Shuttering and formwork are used interchangeably. Plaster ratio varies depending on the type of surface.
Shuttering and formwork are temporary structures used to support concrete until it sets.
Shuttering is typically used for vertical surfaces, while formwork is used for horizontal surfaces.
Plaster ratio varies depending on the type of surface. For example, the ratio for internal walls is 1:6, while for external walls i...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
A man day is a unit of measure representing the amount of work one person can complete in a single day.
Typically used in project management to estimate labor costs and timelines.
One man day usually equals 8 hours of work.
For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.
Helps in resource allocation and planning for projects.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.
I appeared for an interview in Sep 2024, where I was asked the following questions.
IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.
IS 456:2000 provides guidelines for plain and reinforced concrete design.
IS 10262:2019 outlines the procedure for concrete mix design.
Mix design considers factors like workability, strength, and durability.
Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).
The...
Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.
High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.
Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.
Design flexibility: Can be molded into complex shapes, allowing for inn...
Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.
Prepare the foundation: Ensure the base is level and clean before starting.
Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.
Lay the first block: Start at a corner, applying mortar to the bottom and sides.
Check alignment: Use a level to ensure blocks are straight and even.
Stagger ...
based on 1 interview experience
Difficulty level
Duration
based on 11 reviews
Rating in categories
Senior Engineer
95
salaries
| ₹3.1 L/yr - ₹7.6 L/yr |
Civil Engineer
54
salaries
| ₹2.2 L/yr - ₹6.3 L/yr |
Civil Site Engineer
42
salaries
| ₹2.1 L/yr - ₹4.2 L/yr |
Junior Engineer
41
salaries
| ₹2 L/yr - ₹6 L/yr |
Assistant Manager
37
salaries
| ₹4.8 L/yr - ₹10.2 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech