Maintenance processes ensure equipment reliability through systematic inspections, repairs, and preventive measures.
Regular inspections: Schedule routine checks to identify potential issues before they escalate.
Preventive maintenance: Implement scheduled maintenance tasks, like oil changes or filter replacements, to prolong equipment life.
Corrective maintenance: Address equipment failures promptly to minimize downtime,...
I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Feb 2022. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
To check the problem in a windvane showing false reading, first ensure it is properly aligned and calibrated. Then check for any obstructions or damage.
Ensure the windvane is properly aligned and calibrated according to manufacturer's instructions.
Check for any obstructions such as debris or bird nests that may be affecting the vane's movement.
Inspect the vane for any damage or wear that could be causing inaccurate rea...
Manpower on site is controlled through proper scheduling, supervision, communication, and monitoring.
Create a detailed schedule outlining tasks, deadlines, and manpower requirements.
Assign specific roles and responsibilities to each team member.
Regularly communicate with the team to ensure everyone is on the same page.
Supervise the work progress and address any issues or delays promptly.
Monitor the performance of each ...
IGBT stands for Insulated Gate Bipolar Transistor, a semiconductor device used for switching applications in power electronics.
IGBT is a type of transistor that combines the high efficiency of a bipolar junction transistor (BJT) with the high input impedance of a MOSFET.
It is commonly used in applications such as motor drives, inverters, and power supplies.
IGBTs are used for high power applications due to their ability...
I applied via Naukri.com and was interviewed before Jul 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Dec 2015. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Dec 2016. There were 5 interview rounds.
Developed a smart irrigation system using IoT technology for efficient water usage in agriculture.
Used sensors to monitor soil moisture levels
Implemented a control system to automate irrigation based on sensor data
Designed a user interface for farmers to monitor and control the system remotely
I implemented a new software tool that improved project efficiency by 20%.
Developed and implemented a new software tool to automate repetitive tasks
Reduced project timeline by 20% due to increased efficiency
Received positive feedback from team members on the impact of the new tool
We tried several designs for our prototype, including a modular design, a compact design, and a lightweight design.
Modular design: We explored the possibility of creating a prototype that could be easily assembled and disassembled for easy maintenance and upgrades.
Compact design: We experimented with reducing the size of the prototype to make it more portable and space-efficient.
Lightweight design: We tested different ...
I achieved significant results in my previous engineering projects.
Developed a new software system that increased efficiency by 30%
Reduced production costs by implementing a new manufacturing process
Improved product quality by implementing rigorous testing procedures
I am passionate about solving complex engineering problems and contributing to innovative projects.
Excited about the opportunity to work on cutting-edge technology
Passionate about problem-solving and finding creative solutions
Interested in collaborating with a talented team to achieve common goals
I would prioritize tasks, communicate with stakeholders, and work efficiently to meet the new deadline.
Prioritize tasks based on importance and urgency
Communicate with stakeholders to manage expectations and possibly negotiate a new deadline
Work efficiently by focusing on essential tasks and eliminating distractions
Consider delegating some work or seeking help if necessary
Innovation and progress excite me, while inefficiency and lack of communication upset me.
Excites: New technologies, solving complex problems, collaborating with talented individuals
Upsets: Inefficiency in processes, lack of communication within teams, resistance to change
My friends recently advised me to prioritize self-care and take breaks when needed.
Prioritize self-care to avoid burnout
Take breaks when feeling overwhelmed
Listen to your body and mind's needs
Examples: go for a walk, practice mindfulness, take a day off work
My passion lies in solving complex engineering problems and designing innovative solutions.
I enjoy working on challenging projects that require creative problem-solving skills
I am constantly seeking new technologies and methods to improve efficiency and effectiveness
I find fulfillment in seeing my designs come to life and making a positive impact on society
based on 3 interview experiences
Difficulty level
Duration
based on 1 review
Rating in categories
Electrical Engineer
140
salaries
| ₹2.1 L/yr - ₹5 L/yr |
Engineer
86
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Senior Engineer
72
salaries
| ₹3.6 L/yr - ₹6.7 L/yr |
Assistant Manager
68
salaries
| ₹4.7 L/yr - ₹8.5 L/yr |
Junior Engineer
53
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Suzlon Group
Adani Power
Adani Group
Torrent Power