quality of insulation.

    • A common test voltage is 500V or 1000V DC, depending on the transformer rating.

    • A high IR value (typically > 1 MΩ) indicates good insulation; low values suggest potential insulation failure.

    • The test helps prevent electrica...

  • Answered by AI
  • Q4. What is the turn ratio test?
  • Ans. 

    The turn ratio test measures the voltage transformation ratio of a transformer to ensure proper operation and efficiency.

    • It compares the primary and secondary winding turns of a transformer.

    • A typical turn ratio might be 10:1, meaning 10 turns on the primary for every 1 on the secondary.

    • The test helps identify issues like shorted turns or incorrect winding connections.

    • For example, if a transformer is rated for 240V/120V...

  • Answered by AI
  • Q5. What are the phase-to-phase angle and phase-to-neutral angle?
  • Ans. 

    Phase-to-phase angle is the angle between two phases, while phase-to-neutral angle is the angle between a phase and neutral.

    • In a three-phase system, the phase-to-phase angle is typically 120 degrees apart.

    • For example, in a balanced three-phase system, the voltage between any two phases (e.g., A and B) is 120 degrees.

    • The phase-to-neutral angle is 0 degrees for the neutral phase and varies for other phases.

    • In a star conn...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain clarity and honesty, and be prepared to discuss your skills.
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I appeared for an interview in Aug 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Why job thik Electrical filed
  • Q2. What this work electrical engineering
  • Ans. 

    Electrical engineering involves the study and application of electricity, electronics, and electromagnetism in various technologies.

    • Designing electrical circuits for devices like smartphones and computers.

    • Developing power generation systems, such as solar panels and wind turbines.

    • Working on control systems for automation in manufacturing processes.

    • Creating communication systems, including satellite and wireless technol...

  • Answered by AI
  • Q3. Total Experience this field

Interview Preparation Tips

Interview preparation tips for other job seekers - New company new knowledge new people
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Transformer,chillers dg set cooling towers etc
  • Q2. Utility maintenance documents

Interview Preparation Tips

Interview preparation tips for other job seekers - Plc scada hmi dcs preventive maintenance. Breakdown maintenance preventive maintenance

I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Why use in bukolze relay
  • Ans. Bukolze relay use in Transformer production
  • Answered by saferisotto
  • Q2. Why use in ct and pt
  • Ans. 

    CT and PT are used in electrical engineering for measurement and protection purposes.

    • CT (Current Transformer) is used to measure high currents and step them down to a level suitable for measurement instruments.

    • PT (Potential Transformer) is used to measure high voltages and step them down to a level suitable for measurement instruments.

    • CTs and PTs are also used for protection purposes, such as detecting faults and isola...

  • Answered by AI
  • Q3. How many Transformer production
  • Ans. 

    The number of transformer production varies depending on the company and market demand.

    • The number of transformer production is influenced by factors such as market demand, company size, and production capacity.

    • Large transformer manufacturers may produce thousands of transformers per year.

    • Smaller companies or custom transformer manufacturers may have lower production volumes.

    • The production volume can also vary based on ...

  • Answered by AI
  • Q4. How many type of breakers
  • Ans. Type off breakers, MCB, mccb, elcb, rcbo, ACB , VCB , OCB, sf6,...etc
  • Answered by saferisotto

Interview Preparation Tips

Interview preparation tips for other job seekers - Naukri.com side helps people a lot and get to learn a lot I want to thank you very much

Dusters Total Solutions Services Interview FAQs

How many rounds are there in Dusters Total Solutions Services Electrical Engineer interview?
Dusters Total Solutions Services interview process usually has 1 rounds. The most common rounds in the Dusters Total Solutions Services interview process are Technical.
How to prepare for Dusters Total Solutions Services Electrical Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dusters Total Solutions Services. The most common topics and skills that interviewers at Dusters Total Solutions Services expect are Fanuc, PLC and Siemens.
What are the top questions asked in Dusters Total Solutions Services Electrical Engineer interview?

Some of the top questions asked at the Dusters Total Solutions Services Electrical Engineer interview -

  1. Why we are desting vbd test in transfor...read more
  2. What is transformer vector gr...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Hard 100%

Duration

Less than 2 weeks 100%
View more
Dusters Total Solutions Services Electrical Engineer Salary
based on 6 salaries
₹3 L/yr - ₹4.3 L/yr
22% less than the average Electrical Engineer Salary in India
View more details

Dusters Total Solutions Services Electrical Engineer Reviews and Ratings

based on 6 reviews

4.3/5

Rating in categories

4.2

Skill development

4.3

Work-life balance

4.1

Salary

3.9

Job security

4.2

Company culture

2.5

Promotions

4.3

Work satisfaction

Explore 6 Reviews and Ratings
Housekeeping Supervisor
75 salaries
unlock blur

₹1.4 L/yr - ₹3.5 L/yr

Facility Executive
58 salaries
unlock blur

₹2.2 L/yr - ₹6.4 L/yr

Operations Manager
33 salaries
unlock blur

₹4.4 L/yr - ₹10.4 L/yr

Shift Engineer
27 salaries
unlock blur

₹2.7 L/yr - ₹4.6 L/yr

Assistant Manager
21 salaries
unlock blur

₹4.8 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Dusters Total Solutions Services with

Sodexo

4.0
Compare

Compass Group Support Services

4.0
Compare

ISS Facility Services

4.0
Compare

BVG India

4.0
Compare
write
Share an Interview