Upload Button Icon Add office photos

Gannon Dunkerley & Co.

Compare button icon Compare button icon Compare

Filter interviews by

Gannon Dunkerley & Co. Civil Site Engineer Interview Questions and Answers

Updated 23 Aug 2023

Gannon Dunkerley & Co. Civil Site Engineer Interview Experiences

2 interviews found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Civil engineering
  • Q2. What is a structure
  • Q3. Types of Concrete
  • Ans. 

    Types of concrete include ready-mix concrete, precast concrete, reinforced concrete, and shotcrete.

    • Ready-mix concrete is produced in a batching plant and delivered to the construction site in a plastic condition.

    • Precast concrete is cast in a reusable mold or form and cured in a controlled environment before being transported to the construction site.

    • Reinforced concrete contains steel reinforcement bars to increase its ...

  • Answered by AI
  • Q4. Grades of concrete
  • Ans. 

    Grades of concrete refer to the strength of the concrete mix design.

    • Grades of concrete are denoted by M10, M15, M20, etc. where 'M' stands for mix and the number denotes the compressive strength in MPa.

    • Higher grade concrete has higher compressive strength and is used for structural purposes.

    • Common grades include M25, M30, M35, and M40 for heavy-duty structures.

    • The mix proportions vary for different grades of concrete t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have confidence

Skills evaluated in this interview

I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Grade M20 What does M mean & 20 mean ?
  • Ans. 

    M20 is a grade of concrete used in construction. M stands for mix and 20 represents the compressive strength of the concrete in megapascals (MPa).

    • M stands for mix, indicating the type of concrete mix used

    • 20 represents the compressive strength of the concrete in MPa

    • M20 is commonly used for general construction purposes

    • Higher grades like M25, M30, etc., have higher compressive strengths

  • Answered by AI
  • Q2. Why do you want to join the company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Auto level machine , what is uses of auto level machine & Total station machine
Total station machine

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum grade of concrete used in RCC works?
Q2. If you have a 10x10 feet room and you have 600x600 mm size tiles, ... read more
asked in TCE
Q3. If your M50 concrete's 28-day cube test result is below 100%, wha ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the shelf life of an open bag of cement?

Top trending discussions

View All
Interview Hub
4d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Gannon Dunkerley & Co.?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Ans. 

    A man day is a unit of measure representing the amount of work one person can complete in a single day.

    • Typically used in project management to estimate labor costs and timelines.

    • One man day usually equals 8 hours of work.

    • For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.

    • Helps in resource allocation and planning for projects.

  • Answered by AI
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Referral

Interview Questionnaire 

1 Question

  • Q1. Steel structure and billing contractor salary discussion

Interview Preparation Tips

General Tips: My interview best and excellent as per CIVIL ENGINEER job regarding.
Skills: Communication, Body Language, Problem Solving, Analytical Skills, Leadership, Presentation Skills, Time Management, Decision Making Skills

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Gannon Dunkerley & Co. HR Interview Questions

10 questions and answers

Q. Share your experience.
Q. What is your dream?
Q. Tell me about yourself.

I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is M30 concrete
  • Q2. 1 cum rcc weight
  • Q3. What should be the rebar grade
  • Ans. 

    The rebar grade should be selected based on the design requirements and the structural load capacity.

    • The rebar grade is determined by the design engineer based on the structural requirements.

    • The grade of rebar is usually specified in the structural drawings and specifications.

    • The most commonly used rebar grades are 40, 60, and 75.

    • The higher the grade of rebar, the stronger it is and the more load it can bear.

    • The rebar ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always time follow technical specification .
Are these interview questions helpful?
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion

Gannon Dunkerley & Co. Interview FAQs

How many rounds are there in Gannon Dunkerley & Co. Civil Site Engineer interview?
Gannon Dunkerley & Co. interview process usually has 2 rounds. The most common rounds in the Gannon Dunkerley & Co. interview process are Resume Shortlist, One-on-one Round and Technical.
What are the top questions asked in Gannon Dunkerley & Co. Civil Site Engineer interview?

Some of the top questions asked at the Gannon Dunkerley & Co. Civil Site Engineer interview -

  1. Grade M20 What does M mean & 20 mea...read more
  2. What is a struct...read more
  3. Grades of concr...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3/5

based on 1 interview experience

Difficulty level

Easy 100%

Duration

Less than 2 weeks 100%
View more
Gannon Dunkerley & Co. Civil Site Engineer Salary
based on 42 salaries
₹2.1 L/yr - ₹4.2 L/yr
12% less than the average Civil Site Engineer Salary in India
View more details

Gannon Dunkerley & Co. Civil Site Engineer Reviews and Ratings

based on 27 reviews

3.4/5

Rating in categories

3.7

Skill development

2.8

Work-life balance

2.9

Salary

3.0

Job security

3.3

Company culture

2.7

Promotions

3.1

Work satisfaction

Explore 27 Reviews and Ratings
Senior Engineer
95 salaries
unlock blur

₹3.1 L/yr - ₹7.6 L/yr

Civil Engineer
54 salaries
unlock blur

₹2.2 L/yr - ₹6.3 L/yr

Civil Site Engineer
42 salaries
unlock blur

₹2.1 L/yr - ₹4.2 L/yr

Junior Engineer
41 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Assistant Manager
37 salaries
unlock blur

₹4.8 L/yr - ₹10.2 L/yr

Explore more salaries
Compare Gannon Dunkerley & Co. with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview